GovChime
AWARDDCASmall business

Dca INLNDC080043ELKEN CONTRACTING, INC.

Overview

Award facts

Period of performance
Aug 7, 2008 to Sep 13, 2008
Ended
Modifications
1
Latest action Aug 7, 2008
Contract type
Dca
PIID INLNDC080043

Description of requirement

THE CONTRACTOR MUST FIRST REPAIR THE CRACKS AS REVIEWED WITH THE BLM ENGINEER (ESTIMATED AT 38FT3 OF AREA). THE CONTRACTOR MUST SAW CUT THE EXISTING PAVEMENT TO A DEPTH OF 12INCHES; EACH SAW CUT SHALL EXTEND AT LEAST 6 INCHES MIN. LONGITUDINALLY ON BOTH SIDES OF THE SAW CUT. THE CONTRACTOR MUST CLEAN AND PREPARE EACH PATCH AREA BEFORE BACKFILLING. THE CONTRACTOR SHALL BACKFILL THESE AREAS WITH ASPHALT CONCRETE MATERIAL (LEVELING COURSE GRADE). EACH AREA SHOULD BE ROLLED AND COMPACTED. THE EXISTING ASPHALT OF THE ROAD SHOWS SIGNS OF OXIDATION, THEREFORE, THE CONTRACTOR SHOULD EXPECT TO THOROUGHLY CLEAN THE ROAD OF EXISTING OF SAND AND OTHER DEBRIS. WE RECOMMEND AT LEAST TWO PORTABLE AIR COMPRESSORS (GAS POWERED) AND TWO SELF-PROPELLED, ROAD SWEEPERS (8 WIDE) THROUGHOUT THE LENGTH OF THIS CONTRACT. NEXT, WE RECOMMEND THAT THE AGGREGATE BASE SHOULDERS ARE CONSTRUCTED BEFORE THE APPLICATION OF ASPHALT TAKE PLACE. THE IMPERIAL SAND DUNES BUTTERCUP IS A REMOTE AREA, SO THE CONTRACTOR IS EXPECTED TO MAXIMIZE THE USE OF LABOR, TIME AND MATERIAL TO PROVIDE THE NEW ROAD SURFACE WITHIN A WEEK. IN ADDITION, THIS IS A HIGH USE AREA FOR RECREATION; TRAFFIC CONTROL AND SAFETY IS A PRIORITY. THE CONTRACTOR MUST HAVE A FEASIBLE TRAFFIC CONTROL PLAN IN PLACE BEFORE PAVING BEGINS.

Dates and value

Award date
Signed on May 1, 2008
Potential end of performance
Sep 12, 2008

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Aug 7, 2008. View on USAspending · Recipient on SAM.gov

Recipient

LocationEL CAJON, CA
UEIZY7XHSAAC875
Business sizeSmall businessSize at award, per the contracting officer

Business types and certifications

Minority-ownedSmall disadvantaged business (SDB)SBA 8(a) program participantFor-profit organizationSubchapter S corporationCorporation (not tax-exempt)

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. Department of the Interior
  2. Bureau Of Land Management
  3. BC-NBC CONSTRUCTION & A\E ACQUISITION BRANCH

Place of performance

Place of performance
Imperial, California 92251-9999 United States Of America
Congressional district (place of performance)
CA-25As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Not available for competitionB
Reason not competed
Authorized by statuteOTH
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
8(a) sole source8AN
Contract pricing
Firm fixed priceJ
Offers received
1

Solicitation and notices

Solicitation ID
NDR080004(as reported)

Contract details

Subcontracting plan
Plan not requiredB
Cost Accounting Standards clause
No - CAS waiver approvedN
Certified cost or pricing data
No
Contract financing
Percentage of completion progress paymentsC
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Multi-year contract
No
Performance-based service acquisition
No - service where PBA is not used.N

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
May 1, 2008Base obligation at award: $936,943
Latest action
Aug 7, 2008 — Supplemental agreement (within scope)Modification 1; obligation change +$13,711
Latest substantive action
Aug 7, 2008 — Supplemental agreement (within scope)Modification 1; obligation change +$13,711
Actions by type
  • Base award1
  • Supplemental agreement (within scope)1
2 actions recorded, May 1, 2008 to Aug 7, 2008; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No
Latest action: change in base and exercised options
$13,711
Latest action: change in base and all options
$13,711

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability includedC
EPA-designated product
Not requiredE
Construction wage rates (Davis-Bacon)
Yes

Place and origin

Place of manufacture
Not a manufactured end productC
Sea transportation
No

Structure

Award or IDV
Award
Award type
DcaD
IT commercial item category
Non-commercial itemD
Awarding agency code
1400
Awarding sub-tier code
1422
Contracting office code
BC664
Transactions recorded under this award key
2

Funding

Funding agency code
999