Purchase order 80NSSC18P1947TERENTIEV, ALEXANDRE
Overview
Award facts
- Net obligations
- $121.69K
- $121,686of $121.69K potential value
- Period of performance
- Feb 11, 2019 to Feb 15, 2019
- Ended
- Modifications
- 1
- Latest action Feb 11, 2019
- Contract type
- Purchase order
- PIID 80NSSC18P1947
Description of requirement
NASA IS DEVELOPING A COMMON LAUNCH INFRASTRUCTURE TO SUPPORT MULTIPLE TYPES OF ROCKETS. IN ORDER TO REDUCE COST AND SIMPLIFY SERVICE OF INFRASTRUCTURE, AUTOMATION OF MULTIPLE PROCESSES IS HIGHLY DESIRABLE. IN THIS APPROACH, AUTONOMOUS CONTROL TECHNOLOGIES PERFORM FUNCTIONS SUCH AS ANOMALY AND FAULT DETECTION, FAULT ISOLATION, DIAGNOSTICS AND PROGNOSTICS FOR CRITICAL COMPONENTS. THERE IS A CLEAR NEED FOR INSTRUMENTED MONITORING OF CRITICAL SEAL COMPONENTS OF THE PROPELLANT DELIVERY SYSTEM, SINCE A LOSS OF PROPELLANT LINES INTEGRITY CAN CAUSE GREAT DAMAGE, AS LEARNED FROM THE CHALLENGER ACCIDENT, WHICH WAS CAUSED BY A FAULTY O-RING. A TEAM OF PHYSICISTS AND ENGINEERS FROM AT-TEK WILL DESIGN, FABRICATE, AND TEST AN INEXPENSIVE ELASTOMER SEAL WITH AN EMBEDDED SENSOR THAT CAN BE IN-SITUINTERROGATED BY COMPACT ELECTRONICS BUILT INTO THE VACUUM FLANGE. THE INTEGRATED SMART SEAL PACKAGE CAN SELF-MONITOR SUCH PARAMETERS AS COMPRESSION AND ELASTICITY OF THE SEAL MATERIAL, BOTH OF WHICH ARE CRITICAL FOR PREVENTING CATASTROPHIC SEAL FAILURES. COMPARED TO PREVIOUS ATTEMPTS, AT-TEK S NOVEL APPROACH WILL DRAMATICALLY INCREASE THE SENSITIVITY OF THE DETECTION OF CRITICAL SEAL PARAMETERS AND REALIZE A PRACTICAL SMART SEAL FOR THE FIRST TIME. THE ULTIMATE GOAL OF THIS INNOVATION IS TO INTEGRATE A SMART SEAL INTO AN AUTONOMOUS PROPELLANT MANAGEMENT INFRASTRUCTURE, THUS ENABLING CONDITION-BASED MAINTENANCE (NOT TIME-BASED) OF CRITICAL ELASTOMER SEALS FOR THE FIRST TIME. ANOTHER ADVANTAGE OF SEAL MONITORING IS ABILITY TO DETECT DEGRADATION OF THE SEAL BEFORE ACTUAL FAILURE, WITH AN OPTION TO ADJUST PROCESS PARAMETERS (PRESSURE, TEMPERATURE, ETC) OR BYPASS THE DEGRADING CONNECTION WITHOUT ABORTING THE PROCESS. THIS WILL MINIMIZE THE RISK OF FAILURE EVEN IF MAINTENANCE OF DEGRADING SEAL IS NOT READILY POSSIBLE. IF SUCCESSFUL, THE AT-TEK SMART SEAL WILL FORM ANOTHER SMART ASSET INTEGRATED INTO NASA S AUTONOMOUS CONTROL TECHNOLOGIES SYSTEM.
Dates and value
- Award date
- Signed on Jul 23, 2018
- Potential end of performance
- Feb 14, 2019
- Current value
- $121,686Base and exercised options
- Potential value (if all options are exercised)
- $121,686
Obligations by fiscal year of action
- FY2018: $121,686
Total across 1 fiscal year: $121,686
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Feb 11, 2019. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
- Funded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
- Funded from
- Space technology (DIRECT)Program activities080-0131Federal accounts (agency financial reports)
Place of performance
- Place of performance
- Santa Rosa, California
Classification and competition
Classification
- Product or service (PSC)
- AR11R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (BASIC RESEARCH) (research and development)
Competition
- Extent competed
- Full and open competition after exclusion of sourcesD
- Solicitation procedures
- Negotiated proposal/quoteNP
- Set-aside
- Small business set aside - totalSBA
- Contract pricing
- Firm fixed priceJ
- Offers received
- 500
Contract details
- Subcontracting plan
- Plan not requiredB
- Service Contract Act labor standards
- No
- Commercial procedures
- Commercial itemA
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not bundledH
- Consolidated requirement
- Not consolidatedD
- Undefinitized action (terms not final)
- No
- Performance-based service acquisition
- No - service where PBA is not used.N
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Jul 23, 2018Base obligation at award: $121,686
- Latest action
- Feb 11, 2019 — Other administrative actionModification P00001; administrative: no change in scope or value
- Actions by type
- Base award1
- Other administrative action1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Local area set-aside
- No
- Synopsized publicly (SAM.gov / FedBizOpps)
- No
- Simplified procedures for commercial items
- No
- A-76 (FAIR Act) action
- No
Pricing and financing
- Paid by purchase card
- No
Socio-economic and policy
- Inherently governmental functions
- Other functionsOT
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
- Clinger-Cohen Act planning (IT)
- No
- Research program (SBIR/STTR)
- Small business innovation research program phase i actionSR1
- Walsh-Healey Act (materials and supplies)
- No
- Construction wage rates (Davis-Bacon)
- No
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Country of product or service origin
- United statesUSA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- Purchase orderB
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- 80NSSC
- Transactions recorded under this award key
- 2
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- 80NSSC
- Treasury accounts
- 080-2018/2019-0131-000
- Object classes
- 25.5: Research and development contracts