Delivery order NNA14AA04TMENCO PACIFIC, INC.
Overview
Award facts
- Net obligations
- $6.75M
- $6,747,313of $6.75M potential value
- Period of performance
- Nov 21, 2018 to Dec 14, 2018
- Ended
- Modifications
- 16
- Latest action Nov 21, 2018
- Contract type
- Delivery order
- PIID NNA14AA04T
Description of requirement
IGF::OT::IGF RESTORATION OF ELECTRICAL DISTRIBUTION SYSTEM-HIGH VOLTAGE WP1&WP2 THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF UPGRADING AND INCREASING LOAD CAPACITY OF TRANSFORMERS AND RELATED POWER EQUIPMENT FOR SYSTEM A AND B ELECTRICAL BUILDING LOOPS. THE WORK CONSISTS OF BUT IS NOT LIMITED TO THE FOLLOWING, REPLACE THE EXISTING 115KV-6.9KV NOMINAL TO 13.8KV TRANSFORMERS AND ITS ASSOCIATED COMPONENTS; REPLACE THE EXISTING 75KVA SERVICE STATION TRANSFORMER (THREE (3) 25KVA) FOR A NEW 15 KV SYSTEM; UPGRADE THE EXISTING SIX BUILDING SUBSTATIONS BY REPLACING THE EXISTING 6.9KV TRANSFORMERS AND BREAKERS WITH NEW 13.8KV TRANSFORMERS AND 15KV BREAKERS, CABLES RATED AT 8KV WITH NEW CABLES RATED AT 15KV, AND OTHER 6.9KV RATED EQUIPMENT AS REQUIRED; REPLACE POTENTIAL AND CONTROL TRANSFORMERS AT ALL BUILDING SUBSTATIONS IN THE A AND B ELECTRICAL BUILDING LOOP SYSTEM; REPLACE THE EXISTING 6.9KV POWER FACTOR CORRECTION CAPACITOR BANKS WITH 13.8KV RATED CAPACITOR BANKS AT BOTH SUBSTATIONS; REPROGRAM THE AMES POWER MONITORING SYSTEM (APMS) AND ALL P124 ALSTOM AND SCHWEITZER RELAYS IN THE A AND B ELECTRICAL BUILDING LOOP SYSTEM; ALL OTHER RELATED WORK DEEMED NECESSARY TO PROVIDE A COMPLETE NEW 15KV A AND B ELECTRICAL BUILDING LOOP SYSTEM AT AMES RESEARCH CENTER MAIN ELECTRICAL POWER DISTRIBUTION SYSTEM.
Dates and value
- Award date
- Signed on Dec 23, 2013
- Potential end of performance
- Dec 13, 2018
- Current value
- $6,747,313Base and exercised options
- Potential value (if all options are exercised)
- $6,747,313
- Parent contract vehicle
- NNA14AA06B (IDC, multiple award) — 4 orders recorded under it
Obligations by fiscal year of action
- FY2019: $3,332
- FY2018: $120,000
- FY2017: $157,073
- FY2016: $56,440
- FY2015: $5,871
- FY2014: $6,404,598
Total across 6 fiscal years: $6,747,313
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Nov 21, 2018. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- NASA AMES RESEARCH CENTER
- Funded by
- National Aeronautics and Space Administration
- NASA AMES RESEARCH CENTER
- Funded from
- Construction and environmental compliance and restoration (DIRECT)Program activities080-0130Federal accounts (agency financial reports)
Place of performance
- Place of performance
- Moffett Field, Santa Clara County, California 94035-0001
- Congressional district (place of performance)
- CA-18As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS (service)
Competition
- Extent competed
- Full and open competition after exclusion of sourcesD
- Fair opportunity exception
- Competitive set asideCSA
- Solicitation procedures
- Subject to multiple award fair opportunityMAFO
- Set-aside
- Small business set aside - totalSBA
- Contract pricing
- Firm fixed priceJ
- Offers received
- 3
Contract details
- Certified cost or pricing data
- No
- Service Contract Act labor standards
- No
- Commercial procedures
- Commercial item procedures not usedD
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Multi-year contract
- No
- Performance-based service acquisition
- No - service where PBA is not used.N
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Dec 23, 2013Base obligation at award: $6,390,000
- Latest action
- Nov 21, 2018 — Other administrative actionModification 16; administrative: no change in scope or value
- Latest substantive action
- Nov 14, 2018 — Supplemental agreement (within scope)Modification 15; obligation change +$3,332
- Actions by type
- Base award1
- Change order10
- Other administrative action4
- Supplemental agreement (within scope)2
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Local area set-aside
- No
- Synopsized publicly (SAM.gov / FedBizOpps)
- Yes
- Simplified procedures for commercial items
- No
- A-76 (FAIR Act) action
- No
Pricing and financing
- Paid by purchase card
- No
Socio-economic and policy
- Inherently governmental functions
- Other functionsOT
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
- Clinger-Cohen Act planning (IT)
- No
- Walsh-Healey Act (materials and supplies)
- No
- Construction wage rates (Davis-Bacon)
- Yes
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Country of product or service origin
- United statesUSA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- Delivery orderC
- Parent vehicle type
- IDCB
- Parent vehicle: multiple or single award
- Multiple awardM
- Parent vehicle agency
- National Aeronautics and Space Administration8000
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- 80ARC0
- Transactions recorded under this award key
- 17
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- 80ARC0
- Treasury accounts
- 080-2014/2019-0130-000
- Object classes
- 32.0: Land and structures