Dca NNJ08JA58CSANTA FE SCIENCE & TECHNOLOGY, INC
Overview
Award facts
- Period of performance
- Oct 9, 2012 to Jan 29, 2010
- Ended
- Modifications
- 5
- Latest action Oct 9, 2012
- Contract type
- Dca
- PIID NNJ08JA58C
Description of requirement
HE RECOVERY OF POTABLE WATER FROM WASTE STREAMS ON BOARD SPACECRAFT IS CRITICAL FOR LIFE SUPPORT AND HEALTH OF CREW MEMBRANES ON LONG DURATION MISSIONS, SUCH AS A MANNED MISSION TO MARS OR THE ESTABLISHMENT OF LUNAR BASES. FOR THESE LONG DURATION MISSIONS IT MAY NOT BE ECONOMICAL OR PRACTICAL TO RESUPPLY POTABLE WATER FROM EARTH, AND THUS IT WILL BE NECESSARY TO RECOVER AND REPEATEDLY RE-USE LIQUID WASTES USING AN ONBOARD WATER TREATMENT SYSTEM. THIS IS IN CONTRAST TO SHORT DURATION, LOW-EARTH ORBITAL MISSIONS IN WHICH THE POTABLE WATER IS TRANSPORTED INTO SPACE AND THE RESULTING WASTEWATER GENERATED ABOARD THE SPACECRAFT IS TRANSPORTED FOR DISPOSAL ON EARTH. FOR EXAMPLE, THE SPACE SHUTTLE RELIES MAINLY ON WATER TRANSPORTED INTO SPACE AS THE SOURCE OF DRINKING WATER AND IS SUPPLEMENTED BY WATER GENERATED ON BOARD BY THE FUEL CELLS. NO RECOVERY OF ANY OF THE WASTE WATER OCCURS. IN CONTRAST, THE DRINKING WATER FOR THE INTERNATIONAL SPACE STATION (ISS) IS RETRIEVED FROM THREE SOURCES, ONLY ONE OF WHICH IS PURIFIED ONBOARD THE VEHICLE USING A WATER RECOVERY SYSTEM. THE ONLY WATER RECOVERY ON BOARD THE ISS THAT IS DEVOTED TO PRODUCING DRINKING WATER IS THE COLLECTION OF HUMIDITY CONDENSATE AND ITS RECOVERY BY ONBOARD RECOVERY EQUIPMENT. ALTHOUGH CONDENSATE ACCOUNTS FOR A LARGE PERCENTAGE OF THE DRINKING WATER (40-50%) ABOARD THE ISS, WITHOUT RESUPPLY THERE WOULD NOT BE ADEQUATE DRINKING WATER TO SUSTAIN THE CREW FOR LONG PERIODS. THE MAJORITY OF DRINKING WATER FOR THE ISS IS PRODUCED FROM WATER GENERATED BY THE FUEL CELL OF THE DOCKED SPACE SHUTTLE, OR FROM WATER STORED ONSITE THAT IS TRANSPORTED TO THE ISS FROM THE EARTH. THEREFORE, THE MANAGEMENT OF DRINKING WATER ABOARD THE ISS, WHICH IS AN OPEN LOOP SYSTEM, IS NOT SUITABLE FOR A LONG TERM MANNED SPACE MISSION. FURTHER DECREASING THE RELIANCE OF WATER SUPPLIES ABOARD THE ISS FROM WATER RESUPPLY FROM EARTH OR THE FUEL CELLS FROM THE SPACE SHUTTLE WILL REQUIRE INCREASING THE CAPABILITY TO RECOVER WASTE WATER BY PROCESSING PRETREATED URINE IN A VAPOR COMPRESSION DISTILLATION(VCD) SUBSYSTEM. THE URINE DISTILLATE PRODUCT OF THE VCD WILL BE TREATED THROUGH A COMBINATION OF ABSORPTION/ION EXCHANGE FILTRATION BEDS AND THERMAL CATALYSIS. WHEN ALL OF THESE SUBSYSTEMS ARE DEPLOYED ON THE ISS, APPROXIMATELY 95 PERCENT OF WASTEWATER WILL BE RECOVERED TO POTABLE STANDARDS.
Dates and value
- Award date
- Signed on Jan 29, 2008
- Potential end of performance
- Jan 28, 2010
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Oct 9, 2012. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- JOHNSON SPACE CENTER
- Funded by
- National Aeronautics and Space Administration
- JOHNSON SPACE CENTER
Place of performance
- Place of performance
- Santa Fe, New Mexico 87507-2940
- Congressional district (place of performance)
- NM-03As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- AN11R&D- MEDICAL: BIOMEDICAL (BASIC RESEARCH) (research and development)
Competition
- Extent competed
- Full and open competition after exclusion of sourcesD
- Solicitation procedures
- Negotiated proposal/quoteNP
- Set-aside
- Small business set aside - totalSBA
- Contract pricing
- Firm fixed priceJ
- Offers received
- 15
Contract details
- Subcontracting plan
- Plan not requiredB
- Cost Accounting Standards clause
- Not applicable exempt from CASX
- Service Contract Act labor standards
- No
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Multi-year contract
- No
- Performance-based service acquisition
- No - service where PBA is not used.N
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Jan 29, 2008Base obligation at award: $75,000
- Latest action
- Oct 9, 2012 — Other administrative actionModification 9; administrative: no change in scope or value
- Latest funding action
- May 21, 2009 — Funding onlyModification 7; obligation change +$174,973; funding only: changes obligations, not scope
- Actions by type
- Base award1
- Funding only4
- Other administrative action1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Simplified procedures for commercial items
- No
Pricing and financing
- Paid by purchase card
- No
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability incluC
- EPA-designated product
- Not requiredE
- Research program (SBIR/STTR)
- Small business innovation research program phase ii actionSR2
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
Structure
- Award or IDV
- Award
- Award type
- DcaD
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- JSC00
- Transactions recorded under this award key
- 6
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- JSC00