GovChime
AWARDDCASmall business

Dca NNG07EJ03CBLACK, KEVIN

Overview

Award facts

Period of performance
Sep 15, 2008 to Jan 31, 2010
Ended
Modifications
2
Latest action Sep 15, 2008
Contract type
Dca
PIID NNG07EJ03C

Description of requirement

THIS STATEMENT OF WORK (SOW) RESULTS FROM THE SELECTION OF THE GSFC PROPOSAL, 06-APRA06-0084, IN RESPONSE TO NASA REARCH ANNOUNCEMENT (NRA) FOR THE RESEARCH OPPORTUNITIES IN SPACE AND EARTH SCIENCTS-06 (SOLICITATION NNH06ZDA001N), FOR WHICH THE CONTRACTOR WAS A KEY CO-INVESTIGATOR. IN OUR PROPOSAL, THE CONTRACTOR PROPOSED TO DEVELOP SENSITIVE PHOTOELECTRIC X-RAY POLARIMETERS, BASED ON A TIME PROJECTION CHAMBER TECHNIQUE, AND TO BRING THESE DETECTORS TOA TECHNOLOGY READINESS LEVEL (TRL) SUITABLE FOR SELECTIONS THE BASIS OF AN EXPLORER MISSION PROPOSAL. THE SPECIFIC TASKS TO BE ACCOMPLISHED BY THE CONTRACTOR ARE AS FOLLOWS (EXTRACTED FROM WINNING PROPOSALS) REDUCING GEM AND ANODE PITCH: THE CONTRACTOR SHALL DESIGN AND OVERSEE THE PRODUCTION OF SMALLER PITCH ANODES AND CONTRIBUTE TO THE DESIGN AND TESTING OF FINER PITCH GEMS. THE CONTRACTOR SHALL ASSIST IN ANALYSIS TO DETERMINE THE OPTIMUM PITCH FOR READOUT ANODES AND GEMS. MEASURING AND UNDERSTANDING SOURCES OF SYSTEMATIC ERROR: THE CONTRACTOR SHALL MEASURE, AND HELP DESIGN AND IMPLEMENT METHODS TO CONTROL, SYSTEMATIC ERROR AND THE PRESENCE OF FALSE MODULATION. MEASURING AND UNDERSTANDING PERFORMANCE OF THE TPC POLARIMETER: THE CONTRACTOR SHALL DESIGN AND OPERATE AN X-RAY POLARIMETRY SYSTEM, AND MEASURE BOTH THE RESPONSE TO POLARIZED AND UNPOLARIZED X-RAYS. THE RESULTING CALIBRATION AND CHARACTERIZATION SHALL DEMONSTRATE BOTH THAT THE DESIGN SENSITIVITY IS ACHIEVABLE AND THAT SYSTEMATICS CAN BE WELL ENOUGH CONTROLLED SO THAT THE INCREASED EFFICIENCY CAN BE USED. THIS CONTRACT CONSISTS OF A TEN MONTH BASE PERIOD FOLLOWED BY TWO TWELVE MONTH OPTIONS, BEGINNING AT CONTRACT START DATE. THE SPECIFIC MILESTONES ARE LISTED BELOW: BASE PERIOD: DESIGN READ-OUT ANODES, CHARACTERIZATION OF RESPONSE TO UNPOLARIZED BEAMS. DEVELOPMENT OF METHODS TO CONTROL FALSE MODULATION. OPERATION AND CALIBRATION OF A TPC POLARIMETERS. GAS OPTIMIZATION FOR OPERATION AT 20 KEV. OPERATION AND CALIBRATION OF TPC POLARIMETERS. GAS OPTIMIZATION FOR OPERATION AT 20 KEV. ALGORITHM DEVELOPMENT TO MAXIMIZE SENSITIVITY GAS OPTIMIZATION FOR OPERATION AT 2 KEV. MODULATION MEASUREMENTS AND CALIBRATION AT THE LLNL EBIT FACILITY.

Dates and value

Award date
Earliest action recorded: Jan 25, 2008 (the base award is not in the records GovChime holds)
Potential end of performance
Jan 30, 2010

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Sep 15, 2008. View on USAspending · Recipient on SAM.gov

Recipient

LocationSILVER SPRING, MD
UEIMQM9K8AM3X85
Business sizeSmall businessSize at award, per the contracting officer
Parent companyBLACK, KEVIN

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. GODDARD SPACE FLIGHT CENTER

Place of performance

Place of performance
Greenbelt, Prince George's County, Maryland 20771-0003
Congressional district (place of performance)
MD-04As reported at the time of the action

Classification and competition

Classification

NAICS
541710

Competition

Extent competed
Full and open competitionA
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
No set-aside used
Contract pricing
Firm fixed priceJ
Offers received
99

Contract details

Subcontracting plan
Plan not requiredB
Cost Accounting Standards clause
No - CAS waiver approvedN
Service Contract Act labor standards
No
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Multi-year contract
No
Performance-based service acquisition
Yes - service where PBA is used.Y

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Latest action
Sep 15, 2008 — Option exercisedModification 3; obligation change +$175,560
Latest substantive action
Sep 15, 2008 — Option exercisedModification 3; obligation change +$175,560
Actions by type
  • Option exercised2
2 actions recorded, Jan 25, 2008 to Sep 15, 2008; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No
Latest action: change in base and exercised options
$175,560
Latest action: change in base and all options
$175,560

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability incluC
EPA-designated product
Not requiredE

Place and origin

Place of manufacture
Mfg in U.S.D

Structure

Award or IDV
Award
Award type
DcaD
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
GSFC0
Transactions recorded under this award key
2

Funding

Funding agency code
999