GovChime
AWARDDOOther than small business

Do 0015HDR-CDM, A JOINT VENTURE

Overview

Award facts

Period of performance
Jan 24, 2013 to Apr 1, 2013
Ended
Modifications
3
Latest action Feb 8, 2013
Contract type
Do
PIID 0015

Description of requirement

TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#016350::RP# SANTA PAULA CREEK, CA THE ARCHITECT-ENGINEER (A-E) SHALL PREPARE A HYDROLOGY, HYDRAULICS, AND SEDIMENTATION APPENDIX, A GEOTECHNICAL FIELD INVESTIGATION AND REPORT, AND AN ENVIRONMENTAL ASSESSMENT (EA) TO SUPPORT DESIGN SOLUTIONS FOR SCOUR AND OVERTOPPING ISSUES, PREPARE A DESIGN DOCUMENTATION REPORT (DDR), AND PREPARE A BIOLOGICAL ASSESSMENT (BA) IN SUPPORT OF 90% CONSTRUCTION DRAWINGS AND SPECIFICATIONS FOR THE SANTA PAULA CREEK FLOOD CONTROL PROJECT LOCATED IN THE CITY OF SANTA PAULA. THE A-E SHALL INCORPORATE PROPOSED PROJECT INLET AND FISH LADDER DESIGN, AS DESCRIBED IN THE FIELD CHANGE REPORT, AND DEVELOP DESIGN SOLUTIONS RESOLVING BOTH THE TOE PROTECTION (SCOUR) ISSUE THROUGH THE UPPER REACHES OF THE PROJECT, AS WELL AS THE DOWNSTREAM OVERTOPPING ISSUES THAT WERE IDENTIFIED IN THE PRIOR WORK. THE SCOUR PROBLEM EXTENDS FROM IMMEDIATELY BELOW THE PROJECT INLET TO UPSTREAM OF THE RAILROAD BRIDGE. THE OVERTOPPING ISSUE FOR THE 28,000 CFS EVENT EXTENDS FROM THE VICINITY OF THE HIGHWAY 126 BRIDGES TO THE DOWNSTREAM END OF THE PROJECT ON BOTH SIDES OF THE CHANNEL. FINAL DESIGN MATERIAL WILL CONSIST OF CONTRACT DRAWINGS, SPECIFICATIONS, DESIGN BACKUP/CALCULATIONS, COST ESTIMATE, QUANTITY ESTIMATES, AND ENGINEERING CONSIDERATIONS AND INSTRUCTIONS FOR FIELD PERSONNEL (ECIFP). THE ABOVE DESIGN MATERIAL SHALL BE PREPARED IN ACCORDANCE WITH SOUND ENGINEERING JUDGMENT, ENGINEERING CRITERIA (FEDERAL, STATE AND LOCAL), US ARMY CORPS OF ENGINEERS (USACE, CORPS) POLICY, AND SHALL FOLLOW PROCEDURES OUTLINED IN THIS SCOPE OF WORK. IN ADDITION, THE WORK AND SERVICES SHALL INCLUDE ALL MANAGEMENT AND DOCUMENTATION OF COORDINATION ACTIVITIES REQUIRED TO SUCCESSFULLY PRODUCE ALL WORK IN ACCORDANCE WITH THIS SCOPE.

Dates and value

Award date
Signed on Sep 20, 2010
Potential end of performance
Mar 31, 2013
Parent contract vehicle
W912PL09D0033 (IDC, multiple award) — 19 orders recorded under it

The Department of Defense funded and awarded this contract. DoD contract actions are withheld at the source for about 90 days after signature, so actions signed after Aug 6, 2026 are not yet public.

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Feb 8, 2013. View on USAspending · Recipient on SAM.gov

Recipient

LocationIRVINE, CA
UEIDSZWH7KQKWZ4
Business sizeOther than small businessSize at award, per the contracting officer

Business types and certifications

For-profit organizationPartnership or LLP

Self-reported at the time of the action.

Agency and place

Awarding and funding

Awarded by
  1. Department of Defense
  2. Department Of The Army
  3. W075 ENDIST LOS ANGELES
Funded by
  1. Department of Defense
  2. Department Of The Army
  3. W075 ENDIST LOS ANGELES

Place of performance

Place of performance
Santa Paula, Ventura County, California 93060-2321
Congressional district (place of performance)
CA-26As reported at the time of the action

Classification and competition

Classification

Product or service (PSC)
C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING (service)

Competition

Extent competed
Full and open competitionA
Solicitation procedures
Subject to multiple award fair opportunityMAFO
Set-aside
No set-aside used
Contract pricing
Firm fixed priceJ
Offers received
1

Solicitation and notices

Solicitation ID
W912PL09R0017(as reported)

Contract details

Cost Accounting Standards clause
Yes - CAS clause includedY
Certified cost or pricing data
No
Contract financing
Percentage of completion progress paymentsC
Service Contract Act labor standards
Yes
Commercial procedures
Commercial item procedures not usedD
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Multi-year contract
No
Performance-based service acquisition
No - service where PBA is not used.N

Transaction history

Modification history

Base award
Sep 20, 2010Base obligation at award: $1,342,998
Latest action
Feb 8, 2013 — Other administrative actionModification 3; administrative: no change in scope or value
Latest substantive action
Sep 25, 2012 — Supplemental agreement (within scope)Modification 2; obligation change +$36,299
Actions by type
  • Base award1
  • Supplemental agreement (within scope)2
  • Other administrative action1
4 actions recorded, Sep 20, 2010 to Feb 8, 2013; each action counted once.

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Synopsized publicly (SAM.gov / FedBizOpps)
Yes
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No

Socio-economic and policy

Recovered materials and sustainability
FAR 52.223-4 includedA
EPA-designated product
Not requiredE
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC
Sea transportation
UnknownU

Structure

Award or IDV
Award
Award type
DoC
Parent vehicle type
IDCB
Parent vehicle: multiple or single award
Multiple awardM
Parent vehicle agency
Department of Defense9700
IT commercial item category
Not IT products or servicesZ
DoD claimant program
ServicesS1
Awarding agency code
9700
Awarding sub-tier code
2100
Contracting office code
W912PL
Transactions recorded under this award key
4

Funding

Funding agency code
9700
Funding sub-tier code
2100
Funding office code
W912PL