Definitive contract NNC16CA22CTHE BOEING COMPANY

Overview

Award facts

Net obligations
$321.91K
$321,910of $3.25M potential value
Period of performance
Dec 4, 2017 to Dec 4, 2017
Ended
Modifications
6
Latest action Dec 4, 2017
Contract type
Definitive contract
PIID NNC16CA22C

Description of requirement

IGF::OT::IGF STATEMENT OF WORK NASA IS CONSIDERING THE DEVELOPMENT OF SOLAR CELLS SOLAR ARRAY DESIGN CONCEPTS BETTER SUITED FOR MISSIONS THAT REQUIRE EXPOSURE TO MORE INTENSE RADIATION ENVIRONMENTS AND MISSIONS EVER FARTHER FROM THE SUN. IN SUPPORT OF THAT GOAL, NASA IS EXAMINING PROMISING TECHNOLOGIES WITH THE POTENTIAL TO INCREASE SOLAR CELL CONVERSION EFFICIENCIES UNDER LOW INTENSITY LOW TEMPERATURE LILT AND HIGH RADIATION ENVIRONMENTS. THE CONTRACTOR SHALL PERFORM THE FOLLOWING WORK SCOPE TO COMPLETE THE ADVANCED SOLAR CELL MODULE EFFORT AND ADVANCE THE TRL TO 4 AT THE END OF THE BASE PROJECT, TO TRL 5 AT THE END OF THE FIRST OPTION, AND EVEN FURTHER BY THE END OF THE SECOND OPTION. 1.0 BASE PROJECT 1.1. PROGRAM MANAGEMENT 1.1.1. MANAGE THE EXTREME ENVIRONMENTS SOLAR ARRAY PROGRAM BY ENSURING THAT ALL TASKS ARE SUPPORTED AND EXECUTED IN A TIMELY MANNER, SUPPORTING STATUS MEETINGS AS NECESSARY WITH THE CUSTOMER, PREPARING FOR CUSTOMER REVIEWS, AND DOCUMENTING THE PROGRAM PROGRESS. TASKS INCLUDE PROGRAM, BUSINESS, AND ADMINISTRATIVE PLANNING, ORGANIZING, DIRECTING, COORDINATING, CONTROLLING, AND APPROVAL ACTIONS. 1.2. SYSTEM ENGINEERING 1.2. SUPPORT IN PERSON A PROGRAM KICKOFF TECHNICAL EXCHANGE MEETING TIM AT NASA GLENN RESEARCH CENTER. 1.2.2. PROVIDE PERIODIC EVERY 3 MONTHS STATUS REPORTS ON THE PROGRESS OF THE PROGRAM 1.2.3. SUPPORT A VIRTUAL TECHNICAL EXCHANGE MEETING TIM WITH THE CUSTOMER ON THE OVERALL PROGRAM STATUS APPROXIMATELY 4 MONTHS AFTER PROGRAM KICKOFF. 1.2.4. WORK WITH ALL THE STAKEHOLDERS TO DEFINE THE TOP LEVEL SYSTEM REQUIREMENTS FOR A DEEP SPACE SOLAR MISSION. THESE REQUIREMENTS THEN NEED TO BE FLOWED DOWN TO THE MCM DESIGN TEAM SO THEY CAN DESIGN THE MCM. 1.2.5. AFTER THE BREADBOARD MCM TESTING IS COMPLETE, EVALUATE THE TRL LEVEL AND ASSESS THE ABILITY TO GET TO TRL 5 IN OPTION I. 1.2.6. AFTER THE BREADBOARD MCM TESTING IS COMPLETE, ASSESS THE TECHNOLOGY PERFORMANCE AGAINST KEY FIGURES OF MERIT FROM THE PROGRAM. 1.2.7. COMPILE AND DELIVER AN OVERALL FINAL ORAL PRESENTATION ON THE BASE PROJECT OF THE PROGRAM TO THE CUSTOMER AT BOEINGS FACILITY IN EL SEGUNDO, CA. 1.2.8. PREPARE AND DELIVER A FINAL SUMMARY REPORT ON THE BASE PROJECT OF THE PROGRAM TO THE CUSTOMER. 1.3. DESIGN AND ANALYSIS 1.3.1. DESIGN PRODUCTION PACKAGING FOR PRODUCTION MCM. THIS INCLUDES DESIGNING THE DEPLOYABLE TETHER AND SPRING MECHANISM TO INCREASE THE STOWED PACKING EFFICIENCY. 1.3.2. DEVELOP PRODUCTION CIRCUIT LAYOUT FOR PRODUCTION MCM. 1.3.3. PERFORM A THERMAL ANALYSIS OF THE PRODUCTION MCM. 1.3.4. PROVIDE A DETAILED TECHNICAL DESCRIPTION OF THE SOLAR CELL MATERIALS, FAB TECHNIQUES, AND COMPONENTS OF THE PRODUCTION MCM TO THE CUSTOMER. 1.3.5. PRELIMINARY RADIATION MODELING AND ANALYSIS. 1.4. FABRICATION 1.4.1. SPECTROLAB WILL FABRICATE ONE 1 BREADBOARD MCM USING PARTS LEFT OVER FROM THE HOMESTEADER PROGRAM AND PERFORM ACCEPTANCE TESTING ON IT. 1.5. TEST 1.5.1. PERFORM A MEMS SCREENING TEST ON THE BREADBOARD MCM. 1.5.2. PERFORM A CHARACTERIZATION TEST OF THE BREADBOARD MCM BEFORE AND AFTER EACH TEST. 1.5.3. PERFORM X 25 BARE CELL ELECTRICAL TEST ON THE CPV OPTIMIZED BARE SOLAR CELL. 1.5.4. PERFORM A THERMAL CYCLE TEST ON THE BREADBOARD MCM. 1.5.5. PERFORM A THERMAL VACUUM TEST ON THE BREADBOARD MCM. 1.5.6. PERFORM AN INTERCONNECT WIRE BOND PULL TEST ON SOLAR CELL AND MIRROR ASSEMBLY. 1.6. DSS SUBCONTRACT 1.6.1. WORK WITH BOEING TO DEVELOP INTERFACE REQUIREMENTS ON THE MCM TO ENSURE IT WILL BE COMPATIBLE WITH THE ROSA DEPLOYMENT SYSTEM. 1.6.2. DEVELOP A PRELIMINARY DESIGN OF A BASE SOLAR WING, INCLUDING A MASS SUMMARY AND STOWED VOLUME CALCULATION. 1.7. ORBITAL ATK SUBCONTRACT 1.7.1. WORK WITH BOEING TO DEVELOP INTERFACE REQUIREMENTS ON THE MCM TO ENSURE IT WILL BE COMPATIBLE WITH THE MEGA FLEX DEPLOYMENT SYSTEM. 1.7.2. DEVELOP A PRELIMINARY DESIGN OF A BASE SOLAR WING, INCLUDING A MASS SUMMARY AND STOWED VOLUME CALCULATION. 1.8. JPL SUBCONTRACT 1.8.1. WORK WITH BOEING TO DEVEL

