GovChime
AWARDDCAOther than small business

Dca INF301818C138DUININCK INC

Overview

Award facts

Period of performance
Feb 19, 2010 to Jul 1, 2010
Ended
Modifications
2
Latest action Mar 5, 2010
Contract type
Dca
PIID INF301818C138

Description of requirement

AN AUTO TOUR ROUTE IMPROVEMENT GENERALLY CONSISTING OF THE RECLAIMING OF ASPHALT PAVEMENT, BITUMINOUS PAVING, THREE PANEL KIOSK DEMOLITION, GRADING, LANDSCAPE IMPROVEMENTS, PARKING AREA IMPROVEMENTS, TWO PANEL AND THREE PANEL KIOSK CONSTRUCTION, CONCRETE PLAZA AND SIDEWALK CONSTRUCTION, SOLAR POWERED LIGHT, GATE CONSTRUCTION, GATE SAND BLASTING AND PAINTING, PARKING LOT DEMOLITION, CULVERT REPLACEMENT, BITUMINOUS PARKING LOT CONSTRUCTION, WOOD AND RECYCLED PLASTIC OVERLOOK CONSTRUCTION, SIGNAGE AND STRIPING, FENCE DEMOLITION, FISHING PIER AND WOOD/RECYCLED PLASTIC BOARDWALK CONSTRUCTION, PULL OFF AREA DEMOLITION, TREE REMOVAL, BITUMINOUS TRAIL CONSTRUCTION, RESTROOM RENOVATIONS, WALKING TRAIL IMPROVEMENTS, WOOD/RECYCLED PLASTIC RIVER VIEWING OVERLOOK AND BENCHES. THE WORK FOR THE LOW FLOW AREA IMPROVEMENTS GENERALLY CONSISTS OF THE RECLAIMING OF ASPHALT PAVEMENT, BITUMINOUS PAVING, TWO PANEL KIOSK CONSTRUCTION, GRADING, LANDSCAPE IMPROVEMENTS, RAIN GARDEN AND STORM SEWER CONSTRUCTION, PARKING AREA IMPROVEMENTS, CONCRETE PLAZA AND SIDEWALK CONSTRUCTION, PARKING LOT DEMOLITION, CULVERT REPLACEMENT, WOOD/RECYCLED PLASTIC FISHING DOCK AND BENCH, SIGNAGE AND STRIPING AND RESTROOM RENOVATIONS. ALL WORK ITEMS THAT ARE NOT SPECIFICALLY CALLED OUT BELOW FOR PAYMENT ARE CONSIDERED INCIDENTAL AND NO DIRECT COMPENSATION WILL BE PROVIDED. CONTRACTOR SHALL PROVIDE QUALITY CONTROL TESTING FOR THE PROJECT AS SPECIFIED IN OTHER PARTS THESE SPECIFICATIONS. THE PROJECT ALSO INCLUDES SEVEN ADDITIVE ITEMS: REFURBISH EXISTING AUTO TOUR RESTROOM BUILDING, AUTO TOUR OVERLOOK, SOLAR POWERED LIGHT, LOW FLOW AREA IMPROVEMENTS, SOLAR POWER AND ELECTRIC EQUIPMENT FOR ENTRY GATE, FISHING POND DOCK AND ELEVATED BOARDWALK, AND CRUSHED GRANITE FOR A ROCK OUTCROP TRAIL.

Dates and value

Award date
Signed on Sep 23, 2008
Potential end of performance
Jun 30, 2010

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Mar 5, 2010. View on USAspending · Recipient on SAM.gov

Recipient

LocationPRINSBURG, MN
UEIPMQNZKJN2348
Business sizeOther than small businessSize at award, per the contracting officer
Parent companyDUININCK INC

Business types and certifications

For-profit organizationSubchapter S corporation

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. Department of the Interior
  2. U.S. Fish And Wildlife Service
  3. CONSTRUCTION AND ACQUISITON DIVISION

Place of performance

Place of performance
Odessa, Big Stone County, Minnesota 56276-9999
Congressional district (place of performance)
MN-07As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Full and open competitionA
Solicitation procedures
Sealed bidSB
Set-aside
No set-aside used
Contract pricing
Firm fixed priceJ
Offers received
2

Contract details

Subcontracting plan
Plan required - incentive not includedC
Cost Accounting Standards clause
Not applicable exempt from CASX
Service Contract Act labor standards
No
Government-furnished property
Transaction uses GFE/GFPY
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Multi-year contract
No
Performance-based service acquisition
No - service where PBA is not used.N

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Sep 23, 2008Base obligation at award: $1,870,310
Latest action
Mar 5, 2010 — Change orderModification 2; obligation change -$9,566
Latest substantive action
Mar 5, 2010 — Change orderModification 2; obligation change -$9,566
Actions by type
  • Base award1
  • Change order2
3 actions recorded, Sep 23, 2008 to Mar 5, 2010; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No
Latest action: change in base and exercised options
-$9,566
Latest action: change in base and all options
-$9,566

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability incluC
EPA-designated product
Not requiredE
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
Yes

Place and origin

Domestic or foreign entity
U.S. owned businessA

Structure

Award or IDV
Award
Award type
DcaD
Awarding agency code
1400
Awarding sub-tier code
1448
Contracting office code
00003
Transactions recorded under this award key
3

Funding

Funding agency code
999