GovChime
AWARDDCASmall business

Dca NNG07CA09CMICROSAT SYSTEMS, INC.

Overview

Award facts

Period of performance
Jun 24, 2011 to Dec 31, 2011
Ended
Modifications
7
Latest action Jun 24, 2011
Contract type
Dca
PIID NNG07CA09C

Description of requirement

SBIR PHASE 2 AWARD FOR EFFORT ENTITLED: MODULAR, PLUG AND PLAY, DISTRIBUTIVE AVIONICS. THE OBJECTIVE OF THIS SBIR PHASE II EFFORT IS TO PROVE THE VIABILITY OF AN ETHERNET VERSION OF THE MICROSAT SYSTEMS, INC. (MSI) MODULAR, PLUG AND PLAY (PNP) SPACECRAFT AVIONICS ARCHITECTURE. THIS REVOLUTIONARY ARCHITECTURE PROVIDES A NEAR-TERM SOLUTION TO MODULAR PLUG AND PLAY AVIONICS WHILE DISTRIBUTING POWER AND DATA MANAGEMENT FUNCTIONS ON A SINGLE CIRCUIT ALLOWING RAPID INTERFACING TO OTHER SATELLITE AVIONICS SUCH AS THE GSFC SPACE CUBE. BY INTEGRATING THE MSI PROTOCOL CONVERTER TECHNOLOGY WITH THE ABET TECHNOLOGIES DIGITAL CURRENT SYSTEM, MSI CAN PROVIDE A NETWORK WITH STANDARDIZED ATTACHMENT NODES THAT CARRIES DATA AND POWER ON AN INTELLIGENT POWER/DATA RING (IPDR). THE IPDR NETWORK, WHICH CAN HOST A VARIETY OF DATA PROTOCALS, CURRENTLY IMPLEMENTS A HIGH SPEED SPA-S (SPACEWIRE) CORE TO SUPPORT THE AFRL PNP EFFORTS. IT ENABLES FULL PNP MODULARITY REDUCING SPACECRAFT INTEGRATION AND TEST TO A FEW DAYS. SINCE THE SYSTEM IS IMPLEMENTED WITH A COMMON SET OF NODES FOR EVERY INTERFACE INSTEAD OF CUSTOM CARDS IN A CARD CAGE, THE HARDWARE COSTS ARE DRAMATICALLY LOWER AS WELL, ONLY 40-60% OF COMPARABLE CENTRALIZED SYSTEMS. USING COMMERCIAL ETHERNET PARTS INTEGRATED INTO THE EXISTING IPDR NODE PROCESSOR AND INTERFACE BOARDS SUCCESSFUL PROOF OF CONCEPT TESTING WAS PERFORMED DURING PHASE I. THE TRANSFER OF ETHERNET DATA FRAMES WAS DEMONSTRATED INTO THE IPDR RING VIA A PERIPHERAL ETHERNET DEVICE, FROM ONE IPDR NODE TO ANOTHER, AND FINALLY BACK OUT OF THE RING TO THE EXTERNAL ETHERNET DEVICE. ALTHOUGH THIS TESTING VERIFIED THE FUNDAMENTAL FUNCTIONALITY OF ETHERNET COMMUNICATION ON THE IPDR RING AVIONICS, THERE IS SIGNIFICANT EFFORT REMAINING TO MATURE THIS INTO A FLIGHT WORTHY AVIONICS ARCHITECTURE. THE PHASE II WILL INVESTIGATE FLIGHT PARTS SELECTION FOR THE NODES, FIRMWARE DEVELOPMENT REQUIRED TO IMPROVE BANDWIDTH, AND FLIGHT QUALIFICATION AND DELIVERY OF AN ETHERNET VERSION OF AN IPDR NODE.

Dates and value

Award date
Earliest action recorded: May 7, 2008 (the base award is not in the records GovChime holds)
Potential end of performance
Dec 30, 2011

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jun 24, 2011. View on USAspending · Recipient on SAM.gov

Recipient

LocationLITTLETON, CO
UEIXHCCP3W6PLX6
Business sizeSmall businessSize at award, per the contracting officer

Business types and certifications

Minority-owned

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. GODDARD SPACE FLIGHT CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. GODDARD SPACE FLIGHT CENTER

Place of performance

Place of performance
Littleton, Jefferson County, Colorado 80127-4107
Congressional district (place of performance)
CO-06As reported at the time of the action

Classification and competition

Classification

NAICS
541710

Competition

Extent competed
Full and open competition after exclusion of sourcesD
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
Small business set aside - totalSBA
Contract pricing
Firm fixed priceJ
Offers received
99

Contract details

Subcontracting plan
Plan not requiredB
Cost Accounting Standards clause
Not applicable exempt from CASX
Service Contract Act labor standards
No
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Multi-year contract
No
Performance-based service acquisition
No - service where PBA is not used.N

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Latest action
Jun 24, 2011 — Supplemental agreement (within scope)Modification 8
Latest substantive action
Jun 24, 2011 — Supplemental agreement (within scope)Modification 8
Latest funding action
May 7, 2008 — Funding onlyModification 2; funding only: changes obligations, not scope
Actions by type
  • Supplemental agreement (within scope)6
  • Funding only1
7 actions recorded, May 7, 2008 to Jun 24, 2011; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability incluC
EPA-designated product
Not requiredE
Research program (SBIR/STTR)
Small business innovation research program phase ii actionSR2

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
DcaD
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
GSFC0
Transactions recorded under this award key
7

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
GSFC0