Po NNC08VD82PDYNASEP, LLC
Overview
Award facts
- Period of performance
- Jun 4, 2010 to May 23, 2010
- Ended
- Modifications
- 6
- Latest action Jun 4, 2010
- Contract type
- Po
- PIID NNC08VD82P
Description of requirement
SAP PURCHASE REQUISITION: 4200230834. NNC08VD82P DYNASEP LLC SPECIFICATIONS FOR AN AUTOMATED SYSTEM FOR DRYING AEROGELS USING SUPERCRITICAL CARBON DIOXIDE A DRYING SYSTEM IS REQUIRED FOR THE PROCESSING OF AEROGEL. THE PURPOSE OF THIS SYSTEM IS TO DRY SATURATED AEROGEL (HYDROGEL) SAMPLES OF VARIOUS COMPOSITIONS FROM SOLVENTS USING SUPERCRITICAL CO2. THE SPECIFICATIONS FOR THIS SYSTEM ARE AS FOLLOWS: 1. THE SYSTEM SHALL BE CAPABLE OF PERFORMING THE FOLLOWING GENERAL PROFILE: A. THE EXTRACTION CHAMBER(S) ARE MANUALLY LOADED WITH A NUMBER OF HYDROGEL SAMPLES IMMERSED IN SOLVENT. B. THE SURROUNDING BULK SOLVENT IS DISPLACED BY LIQUID (SUBCRITICAL) CARBON DIOXIDE AT A USER SELECTABLE RATE. C. THE SAMPLES ARE ALLOWED TO SOAK SURROUNDED BY LIQUID CARBON DIOXIDE FOR A USER SELECTABLE AMOUNT OF TIME. D. THE NOW SOLVENT-CONTAMINATED LIQUID CARBON DIOXIDE IS DISPLACED WITH CLEAN LIQUID CARBON DIOXIDE AT A USER SELECTABLE RATE. E. STEPS C AND D ARE REPEATED A USER SELECTABLE NUMBER OF TIMES. F. THE SYSTEM IS HEATED TO BRING THE LIQUID CARBON DIOXIDE (BOTH THE BULK LIQUID AND THE LIQUID IN THE PORES OF THE HYDROGEL) TO A USER SELECTABLE TEMPERATURE ABOVE THE CRITICAL POINT OF CARBON DIOXIDE. G. ONCE THE CARBON DIOXIDE IN THE CHAMBER REACHES THE SELECTED TEMPERATURE AND PRESSURE CONDITIONS, THE CO2 INLET TO THE EXTRACTION CHAMBER IS CLOSED, AND THE CHAMBER TEMPERATURE IS MAINTAINED WHILE THE SUPERCRITICAL CARBON DIOXIDE IS VENTED AT A USER SELECTABLE RATE TO REACH AMBIENT PRESSURE, LEAVING DRY AEROGEL SAMPLES. 2. THE SYSTEM SHALL BE COMPOSED OF MATERIALS WHICH ARE COMPATIBLE WITH SUPERCRITICAL CO2 AND COMMON SOLVENTS SUCH AS ACETONE, ACETONITRILE, ETHANOL, METHANOL, THF, AND NMP. 3. THE SYSTEM SHALL RISE TO A PRESSURE OF AT LEAST 100 BAR (1450 PSIG) IN STEP B, ABOVE, AND MAINTAIN THAT MINIMUM PRESSURE THROUGH STEP F. 4. THE SYSTEM SHALL BE CAPABLE OF MAINTAINING A TEMPERATURE OF AT LEAST 60 C IN THE ABOVE STEP F., AND ALL HEATED PARTS WILL BE RATED FOR CONTINUOUS OPERATION AT THE HIGHEST TEMPERATURE THE SYSTEM IS CAPABLE OF MAINTAINING. 5. THE SYSTEM SHALL INCLUDE FOUR CYLINDRICAL EXTRACTION CHAMBERS, TWO WITH A NOMINAL VOLUME OF 1 LITER EACH AND TWO WITH NOMINAL VOLUMES OF 4 LITERS EACH. 6. THE MINIMUM ACCEPTABLE USABLE INTERNAL DIAMETER FOR A 1 LITER EXTRACTION CHAMBER IS 7.62 CM (3 ) 7. THE MINIMUM ACCEPTABLE USABLE INTERNAL DIAMETER FOR A 4 LITER CHAMBER IS 15.24 CM (6 ) 8. THE SYSTEM SHALL BE CAPABLE OF OPERATING WITH A SINGLE EXTRACTION CHAMBER, ALL FOUR EXTRACTION CHAMBERS, OR ANY COMBINATION, ALL FOLLOWING THE SELECTED TIME / TEMPERATURE / PRESSURE PROFILE. IF IT IS NOT PRACTICAL TO OPERATE ALL OF THE CHAMBERS IN PARALLEL (FILLING OR DRAINING ALL SELECTED CHAMBERS SIMULTANEOUSLY) THEY CAN BE OPERATED SEQUENTIALLY WITHIN A STEP. FOR A MULTI-CHAMBER RUN IT IS NOT PERMISSIBLE TO CARRY EACH CHAMBER THROUGH STEPS A F (SEE PARAGRAPH 1 ABOVE) INDIVIDUALLY AND THEN RESTART THE PROCESS FOR THE NEXT CHAMBER IN SEQUENCE. 