GovChime
AWARDPOSmall business

Po NNC08VD82PDYNASEP, LLC

Overview

Award facts

Period of performance
Jun 4, 2010 to May 23, 2010
Ended
Modifications
6
Latest action Jun 4, 2010
Contract type
Po
PIID NNC08VD82P

Description of requirement

SAP PURCHASE REQUISITION: 4200230834. NNC08VD82P DYNASEP LLC SPECIFICATIONS FOR AN AUTOMATED SYSTEM FOR DRYING AEROGELS USING SUPERCRITICAL CARBON DIOXIDE A DRYING SYSTEM IS REQUIRED FOR THE PROCESSING OF AEROGEL. THE PURPOSE OF THIS SYSTEM IS TO DRY SATURATED AEROGEL (HYDROGEL) SAMPLES OF VARIOUS COMPOSITIONS FROM SOLVENTS USING SUPERCRITICAL CO2. THE SPECIFICATIONS FOR THIS SYSTEM ARE AS FOLLOWS: 1. THE SYSTEM SHALL BE CAPABLE OF PERFORMING THE FOLLOWING GENERAL PROFILE: A. THE EXTRACTION CHAMBER(S) ARE MANUALLY LOADED WITH A NUMBER OF HYDROGEL SAMPLES IMMERSED IN SOLVENT. B. THE SURROUNDING BULK SOLVENT IS DISPLACED BY LIQUID (SUBCRITICAL) CARBON DIOXIDE AT A USER SELECTABLE RATE. C. THE SAMPLES ARE ALLOWED TO SOAK SURROUNDED BY LIQUID CARBON DIOXIDE FOR A USER SELECTABLE AMOUNT OF TIME. D. THE NOW SOLVENT-CONTAMINATED LIQUID CARBON DIOXIDE IS DISPLACED WITH CLEAN LIQUID CARBON DIOXIDE AT A USER SELECTABLE RATE. E. STEPS C AND D ARE REPEATED A USER SELECTABLE NUMBER OF TIMES. F. THE SYSTEM IS HEATED TO BRING THE LIQUID CARBON DIOXIDE (BOTH THE BULK LIQUID AND THE LIQUID IN THE PORES OF THE HYDROGEL) TO A USER SELECTABLE TEMPERATURE ABOVE THE CRITICAL POINT OF CARBON DIOXIDE. G. ONCE THE CARBON DIOXIDE IN THE CHAMBER REACHES THE SELECTED TEMPERATURE AND PRESSURE CONDITIONS, THE CO2 INLET TO THE EXTRACTION CHAMBER IS CLOSED, AND THE CHAMBER TEMPERATURE IS MAINTAINED WHILE THE SUPERCRITICAL CARBON DIOXIDE IS VENTED AT A USER SELECTABLE RATE TO REACH AMBIENT PRESSURE, LEAVING DRY AEROGEL SAMPLES. 2. THE SYSTEM SHALL BE COMPOSED OF MATERIALS WHICH ARE COMPATIBLE WITH SUPERCRITICAL CO2 AND COMMON SOLVENTS SUCH AS ACETONE, ACETONITRILE, ETHANOL, METHANOL, THF, AND NMP. 3. THE SYSTEM SHALL RISE TO A PRESSURE OF AT LEAST 100 BAR (1450 PSIG) IN STEP B, ABOVE, AND MAINTAIN THAT MINIMUM PRESSURE THROUGH STEP F. 4. THE SYSTEM SHALL BE CAPABLE OF MAINTAINING A TEMPERATURE OF AT LEAST 60 C IN THE ABOVE STEP F., AND ALL HEATED PARTS WILL BE RATED FOR CONTINUOUS OPERATION AT THE HIGHEST TEMPERATURE THE SYSTEM IS CAPABLE OF MAINTAINING. 5. THE SYSTEM SHALL INCLUDE FOUR CYLINDRICAL EXTRACTION CHAMBERS, TWO WITH A NOMINAL VOLUME OF 1 LITER EACH AND TWO WITH NOMINAL VOLUMES OF 4 LITERS EACH. 6. THE MINIMUM ACCEPTABLE USABLE INTERNAL DIAMETER FOR A 1 LITER EXTRACTION CHAMBER IS 7.62 CM (3 ) 7. THE MINIMUM ACCEPTABLE USABLE INTERNAL DIAMETER FOR A 4 LITER CHAMBER IS 15.24 CM (6 ) 8. THE SYSTEM SHALL BE CAPABLE OF OPERATING WITH A SINGLE EXTRACTION CHAMBER, ALL FOUR EXTRACTION CHAMBERS, OR ANY COMBINATION, ALL FOLLOWING THE SELECTED TIME / TEMPERATURE / PRESSURE PROFILE. IF IT IS NOT PRACTICAL TO OPERATE ALL OF THE CHAMBERS IN PARALLEL (FILLING OR DRAINING ALL SELECTED CHAMBERS SIMULTANEOUSLY) THEY CAN BE OPERATED SEQUENTIALLY WITHIN A STEP. FOR A MULTI-CHAMBER RUN IT IS NOT PERMISSIBLE TO CARRY EACH CHAMBER THROUGH STEPS A F (SEE PARAGRAPH 1 ABOVE) INDIVIDUALLY AND THEN RESTART THE PROCESS FOR THE NEXT CHAMBER IN SEQUENCE. 9. HEATED VALVES SHALL BE INSTALLED WHEREVER THERE IS SUFFICIENT EXPANSION OF CO2 THROUGH THE VALVE TO CAUSE FREEZING. (FOR EXAMPLE, IF, IN STEP D, ABOVE, THE CO2 IS VENTED TO ATMOSPHERE AT A CONTROLLED RATE THE VALVE THAT THE CO2 IS VENTED THROUGH MUST BE HEATED TO PREVENT BLOCKAGE BY DRY ICE, RESIDUAL SOLVENT, OR THE CONDENSATION AND FREEING OF WATER FROM THE ATMOSPHERE.) 10. THE CHAMBER SHALL BE EQUIPPED WITH HEATERS SUFFICIENT TO ALLOW IT TO ATTAIN AND MAINTAIN ITS MAXIMUM OPERATING TEMPERATURE. 11. THE SYSTEM SHALL COLLECT WASTE SOLVENT AS A LIQUID IN A MANNER THAT ALLOWS IT TO BE SAFELY REMOVED FOR PROPER DISPOSAL. 12. THE VOLUME OF THE WASTE SOLVENT COLLECTION VESSEL(S) SHALL BE SUFFICIENT TO CONTAIN ALL OF THE SOLVENT COLLECTED DURING A DRYING RUN, WITH A MINIMUM VOLUME OF 10 LITERS. 13. CARBON DIOXIDE SHALL BE PROVIDED TO THE SYSTEM USING A PUMP CAPABLE OF DELIVERING AT LEAST 450G OF CO2/MIN AT THE HIGHEST RATED OPERATING PRESSURE OF THE SYSTEM. 14. THE PUMP SHALL BE COOLED USING AN EXTERNAL CHILLER TO BE P

