Definitive contract 80NSSC19C0062N&R ENGNERING MGT SUPPORT SVCS

Overview

Award facts

Net obligations
$49.85K
$49,845of $49.85K potential value
Period of performance
Jul 20, 2019 to May 19, 2020
Ended
Modifications
1
Latest action Dec 13, 2019
Contract type
Definitive contract
PIID 80NSSC19C0062

Description of requirement

THE PROPOSAL FOR THE PHASE II EXTENSION IS TO ADDRESS A SIGNIFICANT ISSUE THAT AROSE DURING THE PHASE II WORK. SIC/SIC CMC MATERIALS HAVE STRENGTH VERSUS TEMPERATURE CHARACTERISTICS DIFFERENT FROM CONVENTIONAL METALLIC HPT TURBINE BLADE MATERIALS. IT IS NOT FEASIBLE TO COOL SIC/SIC CMC BLADES IN ORDER TO ACHIEVE STRENGTHS SIGNIFICANTLY HIGHER THAN THEIR STRENGTH AT THEIR UPPER USE TEMPERATURE. SIC/SIC CMC BLADES HAVE HIGHER TEMPERATURE CAPABILITY THAN CONVENTIONAL METALLIC BLADES, AND BOTH MATERIALS HAVE NEARLY EQUAL STRENGTHS AT THEIR RESPECTIVE UPPER USE TEMPERATURES. AT TEMPERATURES BELOW THEIR UPPER USE TEMPERATURES THE STRENGTH INCREASE AS TEMPERATURE DECREASES IS MUCH LESS FOR SIC/SIC CMC MATERIALS THAN FOR CONVENTIONAL METALLIC BLADE MATERIALS. THE CONSEQUENCE OF THESE DIFFERENT STRENGTH VERSUS TEMPERATURE RELATIONSHIPS IS THAT THE STRENGTH OF A SECOND STAGE SIC/SIC BLADE DETERMINES THE HIGH PRESSURE SHAFT RPM. REDUCING THE HIGH PRESSURE SHAFT RPM INCREASES ENGINE WEIGHT. THE PROPOSED WORK IS TO EXAMINE TWO APPROACHES TO REDUCE HPT BLADE STRESSES, WITHOUT INCURRING A SIGNIFICANT REDUCTION IN STAGE EFFICIENCY. THE FIRST APPROACH IS TO INCREASE BLADE THROUGH FLOW VELOCITY, WHICH REDUCES THE ANNULUS FLOW AREA. REDUCING THE ANNULUS FLOW AREA REDUCES CENTRIFUGAL STRESSES. THE SECOND APPROACH IS TO ANALYZE HIGHLY TAPERED ROTOR BLADES. TAPERING BLADES TO REDUCE THE TIP-TO-HUB AXIAL CHORD RATIO ALSO REDUCES CENTRIFUGAL STRESSES. BOTH STRUCTURAL AND CFD BLADE ROW EFFICIENCY ANALYSES ARE NEEDED. THE TWO APPROACHES ARE NOT EXCLUSIVE, AND MAY BE COMBINED TO ACHIEVE AN OPTIMUM SIC/SIC BLADE CONFIGURATION. WHILE THE FOCUS OF THE WORK IS THE SECOND STAGE BLADE, THE RESULTS ARE APPLICABLE TO THE FIRST STAGE BLADE. WHEN STATOR AND ROTOR BLADES OF BOTH HPT STAGES ARE SIC/SIC BLADES THE MAXIMUM FUEL BURN BENEFIT FROM USING CMC IS ACHIEVED. THE PROPOSED WORK SEEKS TO REDUCE OR ELIMINATE THE CONSTRAINTS IMPOSED ON THE HIGH PRESSURE COMPONENTS BY THE SECOND STAGE BLADE. THE CONSTRAINTS ARE DUE TO THE STRENGTH VERSUS TEMPERATURE CHARACTERISTICS OF SIC/SIC MATERIALS. THE PROPOSED WORK FURTHERS NASA S GOAL OF REDUCED FUEL BURN FOR AIRCRAFT ENGINES. THE NOMINAL N+3 SINGLE AISLE AIRCRAFT ENGINE HAS A TWO STAGE HPT WITH AN OVERALL PRESSURE RATIO OF FOUR. A TOTAL-TO-TOTAL PRESSURE RATIO OF TWO PER STAGE ALLOWS A RELATIVELY HIGH AXIAL MACH NUMBER BEFORE SONIC CONDITIONS ARE REACHED IN EITHER THE STATOR OR ROTOR. PRELIMINARY ANALYSES SHOW THAT SIGNIFICANT STRESS REDUCTIONS CAN BE ACHIEVED FOR EITHER APPROACH WITHOUT A LARGE STAGE AERODYNAMIC EFFICIENCY PENALTY. THE PHASE II WORK SHOWED THAT A 20% REDUCTION IN HP SHAFT SPEED FROM THE N+3 NOTIONAL SHAFT SPEED WAS REQUIRED TO ACHIEVE ACCEPTABLE SIC/SIC CMC BLADE STRESSES. PRELIMINARY ANALYSES INDICATE THAT ACCEPTABLE BLADE STRESSES CAN BE ACHIEVED AT THE N+3 NOTIONAL HP SHAFT SPEED WITH HIGHER THROUGH FLOW AND TAPERED ROTOR BLADES. IN SUMMARY THE PROPOSED WORK IS TO PERFORM STRUCTURAL AND CFD ANALYSES FOR FOUR TURBINE BLADE CON- FIGURATIONS. THESE ARE TWO HIGH THROUGH FLOW CONFIGURATIONS, A TAPERED BLADE CONFIGURATION, AND A COMBINED HIGH THROUGH FLOW PLUS TAPERED BLADE CONFIGURATION. THE REFERENCE CASES FOR THESE ANALYSES HAVE BEEN AN- ALYZED AS PART OF THE PHASE II WORK. FOR THE HIGH THROUGH FLOW CASES STRUCTURAL AND CFD ANALYSES WILL BE DONE FOR BOTH SHROUDED AND UNSHROUDED BLADES. THE EFFICIENCY GAIN DUE TO SHROUDING INCREASES AS THE THROUGH FLOW VELOCITY INCREASES. INCREASING THROUGH FLOW VELOCITY DECREASES ANNULUS HEIGHT AND INCREASES THE CLEARANCE-TO-SPAN RATIO. A HIGHLY TAPERED BLADE IS NOT EXPECTED TO PROVIDE SUFFICIENT STRUCTURAL SUPPORT FOR A SHROUD. FOR EACH CASE THE RESULTS WILL SHOW THE BENEFIT IN TERMS OF REDUCED STRESSES AND THE CHANGE IN STAGE EFFICIENCY.

