GovChime
AWARDPOSmall business

Po INPX001014VERTTERRE CORPORATION

Overview

Award facts

Period of performance
Dec 30, 2012 to Apr 30, 2012
Ended
Modifications
2
Latest action Dec 30, 2011
Contract type
Po
PIID INPX001014

Description of requirement

THIS PROJECT IS TO PROVIDE MECHANICAL AND ELECTRICAL ENGINEERING SERVICES FOR THE DESIGN AND CONSTRUCTION OF THE REHABILITATION OF THE VISITOR CENTER AT WHITE SANDS NATIONAL MONUMENT, FOR THE NATIONAL PARK SERVICE (NPS). SERVICES INCLUDE TITLE I, TITLE II, AND TITLE III, AS DESCRIBED IN THE ATTACHED SCOPE OF WORK. (NOTE THAT ARCHITECTURAL SERVICES ARE NOT REQUIRED.) WHITE SANDS NATIONAL MONUMENT IS LOCATED APPROXIMATELY 15 MILES SOUTHWEST OF ALAMOGORDO, AND 52 MILES EAST OF LAS CRUCES, IN SOUTHERN NEW MEXICO. THERE ARE MINIMAL FACILITIES IN THE PARK. ALL FACILITIES ARE LOCATED IN ALAMOGORDO AND LAS CRUCES. THE NPS GOALS FOR THIS PROJECT ARE TO UPGRADE AND REHABILITATE CERTAIN FEATURES OF THE BUILDING, TO UPGRADE OR REPLACE THE EXISTING MECHANICAL AND ELECTRICAL SYSTEMS, AND TO PROVIDE A COMBINATION SECURITY, FIRE DETECTION AND NOTIFICATION SYSTEM, IN COMPLIANCE WITH NFPA 72. (NOTE THAT THIS WORK DOES NOT INCLUDE PLUMBING SYSTEMS.)ENGINEERING SERVICES WILL INCLUDE REVIEW OF THE NPS PROGRAMMING DOCUMENTS AND EXISTING DRAWINGS OF THE BUILDING, VISITING THE SITE TO VERIFY EXISTING CONDITIONS, INSPECTION AND EVALUATION OF DEFICIENCIES IN THE EXISTING MECHANICAL AND ELECTRICAL SYSTEMS (EXCLUDING THE PLUMBING SYSTEM), MAKING RECOMMENDATIONS FOR REPAIR, MODIFICATION, OR REPLACEMENT OF PORTIONS OR ALL OF THE MECHANICAL AND ELECTRICAL SYSTEM (INCLUDING PROVIDING A COMBINED SECURITY, FIRE DETECTION AND NOTIFICATION SYSTEM); ENGINEERING DESIGN, AND PRODUCTION OF CONSTRUCTION DOCUMENTS (WORKING DRAWINGS AND SPECIFICATIONS) FOR BIDDING AND CONSTRUCTION. CONSTRUCTION COST ESTIMATES WILL ALSO BE REQUIRED.

Dates and value

Award date
Signed on May 4, 2011
Potential end of performance
Apr 29, 2012

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Dec 30, 2011. View on USAspending · Recipient on SAM.gov

Recipient

LocationALBUQUERQUE, NM
UEIJ5K1UMCGB847
Business sizeSmall businessSize at award, per the contracting officer
Parent companyVERTTERRE CORPORATION

Business types and certifications

Minority-ownedSmall disadvantaged business (SDB)Self-certified small disadvantaged businessSBA 8(a) program participantFor-profit organizationLimited liability companyManufacturer of goods

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. Department of the Interior
  2. National Park Service
  3. IMR SANTA FE MABO
Funded by
  1. Department of the Interior
  2. National Park Service
  3. IMR SANTA FE MABO

Place of performance

Place of performance
Albuquerque, Bernalillo County, New Mexico 87102-1945
Congressional district (place of performance)
NM-01As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Not competed under SAPG
Reason not competed
Authorized by statuteOTH
Solicitation procedures
Simplified acquisitionSP1
Set-aside
8(a) sole source8AN
Contract pricing
Firm fixed priceJ
Offers received
1

Contract details

Subcontracting plan
Plan not requiredB
Service Contract Act labor standards
No
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Performance-based service acquisition
No - service where PBA is not used.N

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
May 4, 2011Base obligation at award: $32,303
Latest action
Dec 30, 2011 — Supplemental agreement (within scope)Modification 2; obligation change +$23,970
Latest substantive action
Dec 30, 2011 — Supplemental agreement (within scope)Modification 2; obligation change +$23,970
Actions by type
  • Base award1
  • Supplemental agreement (within scope)2
3 actions recorded, May 4, 2011 to Dec 30, 2011; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Synopsized publicly (SAM.gov / FedBizOpps)
No
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No
Latest action: change in base and exercised options
$23,970
Latest action: change in base and all options
$23,970

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability incluC
EPA-designated product
Not requiredE
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
PoB
Awarding agency code
1400
Awarding sub-tier code
1443
Contracting office code
12100
Transactions recorded under this award key
3

Funding

Funding agency code
1400
Funding sub-tier code
1443
Funding office code
12100