Dates and value

Award date
Signed on May 23, 2008
Potential end of performance
May 22, 2010

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jun 4, 2010. View on USAspending · Recipient on SAM.gov

Recipient

LocationNEWARK, DE
UEIWJRFTSJ6N9Z6
Business sizeSmall businessSize at award, per the contracting officer
Parent companyDYNASEP, LLC

Business types and certifications

For-profit organizationFederally funded research and development centerPartnership or LLP

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. GLENN RESEARCH CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. GLENN RESEARCH CENTER

Place of performance

Place of performance
Newark, New Castle County, Delaware 19713-1147
Congressional district (place of performance)
DE-00As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Not competedC
Reason not competed
Follow-on contractFOC
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
No set-aside used
Contract pricing
Other (none of the above)3
Offers received
1

Contract details

Major program
Automated system for drying aerogels using supercr
Cost Accounting Standards clause
Not applicable exempt from CASX
Service Contract Act labor standards
No
Government-furnished property
Transaction does not use GFE/GFPN
Consolidated requirement
No
Undefinitized action (terms not final)
No
Multi-year contract
No
Performance-based service acquisition
No - service where PBA is not used.N

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
May 23, 2008Base obligation at award: $209,000
Latest action
Jun 4, 2010 — CloseoutModification 6; administrative: no change in scope or value
Actions by type
  • Base award1
  • Other administrative action5
  • Closeout1
7 actions recorded, May 23, 2008 to Jun 4, 2010; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability incluC
EPA-designated product
Not requiredE

Structure

Award or IDV
Award
Award type
PoB
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
GRC00
Transactions recorded under this award key
7

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
GRC00