GovChime
AWARDDOOther than small business

Do NND12CS03TCSIRO MATERIALS SCIENCE AND ENGINEERING

Overview

Award facts

Period of performance
Sep 25, 2012 to Mar 31, 2013
Ended
Modifications
0
Latest action Sep 25, 2012
Contract type
Do
PIID NND12CS03T

Description of requirement

TASK ORDER NO. NND12CS03T FINAL DESIGN AND FABRICATION OF HEAT SHIELD PROTOTYPE PROJECT TITLE: MONITORING OF THERMAL PROTECTION SYSTEMS (TPS) USING ROBUST SELF-ORGANIZING OPTICAL FIBER SENSING NETWORKS THE BENEFITS OF A SYSTEM SUCH AS THIS OVER A CONVENTIONAL CENTRALLY-CONTROLLED NETWORK INCLUDE ROBUSTNESS (THERE IS NO SINGLE POINT OF FAILURE, AND THE NETWORK CAN CONTINUE TO FUNCTION IN THE PRESENCE OF DAMAGE IN SOME AREAS), SCALABILITY (THE NUMBER OF AGENTS AND SENSORS CAN BE GREATLY INCREASED WITHOUT DEGRADING SYSTEM PERFORMANCE), AND ABILITY TO RESPOND EFFECTIVELY TO DYNAMIC ENVIRONMENTS. THE OBJECTIVE OF THE WORK IS TO BUILD THE PROTOTYPE HEAT SHIELD WHOSE BASIC DESIGN WAS COMPLETED UNDER TASK ORDER, NND11CS02T. THIS TPS DEMONSTRATOR WILL USE RESULTS FROM STUDIES OF THE ACOUSTIC AND THERMAL PROPERTIES OF CERAMIC INSULATION MATERIALS AND DYNAMICALLY RECONFIGURABLE (SWITCHED) OPTICAL FIBER BRAGG GRATING (FBG) SENSING NETWORKS. THIS WORK WILL BE CARRIED OUT JOINTLY BY THE DRYDEN FLIGHT RESEARCH CENTER, THE LANGLEY RESEARCH CENTER, AND THE COMMONWEALTH SCIENTIFIC AND INDUSTRIAL RESEARCH ORGANISATION (CSIRO), SYDNEY, AUSTRALIA. CSIRO IS AUSTRALIA'S NATIONAL SCIENCE AGENCY AND ONE OF THE LARGEST AND MOST DIVERSE RESEARCH AGENCIES IN THE WORLD. THE WORK DEFINED IS CRITICALLY BASED ON PREVIOUS SPECIFIC ADVANCES IN THE STATE-OF-THE-ART MADE BY CSIRO IN THE DEVELOPMENT OF PROPRIETARY ARCHITECTURE. NASA HAS BEEN ENGAGED IN THIS RESEARCH WITH CSIRO STARTING IN 2001. THE RESEARCH WORK WILL LEVERAGE OFF DEVELOPMENTS FROM EARLIER NASA/CSIRO WORK ON STRUCTURAL HEALTH MONITORING, IN PARTICULAR ON THE DEVELOPMENT OF A DISTRIBUTED MULTI-AGENT SYSTEM DEMONSTRATOR FOR IMPACT DETECTION AND DAMAGE CHARACTERIZATION, WHICH WAS CO-FUNDED BY CSIRO. THE PROJECT IS AS FOLLOWS: 1: DESIGN OF PROTOTYPE HEAT SHIELD STRUCTURE A) COMPLETE OUTSTANDING DESIGN DETAILS INCLUDING DEVELOPMENT OF CRITERIA FOR OPTIMAL SENSOR PLACEMENT, AND ACCURACY REQUIREMENTS. B) USE STRUCTURAL MODEL TO DERIVE OPTIMAL SENSOR LAYOUT. 2: FABRICATION OF PROTOTYPE HEAT SHIELD STRUCTURE A) SOURCING AND ACQUISITION OF MATERIALS, SENSORS AND ELECTRONIC COMPONENTS. B) FABRICATION OF PROTOTYPE HEAT SHIELD HARDWARE (IN COOPERATION WITH NASA DFRC). C) CONSTRUCT AND TEST ELECTRONIC SYSTEMS. D) DEVELOP AND TEST DATA ACQUISITION, PROCESSING, COMMUNICATIONS AND CONTROL SOFTWARE. E) DESIGN TEST FACILITIES FOR CONTROLLED IMPACT AND THERMAL CONTROL OF STRUCTURE SURFACE.

Dates and value

Award date
Signed on Sep 25, 2012
Potential end of performance
Mar 30, 2013
Parent contract vehicle
NND10AF91B — 5 orders recorded under it

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Sep 25, 2012. View on USAspending · Recipient on SAM.gov

Recipient

LocationWEST LINDFIELD, AUSTRALIA
UEIY6RYMMB5T419
Business sizeOther than small businessSize at award, per the contracting officer

Business types and certifications

Federally funded research and development centerForeign government

Self-reported at the time of the action.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. ARMSTRONG FLIGHT RESEARCH CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. ARMSTRONG FLIGHT RESEARCH CENTER

Place of performance

Place of performance
Australia

Classification and competition

Classification

Product or service (PSC)
AR15R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (OPERATIONAL SYSTEMS DEVELOPMENT) (research and development)

Competition

Extent competed
Not competedC
Reason not competed
Unique sourceUNQ
Solicitation procedures
Only one sourceSSS
Set-aside
No set-aside used
Contract pricing
Firm fixed priceJ
Offers received
1

Contract details

Certified cost or pricing data
No
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Multi-year contract
Yes
Performance-based service acquisition
No - service where PBA is not used.N

Transaction history

Modification history

Base award
Sep 25, 2012Base obligation at award: $100,000
Latest action
Sep 25, 2012 — Base awardModification 0; obligation change +$100,000
Actions by type
  • Base award1
1 actions recorded, Sep 25, 2012 to Sep 25, 2012; each action counted once.

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Synopsized publicly (SAM.gov / FedBizOpps)
Yes
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No
Latest action: change in base and exercised options
$100,000
Latest action: change in base and all options
$100,000

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability incluC
EPA-designated product
Not requiredE

Place and origin

Domestic or foreign entity
Other foreign entity (e.g. foreign government)O
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
DoC
Parent vehicle agency
National Aeronautics and Space Administration8000
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
DFRC0
Transactions recorded under this award key
1

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
DFRC0