Dates and value

Award date
Signed on Jul 19, 2016
Potential end of performance
Dec 3, 2017
Current value
$325,937Base and exercised options
Potential value (if all options are exercised)
$3,246,314

Obligations by fiscal year of action

  • FY2018: -$4,027 (de-obligation)
  • FY2016: $325,937

Total across 2 fiscal years: $321,910

Net de-obligation in that fiscal year (obligations withdrawn).

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Dec 4, 2017. View on USAspending · Recipient on SAM.gov

Recipient

LocationHUNTINGTON BEACH, CA
UEIM8JLMEHJADQ5
Business sizeOther than small businessSize at award, per the contracting officer
Parent companyTHE BOEING COMPANY

Business types and certifications

For-profit organizationCorporation (not tax-exempt)Manufacturer of goods

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. NASA GLENN RESEARCH CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. NASA GLENN RESEARCH CENTER
Funded from
Science (DIRECT)Program activities080-0120Federal accounts (agency financial reports)

Place of performance

Place of performance
Huntington Beach, Orange County, California 92647-2048
Congressional district (place of performance)
CA-47As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Full and open competitionA
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
No set-aside used
Contract pricing
Cost plus fixed feeU
Offers received
11

Solicitation and notices

Solicitation ID
NNH15ZOA001N-15GCD_C3
Notices

Contract details

Subcontracting plan
Individual subcontract planF
Cost Accounting Standards clause
Yes - CAS clause includedY
Certified cost or pricing data
No
Service Contract Act labor standards
No
Commercial procedures
Commercial item procedures not usedD
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Multi-year contract
Yes
Performance-based service acquisition
Yes - service where PBA is used.Y

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Jul 19, 2016Base obligation at award: $200,000
Latest action
Dec 4, 2017 — Other administrative actionModification 6; administrative: no change in scope or value
Latest substantive action
Sep 21, 2016 — Supplemental agreement (within scope)Modification 3
Latest funding action
Aug 11, 2016 — Funding onlyModification 1; obligation change +$125,937; funding only: changes obligations, not scope
Actions by type
  • Base award1
  • Other administrative action3
  • Supplemental agreement (within scope)1
  • Funding only1
  • Closeout1
7 actions recorded, Jul 19, 2016 to Dec 4, 2017; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Local area set-aside
No
Synopsized publicly (SAM.gov / FedBizOpps)
Yes
Simplified procedures for commercial items
No
A-76 (FAIR Act) action
No

Pricing and financing

Paid by purchase card
No

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability includedC
EPA-designated product
Not requiredE
Clinger-Cohen Act planning (IT)
No
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Country of product or service origin
United statesUSA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
Definitive contractD
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
80GRC0
Transactions recorded under this award key
7

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
80GRC0
Treasury accounts
  • 080-2016/2017-0120-000
Object classes
  • 25.5: Research and development contracts