GovChime
AWARDPOSmall business

Po GS02P11PHP0025HIRANI ENGINEERING AND LAND SURVEYING, D.P.C.

Overview

Award facts

Period of performance
Jan 7, 2011 to Jun 7, 2011
Ended
Modifications
0
Latest action Jan 7, 2011
Contract type
Po
PIID GS02P11PHP0025

Description of requirement

TREAT AIR SHAFT WITH METACRYLICS PRODUCTS TO SEAL WALLS AGAINST WATER INFILTRATION. THE WORK SHALL BE ACCOMPLISHED IN ACCORDANCE WITH METACRYLICS ENERGY EFFICIENT COATINGS PROPOSAL DATED NOVE 10, 2010 AND WITH THE FOLLOWING SCOPE OF WORK. SCOPE OF WORK: PROVIDE SUPERVISION, LABOR, ADMINISTRATIVE SUPPORT, SUPPLIES, MATERIALS, EQUIPMENT AND INSURANCE TO APPLY METACRYLICS ACRYLIC BASE AND STITCHBOARD POLYESTER FABRIC TO APPROXIMATELY 900 SQ FT OF WALL AND FLOOR SURFACE OF SHAFT WALLS. ALL WORK MUST BE PERFORMED IN COMPLIANCE WITH OSHA, NFPA, NEC AND EPA REGULATIONS/ CODES. WORK MAY BE PERFORMED DURING REGULAR BUSINESS HOURS AS LONG AS THE WORK DOES NOT DISTURB THE TENANTS. THE CONTRACTOR SHALL SCHEDULE THE WORK WITH GSA AND WITH LBB. PRIOR TO START OF WORK, PLEASE SUBMIT: 1. A LIST OF PERSONNEL WHO WILL BE ON SITE, THE LAST FOUR DIGITS OF THEIR SOCIAL SECURITY NUMBER AND THEIR DATE OF BIRTH; 2. LIST OF VEHICLES WITH LICENSE PLATES NUMBERS; 3. MSDS FOR ALL MATERIALS THAT WILL BE USED ON SITE. THE CONTRACTOR SHALL STRICTLY ADHERE TO ALL PRECAUTIONS NECESSARY TO THE SAFETY, HEALTH AND WELFARE OF THE WORKMEN IN ACCORDANCE WITH THE PROVISIONS OF THE US DEPARTMENT OF LABOR, THE OCCUPATIONAL SAFETY&HEALTH ADMINISTRATION (OSHA) 29 CFR 1926. THE CONTRACTOR SHALL DETERMINE THE NEED FOR AND SHALL ENSURE THE USE OF PERSONAL PROTECTIVE EQUIPMENT. IF NEEDED THE EQUIPMENT WILL MEET, AT A MINIMUM, THE REQUIREMENTS OF OSHA. THE CONTRACTOR SHALL, UPON REQUEST, PROVIDE DOCUMENTATION TO PROVE THAT MECHANICS WORKING ON THE PROJECT ARE LICENSED TO WORK ON YORK SCREW CHILLERS AND TRAINED IN OSHA SAFETY REGULATIONS. THE PROJECT SHALL BE CONSIDERED COMPLETED WHEN: 1. THE INFORMATION ABOVE IS RECEIVED IN WRITTEN FORM AND ACCEPTED BY GSA. 2. THE FRESH AIR SHAFT IS SEALED/ WATER TIGHT AND THE CHIEF OPERATING ENGINEER IS SATISFIED WITH THE WORK AND WITH THE RESULTS. FLOOD TESTING OF AREA MAY BE REQUIRED PRIOR TO FINAL PAYMENT. 3. ALL DEBRIS, MATERIALS, SUPPLIES AND EQUIPMENT HAS BEEN REMOVED FROM THE BUILDING. THE WORK AREAS ARE BROOM SWEPT AND LEFT IN A CLEAN AND ORDERLY CONDITION.

Dates and value

Award date
Signed on Jan 7, 2011
Potential end of performance
Jun 6, 2011

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jan 7, 2011. View on USAspending · Recipient on SAM.gov

Recipient

LocationJERICHO, NY
UEIL3NYL9LSWK21
Business sizeSmall businessSize at award, per the contracting officer

Business types and certifications

Minority-ownedSelf-certified small disadvantaged businessSBA 8(a) program participantFor-profit organizationCorporation (not tax-exempt)

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. General Services Administration
  2. Public Buildings Service
  3. GSA PBS R2 SERVICE CENTERS DIVISION
Funded by
  1. General Services Administration
  2. Public Buildings Service
  3. GSA PBS R2 SERVICE CENTERS DIVISION

Place of performance

Place of performance
New York, New York 10007-1316
Congressional district (place of performance)
NY-10As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Not competed under SAPG
Reason not competed
SAP non-competitionSP2
Solicitation procedures
Simplified acquisitionSP1
Set-aside
No set-aside used
Contract pricing
Firm fixed priceJ
Offers received
1

Contract details

Subcontracting plan
Plan not requiredB
Service Contract Act labor standards
No
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Performance-based service acquisition
No - service where PBA is not used.N

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Jan 7, 2011Base obligation at award: $24,450
Latest action
Jan 7, 2011 — Base awardModification 0; obligation change +$24,450
Actions by type
  • Base award1
1 actions recorded, Jan 7, 2011 to Jan 7, 2011; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Synopsized publicly (SAM.gov / FedBizOpps)
No
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No
Latest action: change in base and exercised options
$24,450
Latest action: change in base and all options
$24,450

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability incluC
EPA-designated product
Not requiredE
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
PoB
Awarding agency code
4700
Awarding sub-tier code
4740
Contracting office code
PH000
Transactions recorded under this award key
1

Funding

Funding agency code
4700
Funding sub-tier code
4740
Funding office code
PH000