GovChime
AWARDPOSmall business

Po NNC10VA07PTECHLAND RESEARCH INC

Overview

Award facts

Period of performance
Dec 9, 2010 to Dec 31, 2011
Ended
Modifications
1
Latest action Dec 9, 2010
Contract type
Po
PIID NNC10VA07P

Description of requirement

NASA GLENN RESEARCH CENTER HAS AN INTEREST IN THE DEVELOPMENT OF NEW PROPULSION SYSTEM TECHNOLOGIES FOR APPLICATION TO FUTURE SUPERSONIC CRUISE CIVIL AIRCRAFT. IN ORDER TO BE ECONOMICALLY VIABLE, SUCH AIRCRAFT NEED TO ACHIEVE UNPRECEDENTED LEVELS OF CRUISE EFFICIENCY, WHILE ALSO MEETING STRINGENT AIRPORT NOISE REQUIREMENTS AT TAKEOFF AND LANDING AND MINIMIZING THE AIRCRAFT S SONIC BOOM SIGNATURE. THE PROPULSION SYSTEM MUST BE DESIGNED AS AN INTEGRATED SYSTEM AND INSTALLED IN AN OPTIMAL WAY ON THE AIRFRAME. THE SUPERSONIC INLET IS A CRITICAL COMPONENT OF AN EFFICIENT SUPERSONIC CRUISE PROPULSION SYSTEM. THE INLET DESIGNER MUST CONSIDER THE ENTIRE PROPULSION SYSTEM AND AIRCRAFT INTEGRATION STRATEGY TO DEVELOP AN INLET THAT NOT ONLY ACHIEVES HIGH PERFORMANCE AT CRUISE CONDITIONS, BUT ALSO MAINTAINS STABILITY AND OPERABILITY THROUGHOUT THE ENTIRE FLIGHT ENVELOPE, FROM TAKEOFF TO CRUISE TO LANDING. INLET PERFORMANCE METRICS INCLUDE TOTAL PRESSURE RECOVERY AND AMOUNT AND DISTORTION LEVELS OF MASS-FLOW DELIVERED TO THE ENGINE. OPERABILITY CONSIDERATIONS INCLUDE TERMINAL SHOCK STABILITY (FOR MIXED-COMPRESSION INLETS), BUZZ RESISTANCE, AND TOLERANCE TO CHANGES IN ANGLE-OF-ATTACK AND MACH NUMBER. SATISFYING EACH OF THESE REQUIREMENTS NECESSITATES THE INTEGRATION OF VARIABLE GEOMETRY, STABILITY BLEED, OVERBOARD BYPASS, AND INLET CONTROL SYSTEMS. IN ADDITION, THE FINAL CONFIGURATION MUST INTEGRATE WITH THE AIRFRAME IN SUCH A WAY AS TO MINIMIZE THE SONIC BOOM SIGNATURE OF THE OVERALL AIRCRAFT. NEW TECHNOLOGIES ARE EMERGING THAT MAY HAVE SIGNIFICANT IMPACTS ON THE DESIGN OF FUTURE SUPERSONIC INLETS. TECHLAND RESEARCH, INC. HAS BEEN CENTRAL TO THE DEVELOPMENT OF SOME OF THESE. NASA GRC HAS AN INTEREST IN FUNDING TECHLAND TO HELP GUIDE THE DEVELOPMENT OF TWO OF THESE TECHNOLOGIES THROUGH TEST DEMONSTRATION. BACKGROUND TECHLAND RESEARCH, INC. AERODYNAMICALLY DESIGNED, ANALYZED, AND FABRICATED RESEARCH HARDWARE FOR A PATENTED AXISYMMETRIC INLET CONCEPT UNDER PHASE I AND PHASE II SMALL BUSINESS INNOVATIVE RESEARCH (SBIR) CONTRACTS (NAS3-98041, NAS4-00011, AND NAS4-01031). THE FIRST SBIR CONTRACT (WITH NASA GLENN RESEARCH CENTER) WAS A DESIGN AND FEASIBILITY STUDY THAT DEMONSTRATED THE POTENTIAL ADVANTAGES OF A UNIQUE AXISYMMETRIC INLET CONCEPT OVER STATE-OF-THE-ART INLET CONFIGURATIONS TYPICALLY IDENTIFIED FOR SUPERSONIC TRANSPORT AIRCRAFT APPLICATIONS. THE MIXED-COMPRESSION INLET CONCEPT WAS UNIQUE IN ITS UTILIZATION OF AN INNOVATIVE VARIABLE GEOMETRY SYSTEM TO FACILITATE ENGINE AIRFLOW MATCHING AT OFF-DESIGN FLIGHT CONDITIONS. THE TRANSLATING CHANNELED CENTERBODY (TCCB) CONCEPT PROVIDES FOR THE OPENING OF LONGITUDINAL CHANNELS IN THE CENTERBODY WITH CENTERBODY TRANSLATION. THE VARIABLE GEOMETRY IS RELATIVELY SIMPLE TO EFFECT, REQUIRING NO ADDITIONAL ACTUATION SYSTEMS, AND OFFERS EQUIVALENT LEVELS OF INLET STABILITY AND OPERABILITY AS CONCEPTS WITH SIGNIFICANTLY MORE COMPLEX VARIABLE GEOMETRY SCHEMES, SUCH AS THE VARIABLE DIAMETER CENTERBODY (VDC). THE NASA DFRC PHASE I AND PHASE II SBIR EFFORTS FOCUSED ON THE DEVELOPMENT OF AN AERODYNAMIC DESIGN THAT, WHEN OPERATED AT OFF-DESIGN (MACH 1.5) CONDITIONS, WOULD SUPPLY AIRFLOW TO A DFRC-DESIGNED DUCTED ROCKET ENGINE IN SUPPORT OF ROCKET-BASED COMBINED CYCLE (RBCC) RESEARCH. THE INLET AND ENGINE HARDWARE WERE TO BE TESTED ON THE F-15B PROPULSION FLIGHT TEST FACILITY (PFTF). TWO INLET CONFIGURATIONS WERE DESIGNED: ONE WHICH REPRESENTED THE CHANNELED CENTERBODY CONFIGURATION TO PROVIDE INCREASED AIRFLOW AT LOW-SUPERSONIC MACH NUMBER CONDITIONS, AND A SMOOTH CENTERBODY CONFIGURATION WITH AN EQUIVALENT AREA DISTRIBUTION TO THAT OF THE CHANNELED CONFIGURATION. THE EFFORT INCLUDED 3-DIMENSIONAL COMPUTATIONAL FLUID DYNAMICS (CFD) ANALYSES OF BOTH THE SMOOTH AND CHANNELED CENTERBODY CONFIGURATIONS AT FREESTREAM MACH NUMBERS OF 1.5 AND 1.7, AND AT SEVERAL INLET BACKPRESSURES (REPRESENTING SEVERAL ENGINE AIRFLOW CONDITIONS). TECHLAND FABRICATED INLET MODEL HARDWARE PER ME

