Definitive contract 80NSSC19C0021DISCOVERY SEMICONDUCTORS, INC.
Overview
Award facts
- Net obligations
- $734.29K
- $734,291of $1.26M potential value
- Outlays (paid to date)
- $374.35K
- $374.35K paid of $734.29K obligated$374,346
- Period of performance
- Mar 27, 2019 to Oct 23, 2020
- Ended
- Modifications
- 6
- Latest action Dec 15, 2020
- Contract type
- Definitive contract
- PIID 80NSSC19C0021
Contract value is the most the government could spend; obligations are what it has legally committed; outlays are what it has actually paid.
Description of requirement
NASA REQUIRES FIVE VARIATIONS OF SHORT-WAVE INFRARED (SWIR) INGAAS PHOTODIODE SUBASSEMBLIES FOR THE PLANKTON, AEROSOL, CLOUD, OCEAN ECOSYSTEM (PACE) MISSION. AS DESCRIBED IN NASA S REQUEST FOR PROPOSAL, OCI-DET-SOW-0067 AND OCI-DET-SPEC- 0015 DOCUMENTS, THE PRIMARY TECHNICAL CHALLENGE FOR THESE INGAAS PHOTODIODES IS TO ACHIEVE A CAPACITANCE LESS THAN 11 PF AT NEAR PHOTOVOLTAIC OPERATION WITH AN ACTIVE AREA DIAMETER OF 350M. SUCH A LOW CAPACITANCE DEVICE REQUIRES AN INGAAS PHOTODIODE STRUCTURE HAVING A CAPACITANCE PER UNIT AREA OF<114 PF / MM2 AT A REVERSE BIAS OF 100 MV. ALSO, THESE DEVICES MUST WITHSTAND A PROTON RADIATION UP TO A FLUENCE LEVEL OF 2E10 / CM2 FOR AN ENVISIONED 3-YEAR LONG MISSION. THESE PHOTODIODES MUST BE INTEGRATED WITH JFET AMPLIFIERS IN A KOVAR PACKAGE, BOTH SUPPLIED BY NASA GODDARD SPACE FLIGHT CENTER (GSFC), TO MANUFACTURE SPACE-QUALIFIED PHOTODIODE SUBASSEMBLIES. DISCOVERY SEMICONDUCTORS SUBMITTED A PROPOSAL, TITLED SHORT-WAVE INFRARED INGAAS PHOTODIODE FOR OPTICAL COLOR INSTRUMENT (OCI) OF PACE MISSION, ON NOVEMBER 30, 2018. THE PROPOSAL LEVERAGED OUR PRIOR WORK IN DEVELOPING RAD-HARD, ULTRA-LOW NOISE, LARGE AREA INGAAS QUADRANT PHOTORECEIVERS FOR THE LASER INTERFEROMETER SPACE ANTENNA (LISA) MISSION, TO MANUFACTURE THE PACE PHOTODIODE FLIGHT UNITS. NASA REVIEWED OUR PROPOSAL AND SUGGESTED SPLITTING THE ACTIVITIES INTO THE FOLLOWING THREE OPTIONS FOR BUDGETARY REASONS: OPTION 1: PROCESS 350M DIAMETER PHOTODIODE CHIPS, AND DELIVER 10 CHIPS IN DIE FORM IN A GEL-PAK. OPTION 2: DESIGN AND MANUFACTURE (1) PHOTODIODE SUBMOUNT, (2) MOTHERBOARD SUBSTRATE, AND (3) CONTAINER NEEDED TO DEVELOP THE PHOTODIODE SUBASSEMBLY FLIGHT UNITS. WE WILL DELIVER 10 PHOTODIODE CHIPS MOUNTED ON PHOTODIODE SUBMOUNT AND MOTHERBOARD SUBSTRATE. OPTION 3: MANUFACTURE AND DELIVER 18 PHOTODIODE SUBASSEMBLY FLIGHT UNITS AND 18 FLIGHT SPARES WITH SUPPORTING DOCUMENTATION. DISCOVERY ANTICIPATES THE ENTIRE EFFORT TO BE FUNDED AND WILL PERFORM THE VARIOUS TECHNICAL TASKS AS DESCRIBED IN OUR ORIGINAL PROPOSAL SUBMITTED ON NOVEMBER 30, 2018. THIS ADDENDUM DEFINES THE TASKS CATEGORIZED ACCORDING TO THE THREE OPTIONS AND THE CORRESPONDING BUDGET.
Dates and value
- Award date
- Signed on Mar 27, 2019
- Potential end of performance
- Oct 22, 2020
- Current value
- $734,291Base and exercised options
- Potential value (if all options are exercised)
- $1,255,245
Obligations by fiscal year of action
- FY2021: -$254,365 (de-obligation)
- FY2019: $988,656
Total across 2 fiscal years: $734,291
Net de-obligation in that fiscal year (obligations withdrawn).
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Dec 15, 2020. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
- Funded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
- Funded from
- Science (DIRECT)Program activities080-0120Federal accounts (agency financial reports)
Place of performance
- Place of performance
- Ewing, Mercer County, New Jersey 08628-3200
- Congressional district (place of performance)
- NJ-12As reported at the time of the action
Classification and competition
Classification
Competition
- Extent competed
- Not competedC
- Reason not competed
- Only one source-other (FAR 6.302-1 other)ONE
- Solicitation procedures
- Only one sourceSSS
- Set-aside
- No set-aside used
- Contract pricing
- Firm fixed priceJ
- Offers received
- 1
Contract details
- Subcontracting plan
- Plan not requiredB
- Cost Accounting Standards clause
- No - CAS waiver approvedN
- Certified cost or pricing data
- No
- Service Contract Act labor standards
- No
- Commercial procedures
- Commercial item procedures not usedD
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not bundledH
- Consolidated requirement
- Not consolidatedD
- Undefinitized action (terms not final)
- No
- Multi-year contract
- Yes
- Performance-based service acquisition
- No - service where PBA is not used.N
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Mar 27, 2019Base obligation at award: $479,927
- Latest action
- Dec 15, 2020 — Funding onlyModification P00006; obligation change -$254,365; funding only: changes obligations, not scope
- Latest funding action
- Dec 15, 2020 — Funding onlyModification P00006; obligation change -$254,365; funding only: changes obligations, not scope
- Actions by type
- Base award1
- Other administrative action5
- Funding only1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Local area set-aside
- No
- Simplified procedures for commercial items
- No
- A-76 (FAIR Act) action
- No
Pricing and financing
- Paid by purchase card
- No
- Latest action: change in base and exercised options
- -$254,365
- Latest action: change in base and all options
- -$254,365
Socio-economic and policy
- Inherently governmental functions
- Other functionsOT
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
- Clinger-Cohen Act planning (IT)
- No
- Walsh-Healey Act (materials and supplies)
- No
- Construction wage rates (Davis-Bacon)
- No
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Country of product or service origin
- United statesUSA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- Definitive contractD
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- 80NSSC
- Transactions recorded under this award key
- 7
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- 80NSSC
- Treasury accounts
- 080-2019/2020-0120-000
- Object classes
- 25.5: Research and development contracts
- Disaster or emergency funding (DEFC)
- Q: Not Designated Nonemergency/Emergency/Disaster/Wildfire Suppression