Po NNJ11HC92PBIG HORN VALVE, INC.
Overview
Award facts
- Period of performance
- May 27, 2011 to Sep 1, 2011
- Ended
- Modifications
- 0
- Latest action May 27, 2011
- Contract type
- Po
- PIID NNJ11HC92P
Description of requirement
THE DEVELOPMENT OF A INHERENTLY LEAK FREE HIGH PRESSURE GASEOUS HELIUM LATCHING VALVE THAT CAN BE USED IN CRYOGENIC PROPULSION SYSTEMS IS AN ESSENTIAL PART OF A LONG RUNNING AND HIGH PRIORITY NASA EFFORT TO DEVELOP THE NEXT GENERATION OF SPACE VEHICLES AND PROPELLANT DELIVERY SYSTEMS. THE PRIMARY OBJECTIVE IS TO DEVELOP AN INNOVATIVE DRIVE UNIT INTEGRATED WITH A VALVE BODY THAT IS CAPABLE OF PROVIDING THE HIGH TORQUE REQUIRED FOR BUBBLE TIGHT PERFORMANCE WITH HIGH PRESSURE COLD HELIUM SERVICE. IT IS IMPORTANT TO NOTE THAT THE RESULTS OF THIS PROJECT WILL BE USED TO DETERMINE IF FURTHER DEVELOPMENT OF A 24VDC STEPPER MOTOR (I.E. ACTUATOR) IS WARRANTED. THE DEVELOPMENT OF THE ACTUATOR TO MATE WITH THE MAGNETIC DRIVE SYSTEM DEVELOPED IN THIS CONTRACT WILL BE A FOLLOW-UP PROPOSAL AND DEPENDENT UPON TEST RESULTS. TWO IDENTICAL 3/8 MALE AN INLET AND OUTLET MAGNETICALLY DRIVEN PCTFE SEATED NEEDLE VALVES WILL BE DEVELOPED AND DELIVERED WITHOUT ACTUATORS. AMBIENT AND CRYOGENIC TESTS (SUB-MERGED IN LN2) WILL BE PERFORMED AT BIG HORN VALVE, INC. IN WYOMING. THE PRIMARY OBJECTIVES ARE TO: MEASURE LEAK PERFORMANCE AT AMBIENT AND CRYOGENIC TEMPERATURES AT 3,300 PSIG MINIMUM OPERATING PRESSURE (MAX 5,000 PSIG) WITH A GOAL OF 5,000 ACTUATIONS TORQUE REQUIREMENTS AT AMBIENT AND CRYOGENIC TEMPERATURES AT 3,300 PSIG MINIMUM OPERATING PRESSURE (MAX 5,000 PSIG) WITH A GOAL OF 5,000 ACTUATIONS INSTRUMENTATION REQUIRED INCLUDES A METHOD OF MEASURING HELIUM LEAKAGE, A TORQUE WRENCH (OR EQUIVALENT), THERMOCOUPLES FOR TEMPERATURE (SURFACE AND/OR INTERNAL), PRESSURE TRANSDUCER(S), AND VALVE STATUS (I.E. OPEN / CLOSE) FOR COUNTING TOTAL CYCLES. FLOW RATE, VOLTAGE TRACE, AND/OR CURRENT TRACE ARE DESIRED BUT NOT REQUIRED. THE DESIRED DATA ACQUISITION RATE IS ONE SAMPLE PER SECOND. HOWEVER, IT IS UNDERSTOOD TORQUE MUST BE MEASURED BY HAND AND RECORDED SEPARATELY. AT A MINIMUM, THE FIRST, LAST, AND EVERY 50TH CYCLE MUST RECORD LEAKAGE AND TORQUE REQUIREMENTS. IN ADDITION, A DIAGRAM OF PLANNED SENSOR LOCATIONS AND SCHEMATIC OF THE TEST SETUP IS REQUIRED FOR DOCUMENTATION PURPOSES AND REPEATABILITY. ANY CONTROL SYSTEMS OR PROGRAMMING REQUIREMENTS (I.E. PRESSURE OR TEMPERATURE CONTROL LOOPS, AUTOMATIC VALVE CYCLES, ETC.) SHALL BE DEFINED.
Dates and value
- Award date
- Signed on May 27, 2011
- Potential end of performance
- Aug 31, 2011
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded May 27, 2011. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- JOHNSON SPACE CENTER
- Funded by
- National Aeronautics and Space Administration
- JOHNSON SPACE CENTER
Place of performance
- Place of performance
- Sheridan, Wyoming 82801-6135 United States Of America
- Congressional district (place of performance)
- WY-00As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- AR13R&D-AERO & SPACE TECH-ADV DEV (research and development)
Competition
- Extent competed
- Not competed under SAPG
- Reason not competed
- SAP non-competitionSP2
- Solicitation procedures
- Simplified acquisitionSP1
- Set-aside
- No set-aside used
- Contract pricing
- Firm fixed priceJ
- Offers received
- 1
Contract details
- Subcontracting plan
- Plan not requiredB
- Service Contract Act labor standards
- Yes
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Performance-based service acquisition
- No - service where PBA is not used.N
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- May 27, 2011Base obligation at award: $25,000
- Latest action
- May 27, 2011 — Base awardModification 0; obligation change +$25,000
- Actions by type
- Base award1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Synopsized publicly (SAM.gov / FedBizOpps)
- No
- Simplified procedures for commercial items
- No
Pricing and financing
- Paid by purchase card
- No
- Latest action: change in base and exercised options
- $25,000
- Latest action: change in base and all options
- $25,000
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
- Walsh-Healey Act (materials and supplies)
- No
- Construction wage rates (Davis-Bacon)
- No
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- PoB
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- JSC00
- Transactions recorded under this award key
- 1
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- JSC00