GovChime
AWARDDCAOther than small business

Dca DTFH6809C00030A TEICHERT & SON INC

Overview

Award facts

Period of performance
Oct 18, 2011 to Oct 18, 2011
Ended
Modifications
11
Latest action Oct 18, 2011
Contract type
Dca
PIID DTFH6809C00030

Description of requirement

THE MAIN SCHEDULE FOR PROJECT CA PFH 137-1(4), WENTWORTH SPRINGS ROAD, CONSISTS OF THE REHABILITATION, RESTORATION, AND RESURFACING (3R) OF APPROXIMATELY 5.4 MILES OF FOREST HIGHWAY 137. REHABILITATION CONSISTS OF CONTINUOUS COLD RECYCLED ASPHALT BASE OVERLAIN WITH SUPERPAVE HOT ASPHALT CONCRETE PAVEMENT. THIS WILL BE A ONE-SEASON PROJECT. PRINCIPAL WORK ITEMS ON THE SCHEDULE INCLUDE: LUMP SUM CONTRACTOR TESTING; 3,410 LN FT OF SILT FENCE AND 1,870 LN FT OF SEDIMENT LOGS FOR SOIL EROSION CONTROL; 1,500 MGAL WATERING FOR DUST CONTROL; 1,470 LN FT OF PAVEMENT SAWCUTTING; 2,100 CU YD OF SUBEXCAVATION; 6,100 LN FT OF DITCH RECONDITIONING; 3,310 TONS OF ROADWAY AGGREGATE; 20,800 TONS OF SUPERPAVE PAVEMENT; 286 STATIONS OF CONTINUOUS COLD RECYCLED ASPHALT BASE; 725 LN FT OF PIPE CULVERT (VARIOUS SIZE); 3,800 LN FT OF STANDARD UNDERDRAIN SYSTEM; 4,670 LN FT OF ASPHALT CURB; 3,930 SQ YD OF ASPHALT PAVED DITCH; 640 LN FT OF GUARDRAIL SYSTEM; 1,920 HOURS OF TEMPORARY TRAFFIC CONTROL (FLAGGER AND PILOT CAR); AND 32 UTILITY LOCATION AREAS. IN ADDITION TO THE ABOVE, THE PROJECT INCLUDES SURVEY AND STAKING, REMOVAL ITEMS, RIPRAP AND REVET MATTRESS; SEEDING AND MULCHING, SIGNING AND PAVEMENT MARKING, SPECIAL LABOR AND EQUIPMENT CATEGORIES, AND TRAFFIC CONTROL DEVICES.

Dates and value

Award date
Signed on Jul 23, 2009
Potential end of performance
Oct 17, 2011

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Oct 18, 2011. View on USAspending · Recipient on SAM.gov

Recipient

LocationSACRAMENTO, CA
UEIQTJ2MW61LH43
Business sizeOther than small businessSize at award, per the contracting officer
Parent companyTEICHERT INC.

Business types and certifications

For-profit organizationCorporation (not tax-exempt)

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. Department of Transportation
  2. Federal Highway Administration
  3. CENTRAL FEDERAL LANDS HIGHWAY DIVISION
Funded by
  1. Department of Transportation
  2. Federal Highway Administration
  3. CENTRAL FEDERAL LANDS HIGHWAY DIVISION

Place of performance

Place of performance
Placerville, El Dorado County, California 95667-3040 United States Of America
Congressional district (place of performance)
CA-05As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Full and open competitionA
Solicitation procedures
Sealed bidSB
Set-aside
No set-aside used
Contract pricing
Firm fixed priceJ
Offers received
4

Solicitation and notices

Solicitation ID
DTFH68-09-B-00025
Notices

Contract details

Subcontracting plan
Plan required - incentive not includedC
Cost Accounting Standards clause
Not applicable exempt from CASX
Service Contract Act labor standards
No
Commercial procedures
Commercial item procedures not usedD
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Multi-year contract
No
Performance-based service acquisition
No - service where PBA is not used.N

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Jul 23, 2009Base obligation at award: $1,383,269
Latest action
Oct 18, 2011 — CloseoutModification CM010; obligation change -$668,616; administrative: no change in scope or value
Latest substantive action
May 11, 2011 — New work added (outside scope)Modification CM009
Actions by type
  • Base award1
  • Supplemental agreement (within scope)4
  • Other administrative action4
  • New work added (outside scope)2
  • Closeout1
12 actions recorded, Jul 23, 2009 to Oct 18, 2011; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Synopsized publicly (SAM.gov / FedBizOpps)
Yes
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No
Latest action: change in base and exercised options
-$668,616
Latest action: change in base and all options
-$668,616

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability includedC
EPA-designated product
Not requiredE
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
Yes

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
DcaD
Awarding agency code
6900
Awarding sub-tier code
6925
Contracting office code
00068
Transactions recorded under this award key
12

Funding

Funding agency code
6900
Funding sub-tier code
6925
Funding office code
00068