Dates and value

Award date
Signed on Jun 13, 2019
Potential end of performance
May 18, 2020
Current value
$49,845Base and exercised options
Potential value (if all options are exercised)
$49,845

Obligations by fiscal year of action

  • FY2019: $49,845

Total across 1 fiscal year: $49,845

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Dec 13, 2019. View on USAspending · Recipient on SAM.gov

Recipient

LocationCLEVELAND, OH
UEIL3UNFWGGDL84
CAGE code1TW01
Business sizeSmall businessSize at award, per the contracting officer
Organization typeCorporate not tax exempt

Business types and certifications

Minority-ownedSelf-certified small disadvantaged businessFor-profit organizationCorporation (not tax-exempt)

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER
Funded from
Aeronautics (DIRECT)Program activities080-0126Federal accounts (agency financial reports)

Place of performance

Place of performance
Cleveland, Cuyahoga County, Ohio 44130-3821
Congressional district (place of performance)
OH-07As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Full and open competition after exclusion of sourcesD
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
Small business set aside - totalSBA
Contract pricing
Firm fixed priceJ
Offers received
500

Contract details

Subcontracting plan
Plan not requiredB
Cost Accounting Standards clause
No - CAS waiver approvedN
Certified cost or pricing data
No
Service Contract Act labor standards
No
Commercial procedures
Commercial item procedures not usedD
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not bundledH
Consolidated requirement
Not consolidatedD
Undefinitized action (terms not final)
No
Multi-year contract
No
Performance-based service acquisition
No - service where PBA is not used.N

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Jun 13, 2019Base obligation at award: $49,845
Latest action
Dec 13, 2019 — Other administrative actionModification P00001; administrative: no change in scope or value
Actions by type
  • Base award1
  • Other administrative action1
2 actions recorded, Jun 13, 2019 to Dec 13, 2019; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Local area set-aside
No
Simplified procedures for commercial items
No
A-76 (FAIR Act) action
No

Pricing and financing

Paid by purchase card
No

Socio-economic and policy

Inherently governmental functions
Other functionsOT
Recovered materials and sustainability
No clauses included and no sustainability includedC
EPA-designated product
Not requiredE
Clinger-Cohen Act planning (IT)
No
Research program (SBIR/STTR)
Small business innovation research program phase iii actionSR3
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Country of product or service origin
United statesUSA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
Definitive contractD
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
80NSSC
Transactions recorded under this award key
2

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
80NSSC
Treasury accounts
  • 080-2019/2020-0126-000
Object classes
  • 25.5: Research and development contracts