Dca NNC07CB61CADVANCED VIRTUAL ENGINE TEST CELL, INC.
Overview
Award facts
- Period of performance
- Sep 28, 2010 to Oct 31, 2010
- Ended
- Modifications
- 3
- Latest action Sep 28, 2010
- Contract type
- Dca
- PIID NNC07CB61C
Description of requirement
THE AVETEC RESEARCH TEAM PROPOSES TO DEVELOP A NEW TURBOMACHINERY DESIGN SYSTEM INCORPORATING MULTI-FIDELITY MODELS AND UTILIZING MULTI-DISCIPLINARY ANALYSIS AND OPTIMIZATION (MDAO) TO CREATE BOTH COMPONENT AND ENGINE SYSTEM OR MISSION OPTIMUS. TRADITIONALLY, INDIVIDUAL ENGINE COMPONENTS ARE DESIGNED SEPARATELY AND THEN MADE TO WORK TOGETHER THROUGH A TIME-CONSUMING, ITERATIVE PROCESS. THE PO=ROPOSED DESIGN SYSTEM WILL ALLOW ENGINE COMPONENT DESIGNERS TO OPTIMIZE HIGH-FIDELITY, 3D AERODYNAMIC AND STRUSTURAL COMPONENT DESIGNS BY COUPLING THEM TO LOWER-FIDELITY (0- AND 1D) ENGHINE SYSTEM DESIGN MODELS. THIS APPROACH WILL ALLOW DESIGNERS TO ESTIMATE COMPONENT EFFECTS ON THE ENGINE SYSTEM AND TAILOR THEIR DESIGNS SO THAT THEY BETTER NATCH THE OPERATION OF THE OTHER ENGINE COMPONENTS. THIS LEADS TO BETTER DESIGNS IN LESS TIME. THE PROPOSED SYSTENM WILL UTILIZE CAD SOFTWARE (T-AXI, BLADE GEOMETRY MODELER, CAPRI AND TGS) TO GENERATE CFD MESH FROM COLD-PART GEOMETRY. THREE-DIMENSIONAL CFD TURBOMACHINERY FLOW SOLVERS SUCH AS APNASA, TURBO AND SUMB, WILL BE USED TO SOLVE THE NAVIER-STOKES FLUID FLOW EQUATIONS ON THE MESH. FROM THOSE SOLUTIONS, THE PRESSURE-INDUCED DEFLECTIONS TO THE GEOMETRY ARE USED TO DETERMINE HOT-PART GEOMETRY. A HIGH-FIEDLITY OPTIMIZER IS USED TO IMPROVE COMPONENT DESIGN. FLOW SOLUTIONS ARE ALSO AVERAGED TO PROVIDE INPUT TO ONE-DIMENSIONAL COMPONENT MODELS, CONSTRUCTED IN NPSS, WHICH WILL BE USED WITH AN NPSS ENGINE CYCLE MODEL. THE ENGINE CYCLE IS RUN FOR THE ENGINE MISSION TO PROVIDE COMPONENT SENSITIVITIES AND RELATIVE WEIGHT, WHICH DEFINE THE OBJECTIVE FUNCTION THAT WILL DRIVE A SECOND OVERALL OPTIMIZER. ALTHOUGH SOME OF THE PIECES OF THE SYSTEM ARE READY OR NEARLY READY FOR USE, KEY ADDITIONS WILL BE MADE TO MAKE A SEAMLESS SYSTEM THAT ALSO ADDRESSES MANY ISSUES THAT ARE REQUIRED FOR A DESIGN SYSTEM.
Dates and value
- Award date
- Earliest action recorded: Apr 21, 2008 (the base award is not in the records GovChime holds)
- Potential end of performance
- Oct 30, 2010
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Sep 28, 2010. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- GLENN RESEARCH CENTER
- Funded by
- National Aeronautics and Space Administration
- GLENN RESEARCH CENTER
Place of performance
- Place of performance
- Springfield, Clark County, Ohio 45504-2577
- Congressional district (place of performance)
- OH-10As reported at the time of the action
Classification and competition
Classification
- NAICS
- 541710
- Product or service (PSC)
- AR24R&D-SPACE SCIENCE & APPL-ENG DEV (research and development)
Competition
- Extent competed
- Full and open competitionA
- Solicitation procedures
- Negotiated proposal/quoteNP
- Set-aside
- No set-aside used
- Contract pricing
- Firm fixed priceJ
- Offers received
- 600
Contract details
- Subcontracting plan
- Plan required - incentive not includedC
- Major program
- Advanced design techniques for mdao of turbo machi
- Cost Accounting Standards clause
- Not applicable exempt from CASX
- Certified cost or pricing data
- No
- Service Contract Act labor standards
- No
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Multi-year contract
- Yes
- Performance-based service acquisition
- No - service where PBA is not used.N
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Latest action
- Sep 28, 2010 — Other administrative actionModification 3; administrative: no change in scope or value
- Latest funding action
- May 14, 2009 — Funding onlyModification 2; obligation change +$217,755; funding only: changes obligations, not scope
- Actions by type
- Funding only2
- Other administrative action1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Simplified procedures for commercial items
- No
Pricing and financing
- Paid by purchase card
- No
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability incluC
- EPA-designated product
- Not requiredE
- Walsh-Healey Act (materials and supplies)
- No
- Construction wage rates (Davis-Bacon)
- No
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Sea transportation
- No
Structure
- Award or IDV
- Award
- Award type
- DcaD
- IT commercial item category
- Non-commercial serviceF
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- GRC00
- Transactions recorded under this award key
- 3
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- GRC00