Dca DTFAGL08C00272DSM EXTERIORS INC
Overview
Award facts
- Period of performance
- Sep 23, 2008 to Nov 15, 2008
- Ended
- Modifications
- 0
- Latest action Sep 23, 2008
- Contract type
- Dca
- PIID DTFAGL08C00272
Description of requirement
FURNISH ALL NECESSARY MATERIALS, LABOR, EQUIPMENT, TOOLS AND SUPERVISION TO ERECT A PRE-ENGINEERED METAL BUILDING FOR THE INTERFERENCE MONITORING DETECTION SYSTEM (IMDS) VAN AT CHICAGO TRACON IN ELGIN, ILLINOIS. SCOPE OF WORK CONSISTS OF BUT IS NOT LIMITED TO THE FOLLOWING: A. PERFORM ALL SITEWORK NECESSARY TO INSTALL A FOUNDATION AND DRIVEWAY FOR THE BUILDING. B. ERECT A PRE-ENGINEERED METAL BUILDLING. THIS IS GOVERNMENT FURNISHED PROPERTY (GFP) THAT THE CONTRACTOR SHALL BE RESPONSIBLE FOR DELIVERING TO THE SITE FROM AN FAA LOCATION IN KANSAS CITY, WHERE IT IS CURRENTLY BEING WAREHOUSED. C. FURNISH AND INSTALL ELECTRICAL SERVICE FROM THE MOBILE AIR TRAFFIC CONTROL TOWER (ATCT) SITE, UNDER THE ROAD IN DIRETIONALLY-BORED CONDUIT, TO THE BUILDING SITE. D. REMOVE THE EXISTING PAVERS, GRAVEL, SUPPORTS, AND FOUNDATIONS FOR THE EXISTING SWITCH ADJACENT TO THE MOBILE ATCT, AND INSTALL NEW SUPPPORTS, FOUNDATION, AND ACCESS PAD. E. FURNISH AND INSTALL ALL ELECTRICAL, LIGHTING, AND LIGHTNING PROTECTION FOR THE BUILDING. F. REMOVE THE EXISTING GRAVEL AND EXCAVATION WASTE PILE ON THE SITE AND PROVIDE NEW GRASS IN THESE AREAS. REFURBISH ALL ADJACENT CONSTRUCTION DAMAGED GRASS AND ASPHALT TO THEIR PRE-CONSTRUCTION CONDITION. DETAILED SPECIFICATION FOR CONSTRUCTION OF THE BUILDING IS SHOWN IN ATTACHED SPECIFICATION NO. FAA-GL-2686 DATED JULY 11, 2008. ENGINEERING COST ESTIMATE IS ATTACHED. A LIST OF POSSIBLE BIDDERS FOR THE CONSTRUCTION CONTRACT IS ATTACHED. FAA AGL CONSTRUCTION AND MAINTENANCE PROJECT VENTILATION AND AIRBORNE CONTAMINANTS CHECKLIST IS ATTACHED. APPENDIX 1. FORM 3900-8, FAA PRE-CONSTRUCTION AND MAINTENANCE PROJECT SAFETY AND HEALTH CHECKLIST IS ATTACHED. ERECTION AND INSTALLATION DRAWINGS FOR ITEM 1 ARE ATTACHED CONSISTING OF: 1) COVER SHEET, C1 2) INSTALLATION PROCEDURES, SHEET ES01 3) ANCHOR BOLT PLANS AND BASE PLATE DETAILS, SHEETS F1 AND F2 4) ERECTION DRAWINGS, SHEETS E1 THROUGH E6 5) STANDARD DETAILS, SHEETS NS01 THROUGH NS04. CONTRACTOR SHALL INVENTORY ALL GOVERNMENT FURNISHED PROPERTY (LIST ATTACHED) AT TIME OF PICK-UP FROM THE CAVE IN KANSAS CITY AND IMMEDIATELY ADVISE THE RESIDENT ENGINEER OF ANY SHORTAGES, SURPLUS OR DAMAGE. WORK SHOULD BEGIN ON SEPTEMBER 8, 2008.
Dates and value
- Award date
- Signed on Sep 23, 2008
- Potential end of performance
- Nov 14, 2008
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Sep 23, 2008. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- Department of Transportation
- Federal Aviation Administration
- DEPT OF TRANS/FEDERAL AVIATION ADMIN
Place of performance
- Place of performance
- Saint Charles, Kane County, Illinois 60175-8101
- Congressional district (place of performance)
- IL-11As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- Y299CONTRUCT/ALL OTHER NON-BLDG FACS (service)
Competition
- Extent competed
- Full and open competitionA
- Solicitation procedures
- Simplified acquisitionSP1
- Set-aside
- No set-aside used
- Contract pricing
- Firm fixed priceJ
- Offers received
- 3
Contract details
- Subcontracting plan
- Plan not requiredB
- Cost Accounting Standards clause
- Not applicable exempt from CASX
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Multi-year contract
- No
- Performance-based service acquisition
- No - service where PBA is not used.N
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Sep 23, 2008Base obligation at award: $99,430
- Latest action
- Sep 23, 2008 — Base awardModification 0; obligation change +$99,430
- Actions by type
- Base award1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Simplified procedures for commercial items
- No
Pricing and financing
- Paid by purchase card
- No
- Latest action: change in base and exercised options
- $99,430
- Latest action: change in base and all options
- $99,430
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability incluC
- EPA-designated product
- Not requiredE
- Construction wage rates (Davis-Bacon)
- Yes
Structure
- Award or IDV
- Award
- Award type
- DcaD
- Awarding agency code
- 6900
- Awarding sub-tier code
- 6920
- Contracting office code
- 00014
- Transactions recorded under this award key
- 1
Funding
- Funding agency code
- 999