Definitive contract 140P4318C0066R FEDERICO COMPANY LLC
Overview
Award facts
- Net obligations
- $23.8K
- $23,800of $23.8K potential value
- Period of performance
- Sep 19, 2018 to Oct 18, 2018
- Ended
- Modifications
- 0
- Latest action Sep 19, 2018
- Contract type
- Definitive contract
- PIID 140P4318C0066
Description of requirement
THE GOVERNMENT REQUIRES THE EXCAVATION OF APPROXIMATELY A 6 FT BY 6 FT (SQUARE) PIT TO A DEPTH OF FOUR TO SIX FEET THAT ALLOWS FOR LOCATING AND REPLACING A WATER SUPPLY GATE VALVE. CONTRACTOR MUST PROVIDE THE BEST METHOD OF EXCAVATION AND REPLACEMENT OF VALVE. THE SCOPE INCLUDES CUTTING OPEN AN APPROXIMATE 6 FT X 6 FT OR SMALLER SECTION OF ASPHALT CENTERED ABOVE THE ACCESS HOLE FOR THE GATE VALVE, EXCAVATING THE BITUMINOUS FILL TO AN APPROPRIATE DEPTH TO LOCATE AND REPLACE THE BROKEN GATE VALVE. A NEW ACCESS MAIN TUBE WILL BE INSTALLED TO ALLOW FOR PROPER T WRENCH ACCESS TO THE WATER GATE VALVE FROM THE STREET SURFACE WITH AN APPROPRIATE SHUTOFF T WRENCH TOOL PROVIDED TO THE PARK BY THE CONTRACTOR. THE ACCESS POINT MUST BE DIRECTLY OVER THE VALVE WITH STRAIGHT ACCESS TO THE VALVE FOR PROPER ALIGNMENT OF THE T WRENCH. THIS OPERATION MUST BE TESTED AND SHOWN TO THE COR TO BE ACCESSIBLE AND FUNCTIONAL BEFORE COMPLETION OF WORK. THE PIT WITHIN THE STREET WILL BE BACKFILLED, COMPACTED AND RE-PATCHED WITH ASPHALT TO MASSACHUSETTS DEPARTMENT OF TRANSPORTATION STANDARDS. CONTRACTOR MUST PROVIDE ALL LABOR, MATERIAL, TOOLS AND EQUIPMENT NECESSARY FOR THE EXCAVATION, INSTALLATION, BACKFILL AND REPLACEMENT OF THE GATE VALVE AND ITS RECONNECTION TO THE EXISTING WATER SYSTEM. CONTRACTOR MUST USE OSHA APPROVED METHODS DURING THE ENTIRE PROJECT INCLUDING THE REPLACEMENT, REMOVAL, CLEANUP AND DISPOSAL OF ALL DEBRIS. THE WORK WILL MEET ALL THE REQUIRED CODES AND STANDARDS FOR THE STATE OF MASSACHUSETTS. CONTRACTOR MUST COORDINATE WITH THE COR FOR SHUTTING OFF THE WATER MAIN IN THE SYSTEM TO ISOLATE THE WORK TO BE DONE AT THE DESCRIBED LOCATION. UPON COMPLETION OF WORK PRIOR TO THE ASPHALT INSTALLATION THE CONTRACTOR WILL COORDINATE A VALVE FUNCTION AND ALIGNMENT TEST TO BE PERFORMED AND WITNESSED BY THE COR DEMONSTRATING THAT THE WATER GATE VALVE IS EASILY ACCESSIBLE AND FUNCTIONS PROPERLY.
Dates and value
- Award date
- Signed on Sep 19, 2018
- Potential end of performance
- Oct 17, 2018
- Current value
- $23,800Base and exercised options
- Potential value (if all options are exercised)
- $23,800
Obligations by fiscal year of action
- FY2018: $23,800
Total across 1 fiscal year: $23,800
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Sep 19, 2018. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- Department of the Interior
- National Park Service
- NER SERVICES MABO (43000)
- Funded by
- Department of the Interior
- National Park Service
- NER SERVICES MABO (43000)
- Funded from
- Park managementProgram activities014-1036Federal accounts (agency financial reports)
Place of performance
- Place of performance
- Charlestown, Suffolk County, Massachusetts 02129-4552
- Congressional district (place of performance)
- MA-07As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- Z2NEREPAIR OR ALTERATION OF WATER SUPPLY FACILITIES (service)
Competition
- Extent competed
- Competed under SAPF
- Solicitation procedures
- Simplified acquisitionSP1
- Set-aside
- Small business set aside - totalSBA
- Contract pricing
- Firm fixed priceJ
- Offers received
- 2
Solicitation and notices
- Solicitation ID
- 140P4318Q0087(as reported)
Contract details
- Subcontracting plan
- Plan not requiredB
- Cost Accounting Standards clause
- Not applicable exempt from CASX
- Certified cost or pricing data
- No
- Commercial procedures
- Commercial item procedures not usedD
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not bundledH
- Consolidated requirement
- Not consolidatedD
- Undefinitized action (terms not final)
- No
- Multi-year contract
- No
- Performance-based service acquisition
- No - service where PBA is not used.N
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Sep 19, 2018Base obligation at award: $23,800
- Latest action
- Sep 19, 2018 — Base awardModification 0; obligation change +$23,800
- Actions by type
- Base award1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Local area set-aside
- No
- Simplified procedures for commercial items
- No
- A-76 (FAIR Act) action
- No
Pricing and financing
- Paid by purchase card
- No
- Latest action: change in base and exercised options
- $23,800
- Latest action: change in base and all options
- $23,800
Socio-economic and policy
- Inherently governmental functions
- Other functionsOT
- Recovered materials and sustainability
- Bio-basedE
- EPA-designated product
- Meets requirementsA
- Clinger-Cohen Act planning (IT)
- No
- Construction wage rates (Davis-Bacon)
- Yes
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Country of product or service origin
- United statesUSA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- Definitive contractD
- Awarding agency code
- 1400
- Awarding sub-tier code
- 1443
- Contracting office code
- 140P43
- Transactions recorded under this award key
- 1
Funding
- Funding agency code
- 1400
- Funding sub-tier code
- 1443
- Funding office code
- 140P43
- Treasury accounts
- 014-2018/2018-1036-000
- Object classes
- 25.7: Operation and maintenance of equipment