9. HEATED VALVES SHALL BE INSTALLED WHEREVER THERE IS SUFFICIENT EXPANSION OF CO2 THROUGH THE VALVE TO CAUSE FREEZING. (FOR EXAMPLE, IF, IN STEP D, ABOVE, THE CO2 IS VENTED TO ATMOSPHERE AT A CONTROLLED RATE THE VALVE THAT THE CO2 IS VENTED THROUGH MUST BE HEATED TO PREVENT BLOCKAGE BY DRY ICE, RESIDUAL SOLVENT, OR THE CONDENSATION AND FREEING OF WATER FROM THE ATMOSPHERE.) 10. THE CHAMBER SHALL BE EQUIPPED WITH HEATERS SUFFICIENT TO ALLOW IT TO ATTAIN AND MAINTAIN ITS MAXIMUM OPERATING TEMPERATURE. 11. THE SYSTEM SHALL COLLECT WASTE SOLVENT AS A LIQUID IN A MANNER THAT ALLOWS IT TO BE SAFELY REMOVED FOR PROPER DISPOSAL. 12. THE VOLUME OF THE WASTE SOLVENT COLLECTION VESSEL(S) SHALL BE SUFFICIENT TO CONTAIN ALL OF THE SOLVENT COLLECTED DURING A DRYING RUN, WITH A MINIMUM VOLUME OF 10 LITERS. 13. CARBON DIOXIDE SHALL BE PROVIDED TO THE SYSTEM USING A PUMP CAPABLE OF DELIVERING AT LEAST 450G OF CO2/MIN AT THE HIGHEST RATED OPERATING PRESSURE OF THE SYSTEM. 14. THE PUMP SHALL BE COOLED USING AN EXTERNAL CHILLER TO BE P
Dates and value
- Award date
- Signed on May 23, 2008
- Potential end of performance
- May 22, 2010
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jun 4, 2010. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- GLENN RESEARCH CENTER
- Funded by
- National Aeronautics and Space Administration
- GLENN RESEARCH CENTER
Place of performance
- Place of performance
- Newark, New Castle County, Delaware 19713-1147
- Congressional district (place of performance)
- DE-00As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- AJ43ENGINEERING (ADVANCED) (research and development)
Competition
- Extent competed
- Not competedC
- Reason not competed
- Follow-on contractFOC
- Solicitation procedures
- Negotiated proposal/quoteNP
- Set-aside
- No set-aside used
- Contract pricing
- Other (none of the above)3
- Offers received
- 1
Contract details
- Major program
- Automated system for drying aerogels using supercr
- Cost Accounting Standards clause
- Not applicable exempt from CASX
- Service Contract Act labor standards
- No
- Government-furnished property
- Transaction does not use GFE/GFPN
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Multi-year contract
- No
- Performance-based service acquisition
- No - service where PBA is not used.N
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- May 23, 2008Base obligation at award: $209,000
- Latest action
- Jun 4, 2010 — CloseoutModification 6; administrative: no change in scope or value
- Actions by type
- Base award1
- Other administrative action5
- Closeout1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Simplified procedures for commercial items
- No
Pricing and financing
- Paid by purchase card
- No
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability incluC
- EPA-designated product
- Not requiredE
Structure
- Award or IDV
- Award
- Award type
- PoB
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- GRC00
- Transactions recorded under this award key
- 7
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- GRC00