Purchase order 80NSSC18P1899SOLID MATERIAL SOLUTIONS LLC
Overview
Award facts
- Net obligations
- $124.99K
- $124,990of $124.99K potential value
- Period of performance
- Feb 12, 2019 to Feb 15, 2019
- Ended
- Modifications
- 1
- Latest action Feb 12, 2019
- Contract type
- Purchase order
- PIID 80NSSC18P1899
Description of requirement
FUTURE HYBRID AIRCRAFT, SUCH AS NASA S N3-X PLAN, WILL REQUIRE ALL-SUPERCONDUCTING ELECTRIC MOTORS AND GENERATORS IN ORDER TO ACHIEVE POWER DENSITY IN EXCESS OF 10 KW/KG. UNLIKE THE DC ROTOR, THE STATOR MUST OPERATE IN AC MODE, FOR EXAMPLE, FROM 0-0.5 T AT 120 HZ, MAKING IT IMPOSSIBLE TO USE HIGH TEMPERATURE SUPERCONDUCTING (HTS) TAPES DUE TO THEIR HIGH LOSSES IN TRANSIENT FIELDS, REQUIRING INSTEAD HTS IN NARROW WIRE, FINE-FILAMENT FORM AND CABLED INTO A LOW-LOSS TRANSPOSED FORM. OUR INNOVATION CONSISTS OF AN ALL-HTS, LIGHTWEIGHT HIGH POWER MOTOR, IN WHICH THE STATOR COILS ARE WOUND WITH OUR UNIQUE LOW LOSS, TRANSPOSED CABLES, THAT IS IN TURN COMPRISED OF OUR NOVEL, STRONG, LOW LOSS, SMALL DIAMETER 2212 WIRES NOT WIDE TAPES, WHERE THE WIRES ARE SUFFICIENTLY NARROW, HAVE SUFFICIENTLY FINE FILAMENTS WITH ENHANCED MATRIX RESISTANCES BETWEEN THEM, AND AXIAL TWIST FOR THE REQUIRED LOW LOSSES IN TRANSIENT FIELD CONDITIONS WHILE PROVIDING THE OPERATING CURRENT DENSITY AND FIELD DISTRIBUTIONS AT 20 K FOR ACHIEVING>10 KW/KG SPECIFIC POWER THAT HAS BEEN SPECIFIED IN NASA SUBTOPIC A1.07. AS THE FIRST STEP, AN OPTIMIZED, PRACTICAL DESIGN WILL BE DEVELOPED FOR AN ALL-SUPERCONDUCTING, STRONG BI-2212 WIREBASED MACHINE USING A STATE OF THE ART DESIGN APPROACH. AS THE SECOND STEP, 2212-BASED WIRE AND CABLED CONDUCTOR SAMPLES FOR CHARACTERIZATION OF CRITICAL PROPERTIES WILL BE FABRICATED IN PART BY BUILDING ON THE RESULTS FROM STEP ONE, AND ALSO FROM PRIOR WORK COMPLETED BY SOLID MATERIAL SOLUTIONS ON REDUCING RAMPED FIELD LOSSES IN 2212 WIRES AND CABLES. AS THE THIRD STEP, PROPERTIES OF THE CABLES AND CONSTITUENT WIRES WILL BE TESTED , INCLUDING CRITICAL CURRENT AT 20 K AND IN FIELDS FROM 0 T TO 5 T. AS THE FINAL STEP, THE RESULTS WILL BE UTILIZED TO DEVELOP A 2212-BASED CONDUCTOR, STATOR AND MOTOR DESIGN THAT INCORPORATES FEATURES FOR ATTAINING THE TARGET AC LOSS LEVELS, WHILE ALSO MEETING ALL THE OTHER REQUIREMENTS, LIKE STRENGTH, JE AND MANUFACTURABILITY.
Dates and value
- Award date
- Signed on Jul 23, 2018
- Potential end of performance
- Feb 14, 2019
- Current value
- $124,990Base and exercised options
- Potential value (if all options are exercised)
- $124,990
Obligations by fiscal year of action
- FY2018: $124,990
Total across 1 fiscal year: $124,990
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Feb 12, 2019. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
- Funded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
- Funded from
- Space technology (DIRECT)Program activities080-0131Federal accounts (agency financial reports)
Place of performance
- Place of performance
- North Chelmsford, Middlesex County, Massachusetts 01863-1561
- Congressional district (place of performance)
- MA-03As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- AR11R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (BASIC RESEARCH) (research and development)
Competition
- Extent competed
- Full and open competition after exclusion of sourcesD
- Solicitation procedures
- Negotiated proposal/quoteNP
- Set-aside
- Small business set aside - totalSBA
- Contract pricing
- Firm fixed priceJ
- Offers received
- 500
Contract details
- Subcontracting plan
- Plan not requiredB
- Service Contract Act labor standards
- No
- Commercial procedures
- Commercial itemA
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not bundledH
- Consolidated requirement
- Not consolidatedD
- Undefinitized action (terms not final)
- No
- Performance-based service acquisition
- No - service where PBA is not used.N
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Jul 23, 2018Base obligation at award: $124,990
- Latest action
- Feb 12, 2019 — Other administrative actionModification P00001; administrative: no change in scope or value
- Actions by type
- Base award1
- Other administrative action1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Local area set-aside
- No
- Simplified procedures for commercial items
- No
- A-76 (FAIR Act) action
- No
Pricing and financing
- Paid by purchase card
- No
Socio-economic and policy
- Inherently governmental functions
- Other functionsOT
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
- Clinger-Cohen Act planning (IT)
- No
- Research program (SBIR/STTR)
- Small business innovation research program phase i actionSR1
- Walsh-Healey Act (materials and supplies)
- No
- Construction wage rates (Davis-Bacon)
- No
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Country of product or service origin
- United statesUSA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- Purchase orderB
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- 80NSSC
- Transactions recorded under this award key
- 2
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- 80NSSC
- Treasury accounts
- 080-2018/2019-0131-000
- Object classes
- 25.5: Research and development contracts