GovChime
AWARDPOSmall business

Po NNJ09HB74PENERGY SCIENCE LABORATORIES INC.

Overview

Award facts

Period of performance
Dec 15, 2008 to Mar 17, 2009
Ended
Modifications
0
Latest action Dec 15, 2008
Contract type
Po
PIID NNJ09HB74P

Description of requirement

REPLICATIVE ICE PHASE CHANGE MATERIAL. NASA JOHNSON SPACE CENTER (JSC) INTENDS TO INVESTIGATE THE USE OF WATER/ICE AS A PHASE CHANGE MATERIAL (PCM) HEAT SINK FOR USE ON CONSTELLATION PROGRAM OFFICE (CXPO) SPACE VEHICLES. PARAFFINS ARE TRADITIONALLY USED AS THE PHASE CHANGE MATERIAL, AND JSC HAS PREVIOUSLY PURCHASED A NUMBER OF N-PENTADECANE PCM HEAT SINKS MANUFACTURED BY ENERGY SCIENCE LABORATORIES, INC. (ESLI). THESE UNITS EACH HAVE A LATENT THERMAL STORAGE CAPACITY OF 450 KJ AND WERE SIZED TO BE REPRESENTATIVE OF PCM HEAT SINKS THAT WOULD BE USED ON THE ORION CREW EXPLORATION VEHICLE. BECAUSE WATER HAS A LATENT HEAT OF FUSION APPROXIMATELY 70% LARGER THAN THAT OF TRADITIONAL PARAFFIN (WAX) PCM S, THE USE OF WATER HAS THE POTENTIAL FOR SIGNIFICANT MASS SAVINGS. THE ADVANCED THERMAL CONTROL SYSTEMS (ATCS) PROJECT OF THE EXPLORATION TECHNOLOGY DEVELOPMENT PROGRAM (ETDP), WILL OBTAIN A WATER/ICE PCM UNIT WITH THE SAME LATENT THERMAL STORAGE CAPACITY AS THE EXISTING WAX PCM UNITS, HENCE THE NAME REPLICATIVE ICE PCM (RIP). THE RIP UNIT WILL BE TESTED SIDE-BY-SIDE WITH AN EXISTING WAX PCM UNIT IN ORDER TO DEMONSTRATE THE COMPARATIVE PERFORMANCE OF THE RIP AND TO VERIFY THAT IT DOES IN FACT REPLICATE THE LATENT THERMAL STORAGE CAPACITY OF THE EXISTING WAX PCM UNITS. BECAUSE OF THE INCREASED LATENT HEAT OF FUSION OF WATER, EVEN THOUGH THE RIP UNIT WILL HAVE THE SAME LATENT THERMAL STORAGE CAPACITY, IT IS ANTICIPATED THAT IT WILL BE SMALLER AND LESS MASSIVE. IN ORDER TO MAINTAIN AS CLOSE TO AN APPLES-TO-APPLES COMPARISON WITH THE EXISTING WAX PCM UNITS AS POSSIBLE, IT IS IMPERATIVE TO MINIMIZE THE NUMBER OF DIFFERENT VARIABLES BETWEEN THE RIP AND THE WAX UNITS. THIS INCLUDES MAINTAINING THE SAME MATERIALS OF CONSTRUCTION, MANUFACTURING METHODS, LAYOUT OF THE INTERNAL FIN STRUCTURE, AND INTERNAL CORE BLOCK LAYOUT AS THE EXISTING WAX UNITS. THEREFORE IT IS REQUIRED THAT THE MANUFACTURER OF THE ORIGINAL WAX PCM UNITS BE THE PROVIDER OF THE RIP UNIT. THE AFOREMENTIONED PROJECT HAS ALREADY PAID FOR THE ENGINEERING ASSOCIATED WITH THE EXISTING WAX PCM UNIT. CONSIDERATION OF ANY OTHER SOURCE WOULD REQUIRE NOT ONLY THE REPLICATIVE ICE PCM UNIT, BUT ALSO THE FABRICATION OF AN ADDITIONAL 450 KJ HEAT EXCHANGER USING WAX AS THE PCM. THIS WOULD BE AN IRRESPONSIBLE DUPLICATION OF COST TO THE GOVERNMENT.

Dates and value

Award date
Signed on Dec 15, 2008
Potential end of performance
Mar 16, 2009

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Dec 15, 2008. View on USAspending · Recipient on SAM.gov

Recipient

LocationSAN DIEGO, CA
UEIGUJJMG16N8K7
Business sizeSmall businessSize at award, per the contracting officer

Business types and certifications

For-profit organizationSubchapter S corporationCorporation (not tax-exempt)Manufacturer of goods

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. JOHNSON SPACE CENTER

Place of performance

Place of performance
San Diego, California 92121-2232 United States Of America
Congressional district (place of performance)
CA-51As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Not competed under SAPG
Reason not competed
SAP non-competitionSP2
Solicitation procedures
Simplified acquisitionSP1
Set-aside
No set-aside used
Contract pricing
Firm fixed priceJ
Offers received
1

Contract details

Cost Accounting Standards clause
No - CAS waiver approvedN
Government-furnished property
Transaction does not use GFE/GFPN
Consolidated requirement
No
Undefinitized action (terms not final)
No
Multi-year contract
No
Performance-based service acquisition
No - service where PBA is not used.N

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Dec 15, 2008Base obligation at award: $95,000
Latest action
Dec 15, 2008 — Base awardModification 0; obligation change +$95,000
Actions by type
  • Base award1
1 actions recorded, Dec 15, 2008 to Dec 15, 2008; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No
Latest action: change in base and exercised options
$95,000
Latest action: change in base and all options
$95,000

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability includedC
EPA-designated product
Not requiredE

Place and origin

Domestic or foreign entity
U.S. owned businessA
Sea transportation
No

Structure

Award or IDV
Award
Award type
PoB
IT commercial item category
Not IT products or servicesZ
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
JSC00
Transactions recorded under this award key
1

Funding

Funding agency code
999