Period of performance
Sep 18, 2008 to Oct 31, 2008
Ended
Modifications
0
Latest action Sep 18, 2008
Contract type
Dca
PIID DTFAGL08C00347

Description of requirement

REMOVAL AND REPLACEMENT OF THE DUPAGE (DPA) VOR METAL ROOF WITH A NEW SINGLE PLY MEMBRANE ROOF SYSTEM. *** TECHNICAL QUESTIONS MAY BE REFERRED TO DAVE WEBER AT 847.508.5814. ALL OTHER QUESTIONS SHALL BE REFERRED TO LOIS FLICK AT 847.608.5743. *** SCOPE OF WORK: THE CONTRACTOR SHALL ACT ASA GENERAL CONTRACTOR AND SHALL FURNISH ALL LABOR, MATERIALS, SERVICES, INSURANCE, EQUIPMENT, ETC. TO REPLACE THE STAINLESS STEEL TERNE-PLATED METAL ROOF WITH A NEW SINGLE PLY ROOF MEMBRANE SYSTEM AT THE DUPAGE VOR, WEST CHICAGO, ILLINOIS. THIS WORK CONSISTS OF, BUT IS NOT LIMITED TO, THE FOLLOWING PRINCIPLE ITEMS: A. REMOVAL AND DISPOSAL OF THE EXISTING STAINLESS STEEL TERNE-PLATED METAL ROOF, INCLUDING ROSIN PAPER AND BASE FELT DOWN TO THE PLYWOOD DECKING. B. REMOVAL AND REPLACEMENT OF APPROXIMATELY 500 BOARD FEET OF 2X6 ROTTED WOOD DECKING. C. REMOVAL AND REINSTALLATION OF EIGHT (8) LADDER ANCHOR PLATES AROUND THE FIBERGLASS ANTENNA CONE IN LOCATIONS SHOWN ON THE PLANS. D. FURNISH AND INSTALL NEW 2"X8" PRESSURE TREATED WOOD NAILERS AROUND THE PERIMETER OF THE COUNTERPOISE ROOF. E. FURNISH AND INSTALL NEW GRACE & COMPANY ICE AND WATER SHIELD OR APPROVED EQUAL SELF-ADHERED WATER PROTECTION MEMBRANE, INCLUDING ALL RELATED MATERIALS REQUIRED FOR A COMPLETE INSTALLATION. F. FURNISH AND INSTALL NEW GALVANIZED 1/2" X 1/2", 16GA. STEEL MESH ON THE EXISTING WOOD DECK. G. FURNISH AND INSTALL NEW 1 1/2" OF POLYISOCYANURATE INSULATION TO THE ROOF SURFACE, EXCLUDING THE AREA WITHIN THE FIBERGLASS SHELTER. H. FURNISH AND INSTALL NEW SINGLE PLY FULLY ADHERED, PVC ROOF MEMBRANE OVER THE ENTIRE ROOF SURFACE AND INTERIOR OF THE FIBERGLASS ANTENNA SHELTER, INCLUDING FABRICATION AND INSTALLATION OF NEW SINGLE-PLY MEMBRANE, COPPER FLASHING, AND INSTALLATION OF NEW GROUND CONDUCTOR. I. FURNISH AND INSTALL NEW SINGLE-PLY WALKWAY TREADS FROM LADDER SUPPORTS AT ROOF EDGE TO THE ANTENNA SHELTER AND AROUND THE SHELTER, INCLUDING THE INSTALLATION OF NON-SLIP GRANULARS EMBEDDED IN ADHESIVE OVER THE NEW WALKWAY TREADS. J. FURNISH ANDSETUP ONE 56 FEET DIAMETER TARPAULIN TO COVER THE ROOF DURING INCLEMENT WEATHER DURING CONSTRUCTION. K. REPAINTING OF THE FIBERGLASS ANTENNA SHELTER INCLUDING REMOVAL OF THE DME ANTENNA, REMOVAL AND REINSTALLTION OF THE FIBERGLASS ANTENNA FABRICATION AND INSTALLATION OF NEW COPPER GROUND SEGMENTS ON THE ANTENNA SHELTER BASE. L. INSTALLATION OF A NEW 120V GFI OUTLET LOCATED IN THE ANTENNA SHELTER. M. ALL RELATED FABRICATION, INSTALLATION, ELECTRICAL AND GROUNDING WORK REQUIRED FOR A COMPLETE INSTALLATION. *** LETTER TO AIR TRAFFIC OFFICE/LETTER TO AIRPORT DISTRICT OFFICE/NOTICE OF PROPOSED CONSTRUCTION OR ALTERATION/NS STUDY: N/A SHUTDOWN SCHEDULE: THIS FACILITY WILL BE SHUT DOWN FOR 14 CALENDAR DAYS TO COMPLETE THIS PROJECT. THE SHUTDOWN WILL BE COORDINATED BY THE ELGIN TSOC ONCE A CONTRACT HAS BEEN AWARDED. FLIGHT CHECK: FLIGHT CHECK WILL BE REQUIRED WHEN ALL WORK HAS BEEN COMPLETED AND WILL BE COORDINATED BY THE ELGIN TSOC. PERFORMANCE TIME: ALL WORK IS TO BE ACCOMPLISHED DURING THE 14 CALENDAR DAY SHUTDOWN. THE CONTRACTOR SHALL ADJUST HIS/HER WORK SCHEDULE ACCORDINGLY TO ACCOMPLISH THIS WORK DURING THE FACILITY SHUTDOWN AT NO ADDITIONAL COST TO THE GOVERNMENT. PROJECT SCHEDULE: THIS WORK SHALL TAKE PLACE ONLY WHEN OUTDOOR TEMPERATURES ARE ABOVE 50 DEGREES FARENHEIGHT OR AS REQUIRED BY THE ROOF SYSTEM MANUFACTURER. MATERIALS: FURNISH AND DELIVER ALL MATERIALS AS DESCRIBED IN THE DRAWINGS AND SPECIFICATIONS (PROJECT FAA-C90-207) DATED 3/1/08. GOVERNMENT FURNISHED MATERIALS: THE GOVERNMENT SHALL FURNISH NEW ANTENNA SHELTER GASKET(S) AND ANTENNA SHELTER LIFTING SLING TO THE CONTRACTOR FOR USE AS PART OF THIS PROJECT. INSPECTION: RESIDENT ENGINEER ON THIS PROJECT WILL BE DAVE WEBER, TECHNICAL SUPPORT GROUP, ELGIN, IL. HIS TELEPHONE NUMBER IS 487.608.5814. MR. WEBER HAS COMPLETED COTR TRAINING. PROJECT FUNDING: APPROVED FY-08 UIS OPS FU

