Po NNG12HA80PCAEN ENGINEERING, INC.
Overview
Award facts
- Period of performance
- Apr 30, 2012 to Apr 29, 2015
- Ended
- Modifications
- 0
- Latest action Apr 25, 2012
- Contract type
- Po
- PIID NNG12HA80P
Description of requirement
RAID ENCLOSURE - INCLUDING TWENTYFOUR (24) 6GB SAS REMOVABLE DRIVE TRAYS, PULL HANDLES, 1 X 2GB CACHE, THREE (3) HOT SWAP 405W POWER SUPPLIES, THREE (3) HOT SWAP FANS, FAN FAULT DETECTION, 4U HEIGHT, 4 X 8GB FIBRE HOST TO 6GB SAS/SATA RAID CONTROLLER, 667 ASIC 64 BIT SINGLE CONTROLLER, CHASSIS SLIDES INCLUDE SINGLE 6GB SAS EXPANSION PORT, 24 X 2TB TOSHIBA SAS 6GB DISK DRIVES, 7200 RPM, 64MB CACHE, 5 YEAR WARRANTY, INSTALLED AND CONFIGURED, FLASH MEMORY WITH CACHE BATTERY BACKUP KIT, INSTALLED. 3 YEAR SERVICE CONTRACT, INCLUDES PARTS ONLY
Dates and value
- Award date
- Signed on Apr 25, 2012
- Potential end of performance
- Apr 28, 2015
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Apr 25, 2012. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- GODDARD SPACE FLIGHT CENTER
- Funded by
- National Aeronautics and Space Administration
- GODDARD SPACE FLIGHT CENTER
Place of performance
- Place of performance
- Orange, California 92868-1000 United States Of America
- Congressional district (place of performance)
- CA-46As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- 7045ADP SUPPLIES (product)
Competition
- Extent competed
- Not competed under SAPG
- Reason not competed
- SAP non-competitionSP2
- Solicitation procedures
- Simplified acquisitionSP1
- Set-aside
- No set-aside used
- Contract pricing
- Firm fixed priceJ
- Offers received
- 1
Contract details
- Subcontracting plan
- Plan not requiredB
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Apr 25, 2012Base obligation at award: $15,675
- Latest action
- Apr 25, 2012 — Base awardModification 0; obligation change +$15,675
- Actions by type
- Base award1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Simplified procedures for commercial items
- No
Pricing and financing
- Paid by purchase card
- No
- Latest action: change in base and exercised options
- $15,675
- Latest action: change in base and all options
- $15,675
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Place of manufacture
- Mfg in U.S.D
Structure
- Award or IDV
- Award
- Award type
- PoB
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- GSFC0
- Transactions recorded under this award key
- 1
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- GSFC0