Dca NNH07CC75CRAYTHEON TECHNICAL SERVICES COMPANY LLC
Overview
Award facts
- Period of performance
- Jul 29, 2010 to Jul 25, 2011
- Ended
- Modifications
- 4
- Latest action Jul 29, 2010
- Contract type
- Dca
- PIID NNH07CC75C
Description of requirement
WE PROPOSE TO DEVELOP AND INTERPRET THE BEST-EVER MODEL OF THE LUNAR MAGNETIC FIELD ENVIRONMENT UTILIZING MAGNETIC AND ELECTRON REFLECTOMETER MEASUREMENTS COLLECTED FROM THE LUNAR PROSPECTOR MISSION. THIS TIME-VARIABLE MODEL WILL BE USED TO BETTER UNDERSTAND THE SPACE ENVIRONMENT, AND WILL BE UTILIZED, WITH SUPPORTING GEOLOGICAL, CHEMICAL, MINERALOGICAL, AND PETROLOGIC DATA, TO BETTER CHARACTERIZE THE SURFACE AND SUB-SURFACE SOURCES OF THE MAGNETIC FIELD. WE WILL ADDRESS SUCH SCIENTIFIC ISSUES AS THE EVOLUTION OF THE LUNAR MAGNETIC FIELD AND THE EXISTANCE AND SIZE OF A LUNAR CORE, THE ROLE OF CRATER AND BASIN IMPACTS IN PRODUCING AND EXPOSING ANOMALIES, AND WHERE APPROPRIATE, CRUSTAL STRUCTURE AND THICKNESS, THE LEVEL OF CONTAMINATION OF THE CRUST BY DIKES, AND TRANSPORT OF MAGMA TO THE SURFACE. UNLIKE ALL PREVIOUS MODELS, OUR MODEL WILL PARAMETERIZE AND COESTIMATE THE MAGNETIC FIELDS ASSOCIATED WITH THE MAJOR CURRENT SOURCES IN NEAR-LUNAR SPACE. WE HAVE PREVIOUSLY DEVELOPED SUCH COMPREHENSIVE MODELS FOR NEAR-EARTH SPACE AS PART OF A JOINT EFFORT BETWEEN U.S. AND EUROPEAN RESEARCHERS. MODELS DEVELOPED FROM THESE EFFORTS STAND OUT FROM THEIR PEERS IN LOW S/N REGIMES, SUCH AS THE EARTH AND MOON. MAGNETIC FIELD MAPPING IS A GEOLOGIC TOOL IN THE TERRESTRIAL ENVIRONMENT, AND RESEARCHERS HAVE DEVELOPED A SUITE OF MATHEMATICAL TOOLS THAT CAN BE USED TO FACILITATE INTERPRETATION. WE HAVE ADAPTED SEVERAL OF THESE TOOLS TO THE LUNAR ENVIRONMENT, AND SHOW THAT DIKE-LIKE FEATURES IN THE VICINITY OF THE SOUTH POLE-AITKEN BASIN REGION ARE AT MID-CRUSTAL DEPTHS. OUR TEAM IS COMPOSED OF EXPERTS IN COMPREHENSIVE MODELING OF THE EARTH'S MAGNETIC FIELD AND PETROPHYSICS, AND IN LUNAR GEOLOGY AND SPACE PHYSICS. THIS NEW APPROACH WILL EXTRACT THE MOST INFORMATION POSSIBLE FROM THE AVAILABLE LUNAR PROSPECTOR DATA SETS BY INTEGRATING FIELD DIRECTIONS AND MAGNITUDES FROM THE MAGNETIC FIELD INSTRUMENT WITH ESTIMATES OF THE SURFACE MAGNETIC FIELD MADE USING THE ELECTRON REFLECTOMETER. THE RESULT OF THIS APPROACH WILL BE A MAGNETIZATION MODEL. WE WILL MAKE OUR COMPREHENSIVE MAGNETIC FIELD MODEL AVAILABLE AS AN INTERACTIVE WEB APPLICATION, AND WE WILL BE WORKING WITH COLLABORATORS WHO WILL UTILIZE THE MAGNETIC FIELD MODEL TO BETTER UNDERSTAND THE PHYSICS OF THE LUNAR MINI-MAGNETOSPHERES.
Dates and value
- Award date
- Earliest action recorded: Jul 17, 2008 (the base award is not in the records GovChime holds)
- Potential end of performance
- Jul 24, 2011
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jul 29, 2010. View on USAspending · Recipient on SAM.gov
Recipient
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- NASA HEADQUARTERS
- Funded by
- National Aeronautics and Space Administration
- NASA HEADQUARTERS
Place of performance
- Place of performance
- Upper Marlboro, Prince George's County, Maryland 20774-5301
- Congressional district (place of performance)
- MD-04As reported at the time of the action
Classification and competition
Classification
- NAICS
- 541710
- Product or service (PSC)
- AR21R&D-SPACE SCIENCE & APPL-B RES (research and development)
Competition
- Extent competed
- Full and open competitionA
- Solicitation procedures
- Negotiated proposal/quoteNP
- Set-aside
- No set-aside used
- Contract pricing
- Firm fixed priceJ
- Offers received
- 41
Solicitation and notices
- Solicitation ID
- NNH06ZDA001N(as reported)
Contract details
- Subcontracting plan
- Plan not requiredB
- Cost Accounting Standards clause
- Not applicable exempt from CASX
- Service Contract Act labor standards
- No
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Multi-year contract
- No
- Performance-based service acquisition
- Yes - service where PBA is used.Y
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Latest action
- Jul 29, 2010 — Other administrative actionModification 4; administrative: no change in scope or value
- Latest substantive action
- Jul 16, 2009 — Option exercisedModification 3; obligation change +$95,284
- Actions by type
- Option exercised3
- Other administrative action1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Simplified procedures for commercial items
- No
Pricing and financing
- Paid by purchase card
- No
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability incluC
- EPA-designated product
- Not requiredE
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- DcaD
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- HQTR0
- Transactions recorded under this award key
- 4
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- HQTR0