Dates and value

Award date
Signed on Apr 14, 2010
Potential end of performance
Dec 30, 2011

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Dec 9, 2010. View on USAspending · Recipient on SAM.gov

Recipient

LocationNORTH OLMSTED, OH
UEIFNKMWV5B2C96
Business sizeSmall businessSize at award, per the contracting officer
Parent companyTECHLAND RESEARCH INC

Business types and certifications

Women-ownedFor-profit organizationSubchapter S corporation

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. GLENN RESEARCH CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. GLENN RESEARCH CENTER

Place of performance

Place of performance
North Olmsted, Cuyahoga County, Ohio 44070-4040 United States Of America
Congressional district (place of performance)
OH-07As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Not competed under SAPG
Reason not competed
SAP non-competitionSP2
Solicitation procedures
Simplified acquisitionSP1
Set-aside
No set-aside used
Contract pricing
Firm fixed priceJ
Offers received
1

Contract details

Subcontracting plan
Plan not requiredB
Service Contract Act labor standards
No
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Performance-based service acquisition
No - service where PBA is not used.N

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Apr 14, 2010Base obligation at award: $54,377
Latest action
Dec 9, 2010 — Other administrative actionModification 1; administrative: no change in scope or value
Actions by type
  • Base award1
  • Other administrative action1
2 actions recorded, Apr 14, 2010 to Dec 9, 2010; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Synopsized publicly (SAM.gov / FedBizOpps)
No
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability includedC
EPA-designated product
Not requiredE
Research program (SBIR/STTR)
Small business innovation research program phase iii actionSR3
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
PoB
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
GRC00
Transactions recorded under this award key
2

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
GRC00