Dca NNG10PH02CAMU ENGINEERING INC
Overview
Award facts
- Period of performance
- Sep 19, 2013 to Aug 31, 2013
- Ended
- Modifications
- 9
- Latest action Sep 19, 2013
- Contract type
- Dca
- PIID NNG10PH02C
Description of requirement
UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE FOLLOWING EFFORTS: SCHEDULE INPUTS TO THE MAVEN NGIMS SCHEDULER MONTHLY. REVIEW, PROVIDE COMMENTS AND BE COMPLIANT, WHERE APPROPRIATE, TO THE NGIMS SYSTEM SAFETY PLAN AND WILL BE IN COMPLIANCE WITH NASA NPR 6000.IG. REPORT TECHNICAL PROGRESS ON THE QMS, RF MEB, DETECTOR AND STRUCTURE MECHANICAL DESIGNS AND ANALYSES. SUPPORT PROGRAMMATIC AND TECHNICAL MEETING VIA TELECONS. REVIEW AND PROVIDE INPUTS ON THE QMS , RF , MEB, DETECTOR AND STRUCTURE MECHANICAL DESIGNS TO THE NGIMS PROJECT ELEMENT LEADS. SUBMIT NGIMS MECHANICAL DESIGN PACKAGES IN ELECTRONIC FORM FOR THE NGIMS PRELIMINARY DESIGN REVIEW (I-PDR) AND CRITICAL DESIGN REVIEW (I-CDR). ATTEND THE REVIEWS AND PRESENT MATERIAL AS DEEMED NECESSARY. SUPPORT THE NGIMS PRE ENVIRONMENTAL REVIEW (PER), NGIMS PRE SHIP REVIEW (PSR), AND THE PRE LAUNCH READINESS REVIEW (LRR) IF REQUIRED. SUPPORT AND ATTEND ALL NGIMS PEER REVIEWS REQUIRING MECHANICAL SUPPORT. REVIEW AND PROVIDE INPUTS TO THE NGIMS FAILURE MODES AND EFFECTS ANALYSIS (FMEA) REPORTS, SUPPORTING A SYSTEM LEVEL FMEA STARTING EARLY IN THE DESIGN PHASE TO ENSURE THAT ANY DESIGN CHANGES RESULTING FROM REVIEWS, ETC. DO NOT INTRODUCE NEW FAILURE MODES OR HIGHER-LEVEL CRITICAL FAILURE MODES INTO THE NGIMS SYSTEM. PROVIDE INPUTS TO THE NGIMS QMS SPECIFICATION, THE MECHANICAL QMS SPECIFICATION, THE NGIMS QMS INTERFACE CONTROL DOCUMENT AND THE MECHANICAL SYSTEMS INTERFACE CONTROL DOCUMENT. DEVELOP AND PROVIDE AN ACCEPTANCE DATA PACKAGE (ADP) FOR THE NGIMS MECHANICAL DESIGNS. DESIGN AND PROVIDE DRAWING PACKAGES FOR THE QMS, RF MODULE, MEB FRAMES, DETECTOR MODULE, MECHANICAL STRUCTURES NECESSARY TO ACCOMMODATE THESE ITEMS INTO THE COMPLETE NGIMS STRUCTURAL ASSEMBLY, AND REQUIRED MGSE. DESIGN AND PROVIDE A DRAWING PACKAGE FOR THE QMS INFLIGHT CALIBRATION MANIFOLD AND GAS INLET TRANSFER LINE. GENERATE ASSEMBLY DRAWINGS AND PROCEDURES FOR THE QMS, MECHANICAL STRUCTURE, RF, DETECTOR, THE MAIN ELECTRONICS BOX AND THE COMPLETE NGIMS INSTRUMENT ASSEMBLY. THE CONTRACTOR WILL ASSIST THE NGIMS LEAD MECHANICAL ENGINEER WITH THE DEVELOPMENT OF A FABRICATION PLAN.
Dates and value
- Award date
- Signed on Apr 9, 2010
- Potential end of performance
- Aug 30, 2013
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Sep 19, 2013. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- GODDARD SPACE FLIGHT CENTER
- Funded by
- National Aeronautics and Space Administration
- GODDARD SPACE FLIGHT CENTER
Place of performance
- Place of performance
- Miami, Miami-Dade County, Florida 33173-3167
- Congressional district (place of performance)
- FL-27As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- C215ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING (service)
Competition
- Extent competed
- Not competedC
- Reason not competed
- Only one source - otherONE
- Solicitation procedures
- Only one sourceSSS
- Set-aside
- No set-aside used
- Contract pricing
- Firm fixed priceJ
- Offers received
- 1
Contract details
- Subcontracting plan
- Plan not requiredB
- Major program
- Maven ngims
- Cost Accounting Standards clause
- Not applicable exempt from CASX
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Multi-year contract
- No
- Performance-based service acquisition
- No - service where PBA is not used.N
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Apr 9, 2010Base obligation at award: $512,863
- Latest action
- Sep 19, 2013 — Supplemental agreement (within scope)Modification 9
- Latest substantive action
- Sep 19, 2013 — Supplemental agreement (within scope)Modification 9
- Actions by type
- Base award1
- Other administrative action5
- Supplemental agreement (within scope)4
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Synopsized publicly (SAM.gov / FedBizOpps)
- Yes
- Simplified procedures for commercial items
- No
Pricing and financing
- Paid by purchase card
- No
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability incluC
- EPA-designated product
- Not requiredE
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- DcaD
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- GSFC0
- Transactions recorded under this award key
- 10
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- GSFC0