Po GS02P11PHP0025HIRANI ENGINEERING AND LAND SURVEYING, D.P.C.
Overview
Award facts
- Period of performance
- Jan 7, 2011 to Jun 7, 2011
- Ended
- Modifications
- 0
- Latest action Jan 7, 2011
- Contract type
- Po
- PIID GS02P11PHP0025
Description of requirement
TREAT AIR SHAFT WITH METACRYLICS PRODUCTS TO SEAL WALLS AGAINST WATER INFILTRATION. THE WORK SHALL BE ACCOMPLISHED IN ACCORDANCE WITH METACRYLICS ENERGY EFFICIENT COATINGS PROPOSAL DATED NOVE 10, 2010 AND WITH THE FOLLOWING SCOPE OF WORK. SCOPE OF WORK: PROVIDE SUPERVISION, LABOR, ADMINISTRATIVE SUPPORT, SUPPLIES, MATERIALS, EQUIPMENT AND INSURANCE TO APPLY METACRYLICS ACRYLIC BASE AND STITCHBOARD POLYESTER FABRIC TO APPROXIMATELY 900 SQ FT OF WALL AND FLOOR SURFACE OF SHAFT WALLS. ALL WORK MUST BE PERFORMED IN COMPLIANCE WITH OSHA, NFPA, NEC AND EPA REGULATIONS/ CODES. WORK MAY BE PERFORMED DURING REGULAR BUSINESS HOURS AS LONG AS THE WORK DOES NOT DISTURB THE TENANTS. THE CONTRACTOR SHALL SCHEDULE THE WORK WITH GSA AND WITH LBB. PRIOR TO START OF WORK, PLEASE SUBMIT: 1. A LIST OF PERSONNEL WHO WILL BE ON SITE, THE LAST FOUR DIGITS OF THEIR SOCIAL SECURITY NUMBER AND THEIR DATE OF BIRTH; 2. LIST OF VEHICLES WITH LICENSE PLATES NUMBERS; 3. MSDS FOR ALL MATERIALS THAT WILL BE USED ON SITE. THE CONTRACTOR SHALL STRICTLY ADHERE TO ALL PRECAUTIONS NECESSARY TO THE SAFETY, HEALTH AND WELFARE OF THE WORKMEN IN ACCORDANCE WITH THE PROVISIONS OF THE US DEPARTMENT OF LABOR, THE OCCUPATIONAL SAFETY&HEALTH ADMINISTRATION (OSHA) 29 CFR 1926. THE CONTRACTOR SHALL DETERMINE THE NEED FOR AND SHALL ENSURE THE USE OF PERSONAL PROTECTIVE EQUIPMENT. IF NEEDED THE EQUIPMENT WILL MEET, AT A MINIMUM, THE REQUIREMENTS OF OSHA. THE CONTRACTOR SHALL, UPON REQUEST, PROVIDE DOCUMENTATION TO PROVE THAT MECHANICS WORKING ON THE PROJECT ARE LICENSED TO WORK ON YORK SCREW CHILLERS AND TRAINED IN OSHA SAFETY REGULATIONS. THE PROJECT SHALL BE CONSIDERED COMPLETED WHEN: 1. THE INFORMATION ABOVE IS RECEIVED IN WRITTEN FORM AND ACCEPTED BY GSA. 2. THE FRESH AIR SHAFT IS SEALED/ WATER TIGHT AND THE CHIEF OPERATING ENGINEER IS SATISFIED WITH THE WORK AND WITH THE RESULTS. FLOOD TESTING OF AREA MAY BE REQUIRED PRIOR TO FINAL PAYMENT. 3. ALL DEBRIS, MATERIALS, SUPPLIES AND EQUIPMENT HAS BEEN REMOVED FROM THE BUILDING. THE WORK AREAS ARE BROOM SWEPT AND LEFT IN A CLEAN AND ORDERLY CONDITION.
Dates and value
- Award date
- Signed on Jan 7, 2011
- Potential end of performance
- Jun 6, 2011
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jan 7, 2011. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- General Services Administration
- Public Buildings Service
- GSA PBS R2 SERVICE CENTERS DIVISION
- Funded by
- General Services Administration
- Public Buildings Service
- GSA PBS R2 SERVICE CENTERS DIVISION
Place of performance
- Place of performance
- New York, New York 10007-1316
- Congressional district (place of performance)
- NY-10As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- Z111MAINT-REP-ALT/OFFICE BLDGS (service)
Competition
- Extent competed
- Not competed under SAPG
- Reason not competed
- SAP non-competitionSP2
- Solicitation procedures
- Simplified acquisitionSP1
- Set-aside
- No set-aside used
- Contract pricing
- Firm fixed priceJ
- Offers received
- 1
Contract details
- Subcontracting plan
- Plan not requiredB
- Service Contract Act labor standards
- No
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Performance-based service acquisition
- No - service where PBA is not used.N
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Jan 7, 2011Base obligation at award: $24,450
- Latest action
- Jan 7, 2011 — Base awardModification 0; obligation change +$24,450
- Actions by type
- Base award1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Synopsized publicly (SAM.gov / FedBizOpps)
- No
- Simplified procedures for commercial items
- No
Pricing and financing
- Paid by purchase card
- No
- Latest action: change in base and exercised options
- $24,450
- Latest action: change in base and all options
- $24,450
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability incluC
- EPA-designated product
- Not requiredE
- Walsh-Healey Act (materials and supplies)
- No
- Construction wage rates (Davis-Bacon)
- No
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- PoB
- Awarding agency code
- 4700
- Awarding sub-tier code
- 4740
- Contracting office code
- PH000
- Transactions recorded under this award key
- 1
Funding
- Funding agency code
- 4700
- Funding sub-tier code
- 4740
- Funding office code
- PH000