Dates and value

Award date
Signed on Sep 18, 2008
Potential end of performance
Oct 30, 2008

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Sep 18, 2008. View on USAspending · Recipient on SAM.gov

Recipient

LocationSAINT CHARLES, IL
UEIFBM2AGXQMZB7
Business sizeSmall businessSize at award, per the contracting officer
Parent companyDSM EXTERIORS INC

Business types and certifications

Women-ownedFor-profit organizationSubchapter S corporation

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. Department of Transportation
  2. Federal Aviation Administration
  3. DEPT OF TRANS/FEDERAL AVIATION ADMIN

Place of performance

Place of performance
Saint Charles, Kane County, Illinois 60175-8101
Congressional district (place of performance)
IL-11As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Not competedC
Solicitation procedures
Simplified acquisitionSP1
Set-aside
No set-aside used
Contract pricing
Firm fixed priceJ
Offers received
1

Contract details

Subcontracting plan
Plan not requiredB
Cost Accounting Standards clause
Not applicable exempt from CASX
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Multi-year contract
No
Performance-based service acquisition
No - service where PBA is not used.N

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Sep 18, 2008Base obligation at award: $68,155
Latest action
Sep 18, 2008 — Base awardModification 0; obligation change +$68,155
Actions by type
  • Base award1
1 actions recorded, Sep 18, 2008 to Sep 18, 2008; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No
Latest action: change in base and exercised options
$68,155
Latest action: change in base and all options
$68,155

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability incluC
EPA-designated product
Not requiredE
Construction wage rates (Davis-Bacon)
No

Structure

Award or IDV
Award
Award type
DcaD
Awarding agency code
6900
Awarding sub-tier code
6920
Contracting office code
00014
Transactions recorded under this award key
1

Funding

Funding agency code
999