Po NNC08VD85PAXIC INC
Overview
Award facts
- Period of performance
- Jul 13, 2009 to Dec 22, 2008
- Ended
- Modifications
- 4
- Latest action Jul 13, 2009
- Contract type
- Po
- PIID NNC08VD85P
Description of requirement
SAP PURCHASE REQUISITION: 4200266570. RAPID THERMAL PROCESSOR SYSTEM FOR SEMICONDUCTOR WAFERS RT ANNEALING SYSTEM THE FLOOR STANDING SYSTEM SHALL PERFORM RAPID THERMAL ANNEALING OF SILICON AND SILICON CARBIDE WAFERS WITH DIAMETERS UP TO 150 MM. THE SYSTEM SHALL HAVE VACUUM PROCESS CAPABILITY. THE SYSTEM SHALL OPERATE UNDER COMPUTER CONTROL WITH PROGRAMMABLE ANNEAL TEMPERATURES, RAMP RATES AND GAS FLOWS. SYSTEM SHALL BE CAPABLE OF PROCESSING AT PRESSURES FROM ATMOSPHERE TO 1 TORR OR LOWER. HIGH VACUUM VALVES SHALL BE USED AT THE GAS INLET AND CHAMBER EXHAUST. CHAMBER SHALL BE HIGHLY POLISHED STAINLESS STEEL AND FULLY WELDED. HEATING SHALL BE ACCOMPLISHED VIA A HALOGEN LAMP FURNACE UTILIZING A STAINLESS STEEL REFLECTOR, LOCATED ON THE TOP OF THE CHAMBER. TEMPERATURE SHALL BE CONTROLLED VIA CONTROL OF WATTAGE TO THE LAMPS (NOT VOLTAGE) TO PROVIDE BETTER REPRODUCIBILITY AS THE CHARACTERISTICS OF THE LAMPS CHANGE DUE TO AGING. THERE SHALL BE AT LEAST THREE HEATING ZONES. THE SYSTEM SHALL INCLUDE A DIGITAL PID TEMPERATURE CONTROLLER. CLOSED LOOP TEMPERATURE CONTROL SHALL BE BASED UPON A MEASUREMENT BY AN OPTICAL PYROMETER OR THERMOCOUPLE, AS SELECTED BY THE USER. SUBSTRATES SHALL BE MOUNTED INSIDE THE CHAMBER USING QUARTZ PINS WHICH MINIMIZE THERMAL CONDUCTION FROM THE SUBSTRATE. QUARTZ PINS SHALL BE READILY CHANGED OUT TO ACCOMMODATE DIFFERENT SIZE SUBSTRATES. SYSTEM SHALL INCLUDE 2 STANDARD THERMOCOUPLES FOR TEMPERATURE CONTROL AND PYROMETER CALIBRATION. AN ADDITIONAL SHEATHED THERMOCOUPLE SHALL BE PROVIDED FOR USE WITH THE SUSCEPTOR. CHAMBER SHALL HAVE AT LEAST TWO THERMOCOUPLE FEEDTHROUGHS. THE SYSTEM SAFETY FEATURES SHALL INCLUDE INTERLOCKS FOR: OVERHEATING OF INFRARED LAMP REFLECTOR, FLOW OF WATER COOLING, FAILURE OF LAMP FILAMENT, FAILURE OF THERMOCOUPLE, FAILURE OF PYROMETER, FAILURE OF TEMPERATURE CONTROL, EXTERNAL FAILURE. SYSTEM SHALL INCLUDE EMO PUSH BUTTON ON FRONT PANEL AND ALARM INDICATOR. SYSTEM SHALL DISPLAY FAILURE MESSAGE ON COMPUTER IF FAILURE OCCURS. ALARM AND SAFETY SEQUENCE SHALL BE ACTIVATED BY SYSTEM SHOULD A FAILURE OCCUR.
Dates and value
- Award date
- Signed on Sep 23, 2008
- Potential end of performance
- Dec 21, 2008
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jul 13, 2009. View on USAspending · Recipient on SAM.gov
Recipient
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- GLENN RESEARCH CENTER
Place of performance
- Place of performance
- Santa Clara, California 95054-2414
- Congressional district (place of performance)
- CA-17As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- 5821RADIO & TV EQ AIRBORNE (product)
Competition
- Extent competed
- Full and open competition after exclusion of sourcesD
- Solicitation procedures
- Simplified acquisitionSP1
- Set-aside
- Small business set aside - totalSBA
- Contract pricing
- Other (none of the above)3
- Offers received
- 1
Contract details
- Major program
- Rapid thermal processor
- Cost Accounting Standards clause
- Not applicable exempt from CASX
- Government-furnished property
- Transaction does not use GFE/GFPN
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Multi-year contract
- No
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Sep 23, 2008Base obligation at award: $176,333
- Latest action
- Jul 13, 2009 — CloseoutModification 4; administrative: no change in scope or value
- Actions by type
- Base award1
- Other administrative action3
- Closeout1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Simplified procedures for commercial items
- No
Pricing and financing
- Paid by purchase card
- No
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability incluC
- EPA-designated product
- Not requiredE
- Walsh-Healey Act (materials and supplies)
- No
Place and origin
- Place of manufacture
- Mfg in U.S.D
Structure
- Award or IDV
- Award
- Award type
- PoB
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- GRC00
- Transactions recorded under this award key
- 5
Funding
- Funding agency code
- 999