Dca DTFH6809C00030A TEICHERT & SON INC
Overview
Award facts
- Period of performance
- Oct 18, 2011 to Oct 18, 2011
- Ended
- Modifications
- 11
- Latest action Oct 18, 2011
- Contract type
- Dca
- PIID DTFH6809C00030
Description of requirement
THE MAIN SCHEDULE FOR PROJECT CA PFH 137-1(4), WENTWORTH SPRINGS ROAD, CONSISTS OF THE REHABILITATION, RESTORATION, AND RESURFACING (3R) OF APPROXIMATELY 5.4 MILES OF FOREST HIGHWAY 137. REHABILITATION CONSISTS OF CONTINUOUS COLD RECYCLED ASPHALT BASE OVERLAIN WITH SUPERPAVE HOT ASPHALT CONCRETE PAVEMENT. THIS WILL BE A ONE-SEASON PROJECT. PRINCIPAL WORK ITEMS ON THE SCHEDULE INCLUDE: LUMP SUM CONTRACTOR TESTING; 3,410 LN FT OF SILT FENCE AND 1,870 LN FT OF SEDIMENT LOGS FOR SOIL EROSION CONTROL; 1,500 MGAL WATERING FOR DUST CONTROL; 1,470 LN FT OF PAVEMENT SAWCUTTING; 2,100 CU YD OF SUBEXCAVATION; 6,100 LN FT OF DITCH RECONDITIONING; 3,310 TONS OF ROADWAY AGGREGATE; 20,800 TONS OF SUPERPAVE PAVEMENT; 286 STATIONS OF CONTINUOUS COLD RECYCLED ASPHALT BASE; 725 LN FT OF PIPE CULVERT (VARIOUS SIZE); 3,800 LN FT OF STANDARD UNDERDRAIN SYSTEM; 4,670 LN FT OF ASPHALT CURB; 3,930 SQ YD OF ASPHALT PAVED DITCH; 640 LN FT OF GUARDRAIL SYSTEM; 1,920 HOURS OF TEMPORARY TRAFFIC CONTROL (FLAGGER AND PILOT CAR); AND 32 UTILITY LOCATION AREAS. IN ADDITION TO THE ABOVE, THE PROJECT INCLUDES SURVEY AND STAKING, REMOVAL ITEMS, RIPRAP AND REVET MATTRESS; SEEDING AND MULCHING, SIGNING AND PAVEMENT MARKING, SPECIAL LABOR AND EQUIPMENT CATEGORIES, AND TRAFFIC CONTROL DEVICES.
Dates and value
- Award date
- Signed on Jul 23, 2009
- Potential end of performance
- Oct 17, 2011
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Oct 18, 2011. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- Department of Transportation
- Federal Highway Administration
- CENTRAL FEDERAL LANDS HIGHWAY DIVISION
- Funded by
- Department of Transportation
- Federal Highway Administration
- CENTRAL FEDERAL LANDS HIGHWAY DIVISION
Place of performance
- Place of performance
- Placerville, El Dorado County, California 95667-3040 United States Of America
- Congressional district (place of performance)
- CA-05As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- Y222CONSTRUCT/HIGHWAYS-RDS-STS-BRDGS-RA (service)
Competition
- Extent competed
- Full and open competitionA
- Solicitation procedures
- Sealed bidSB
- Set-aside
- No set-aside used
- Contract pricing
- Firm fixed priceJ
- Offers received
- 4
Solicitation and notices
- Solicitation ID
- DTFH68-09-B-00025
- Notices
- Award Notice posted Jul 30, 2009
- Solicitation posted Jun 22, 2009
- Presolicitation posted Jun 19, 2009
- Presolicitation posted May 29, 2009
- Presolicitation posted May 29, 2009
- Presolicitation posted May 6, 2009
Contract details
- Subcontracting plan
- Plan required - incentive not includedC
- Cost Accounting Standards clause
- Not applicable exempt from CASX
- Service Contract Act labor standards
- No
- Commercial procedures
- Commercial item procedures not usedD
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Multi-year contract
- No
- Performance-based service acquisition
- No - service where PBA is not used.N
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Jul 23, 2009Base obligation at award: $1,383,269
- Latest action
- Oct 18, 2011 — CloseoutModification CM010; obligation change -$668,616; administrative: no change in scope or value
- Latest substantive action
- May 11, 2011 — New work added (outside scope)Modification CM009
- Actions by type
- Base award1
- Supplemental agreement (within scope)4
- Other administrative action4
- New work added (outside scope)2
- Closeout1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Synopsized publicly (SAM.gov / FedBizOpps)
- Yes
- Simplified procedures for commercial items
- No
Pricing and financing
- Paid by purchase card
- No
- Latest action: change in base and exercised options
- -$668,616
- Latest action: change in base and all options
- -$668,616
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
- Walsh-Healey Act (materials and supplies)
- No
- Construction wage rates (Davis-Bacon)
- Yes
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- DcaD
- Awarding agency code
- 6900
- Awarding sub-tier code
- 6925
- Contracting office code
- 00068
- Transactions recorded under this award key
- 12
Funding
- Funding agency code
- 6900
- Funding sub-tier code
- 6925
- Funding office code
- 00068