Definitive contract NNC14CA09CCATENI INC
Overview
Award facts
- Period of performance
- Jan 31, 2017 to Sep 29, 2014
- Ended
- Modifications
- 2
- Latest action Jan 31, 2017
- Contract type
- Definitive contract
- PIID NNC14CA09C
Description of requirement
IGF::OT::IGF PROVIDE SUPPORT THE JUNE 2014 IROC CONTINUATION REVIEW. THE TASK DESCRIBED HERE IS FOCUSED ON OPTICAL SYSTEMS AND PLATFORM AND INCLUDES SEVERAL SUB-TASKS. THIS ADDITIONAL ANALYSIS AND DESIGN WILL PRODUCE HIGH FIDELITY ESTIMATES OF PERFORMANCE AND REDUCE SYSTEM RISK. THE TASKING DESCRIBED HERE LEVERAGES THE BASELINE OPTICAL DESIGN AND CONTROL ARCHITECTURE DEVELOPED PREVIOUSLY. THE OPTICAL SYSTEMS AND PLATFORM TASK COVERS OPTICAL ANALYSIS, DESIGN AND PLATFORM RELATED ACTIVITIES. SPECIFIC TASKS INCLUDE: 1. OPTICAL DESIGN: PERFORM DETAILED DESIGN OF THE OPTICAL LAYOUT (EXCLUDING TELESCOPE). PERFORM PRELIMINARY DESIGN OF OPTICAL SENSOR UNITS. IDENTIFY/SELECT BASELINE CAMERAS AND OPTICAL SENSORS AND USE ESTIMATED FSM PERFORMANCE. PERFORM MECHANICAL LAYOUT. INCORPORATE DESIGN INTO ADSYS RAYTRACER. SENSITIVITY MATRICES SUFFICIENT TO PERFORM SENSITIVITY ANALYSIS FOR KEY REFLECTION POINTS WILL BE CREATED. 2. OPTICAL BENCH: PERFORM DETAILED DESIGN OF THE OPTICAL BENCH. INCORPORATE GOVT FURNISHED FEM MODEL THAT CAN BE INTEGRATED INTO THE SYSTEM DYNAMIC SIMULATION. 3. OPTICAL SYSTEM DYNAMICS MODELING AND SIMULATION: USING GOVERNMENT FURNISHED BASE SHAKE DISTURBANCE SPECTRUM AND TRANSFER FUNCTIONS FOR ISOLATION PLATFORM GENERATE END-TO-END COMPUTER SIMULATION OF POINTING SYSTEM. IDENTIFY RELEVANT/DOMINANT SHUNT PATHS, OPTICAL BENCH DISTORTIONS. USE GROSS ESTIMATES FOR SHUNT PATH TRANSFER FUNCTIONS. 4. OPTICAL LOS: DEVELOP ALGORITHMS FOR OPTICAL PLATFORM LOS ESTIMATE BASED ON STAR TRACKER, IRU, AND OPTICAL MEASUREMENTS. 5. POINTING BUDGET: USING OPTICAL SYSTEM DYNAMICS SIMULATION, REFINE OPTICAL POINTING BUDGET BASED ON DISTURBANCE SPECTRA, GIMBAL DYNAMICS, ISO PLATFORM DYNAMICS, AND FSM DYNAMICS. 6. FINE POINTING CAMERA FEASIBILITY: ASSESSMENT OF FEASIBILITY AND PERFORMANCE FOR A CO-BORESIGHTED FINE POINTING CAMERA. INCLUDES PRELIMINARY DESIGN CONCEPT, EVALUATION OF SUN EXCLUSION/AVAILABILITY, STAR CATALOGUE, ASSESSMENT OF STAR AVAILABILITY/ID PROBABILITY, AND PRELIMINARY SOFTWARE REQUIREMENTS. 7. SYSTEM ENGINEERING: ADDRESS ISSUES PERTAINING TO OVERALL SYSTEM DESIGN AND DOCUMENTATION/SUPPORTING INFORMATION FOR CONTINUATION REVIEW. 8. PROJECT MANAGEMENT: COVERS PROJECT COORDINATION, GENERATION OF BRIEFING CHARTS AND REPORTS, AS WELL AS COORDINATION OF TIMS AND PRESENTATIONS.
Dates and value
- Award date
- Signed on Apr 2, 2014
- Potential end of performance
- Sep 28, 2014
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jan 31, 2017. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- NASA GLENN RESEARCH CENTER
- Funded by
- National Aeronautics and Space Administration
- NASA GLENN RESEARCH CENTER
Place of performance
- Place of performance
- Redondo Beach, Los Angeles County, California 90278-1402
- Congressional district (place of performance)
- CA-36As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- AJ94R&D- GENERAL SCIENCE/TECHNOLOGY: OTHER (ENGINEERING DEVELOPMENT) (research and development)
Competition
- Extent competed
- Full and open competition after exclusion of sourcesD
- Solicitation procedures
- Negotiated proposal/quoteNP
- Set-aside
- Small business set aside - totalSBA
- Contract pricing
- Firm fixed priceJ
- Offers received
- 1
Contract details
- Subcontracting plan
- Plan not requiredB
- Cost Accounting Standards clause
- Not applicable exempt from CASX
- Certified cost or pricing data
- No
- Commercial procedures
- Commercial item procedures not usedD
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Multi-year contract
- No
- Performance-based service acquisition
- No - service where PBA is not used.N
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Apr 2, 2014Base obligation at award: $275,000
- Latest action
- Jan 31, 2017 — CloseoutModification 2; administrative: no change in scope or value
- Actions by type
- Base award1
- Closeout1
- Other administrative action1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Local area set-aside
- No
- Simplified procedures for commercial items
- No
- A-76 (FAIR Act) action
- No
Pricing and financing
- Paid by purchase card
- No
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
- Clinger-Cohen Act planning (IT)
- No
- Research program (SBIR/STTR)
- Small business innovation research program phase iii actionSR3
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Country of product or service origin
- United statesUSA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- Definitive contractD
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- 80GRC0
- Transactions recorded under this award key
- 3
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- 80GRC0