Dca NNG07CA09CMICROSAT SYSTEMS, INC.
Overview
Award facts
- Period of performance
- Jun 24, 2011 to Dec 31, 2011
- Ended
- Modifications
- 7
- Latest action Jun 24, 2011
- Contract type
- Dca
- PIID NNG07CA09C
Description of requirement
SBIR PHASE 2 AWARD FOR EFFORT ENTITLED: MODULAR, PLUG AND PLAY, DISTRIBUTIVE AVIONICS. THE OBJECTIVE OF THIS SBIR PHASE II EFFORT IS TO PROVE THE VIABILITY OF AN ETHERNET VERSION OF THE MICROSAT SYSTEMS, INC. (MSI) MODULAR, PLUG AND PLAY (PNP) SPACECRAFT AVIONICS ARCHITECTURE. THIS REVOLUTIONARY ARCHITECTURE PROVIDES A NEAR-TERM SOLUTION TO MODULAR PLUG AND PLAY AVIONICS WHILE DISTRIBUTING POWER AND DATA MANAGEMENT FUNCTIONS ON A SINGLE CIRCUIT ALLOWING RAPID INTERFACING TO OTHER SATELLITE AVIONICS SUCH AS THE GSFC SPACE CUBE. BY INTEGRATING THE MSI PROTOCOL CONVERTER TECHNOLOGY WITH THE ABET TECHNOLOGIES DIGITAL CURRENT SYSTEM, MSI CAN PROVIDE A NETWORK WITH STANDARDIZED ATTACHMENT NODES THAT CARRIES DATA AND POWER ON AN INTELLIGENT POWER/DATA RING (IPDR). THE IPDR NETWORK, WHICH CAN HOST A VARIETY OF DATA PROTOCALS, CURRENTLY IMPLEMENTS A HIGH SPEED SPA-S (SPACEWIRE) CORE TO SUPPORT THE AFRL PNP EFFORTS. IT ENABLES FULL PNP MODULARITY REDUCING SPACECRAFT INTEGRATION AND TEST TO A FEW DAYS. SINCE THE SYSTEM IS IMPLEMENTED WITH A COMMON SET OF NODES FOR EVERY INTERFACE INSTEAD OF CUSTOM CARDS IN A CARD CAGE, THE HARDWARE COSTS ARE DRAMATICALLY LOWER AS WELL, ONLY 40-60% OF COMPARABLE CENTRALIZED SYSTEMS. USING COMMERCIAL ETHERNET PARTS INTEGRATED INTO THE EXISTING IPDR NODE PROCESSOR AND INTERFACE BOARDS SUCCESSFUL PROOF OF CONCEPT TESTING WAS PERFORMED DURING PHASE I. THE TRANSFER OF ETHERNET DATA FRAMES WAS DEMONSTRATED INTO THE IPDR RING VIA A PERIPHERAL ETHERNET DEVICE, FROM ONE IPDR NODE TO ANOTHER, AND FINALLY BACK OUT OF THE RING TO THE EXTERNAL ETHERNET DEVICE. ALTHOUGH THIS TESTING VERIFIED THE FUNDAMENTAL FUNCTIONALITY OF ETHERNET COMMUNICATION ON THE IPDR RING AVIONICS, THERE IS SIGNIFICANT EFFORT REMAINING TO MATURE THIS INTO A FLIGHT WORTHY AVIONICS ARCHITECTURE. THE PHASE II WILL INVESTIGATE FLIGHT PARTS SELECTION FOR THE NODES, FIRMWARE DEVELOPMENT REQUIRED TO IMPROVE BANDWIDTH, AND FLIGHT QUALIFICATION AND DELIVERY OF AN ETHERNET VERSION OF AN IPDR NODE.
Dates and value
- Award date
- Earliest action recorded: May 7, 2008 (the base award is not in the records GovChime holds)
- Potential end of performance
- Dec 30, 2011
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jun 24, 2011. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- GODDARD SPACE FLIGHT CENTER
- Funded by
- National Aeronautics and Space Administration
- GODDARD SPACE FLIGHT CENTER
Place of performance
- Place of performance
- Littleton, Jefferson County, Colorado 80127-4107
- Congressional district (place of performance)
- CO-06As reported at the time of the action
Classification and competition
Classification
- NAICS
- 541710
- Product or service (PSC)
- AR11R&D-AERO & SPACE TECH-B RES (research and development)
Competition
- Extent competed
- Full and open competition after exclusion of sourcesD
- Solicitation procedures
- Negotiated proposal/quoteNP
- Set-aside
- Small business set aside - totalSBA
- Contract pricing
- Firm fixed priceJ
- Offers received
- 99
Contract details
- Subcontracting plan
- Plan not requiredB
- Cost Accounting Standards clause
- Not applicable exempt from CASX
- Service Contract Act labor standards
- No
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Multi-year contract
- No
- Performance-based service acquisition
- No - service where PBA is not used.N
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Latest action
- Jun 24, 2011 — Supplemental agreement (within scope)Modification 8
- Latest substantive action
- Jun 24, 2011 — Supplemental agreement (within scope)Modification 8
- Latest funding action
- May 7, 2008 — Funding onlyModification 2; funding only: changes obligations, not scope
- Actions by type
- Supplemental agreement (within scope)6
- Funding only1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Simplified procedures for commercial items
- No
Pricing and financing
- Paid by purchase card
- No
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability incluC
- EPA-designated product
- Not requiredE
- Research program (SBIR/STTR)
- Small business innovation research program phase ii actionSR2
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- DcaD
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- GSFC0
- Transactions recorded under this award key
- 7
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- GSFC0