GovChime
AWARDPOSmall business

Po NNJ11HC92PBIG HORN VALVE, INC.

Overview

Award facts

Period of performance
May 27, 2011 to Sep 1, 2011
Ended
Modifications
0
Latest action May 27, 2011
Contract type
Po
PIID NNJ11HC92P

Description of requirement

THE DEVELOPMENT OF A INHERENTLY LEAK FREE HIGH PRESSURE GASEOUS HELIUM LATCHING VALVE THAT CAN BE USED IN CRYOGENIC PROPULSION SYSTEMS IS AN ESSENTIAL PART OF A LONG RUNNING AND HIGH PRIORITY NASA EFFORT TO DEVELOP THE NEXT GENERATION OF SPACE VEHICLES AND PROPELLANT DELIVERY SYSTEMS. THE PRIMARY OBJECTIVE IS TO DEVELOP AN INNOVATIVE DRIVE UNIT INTEGRATED WITH A VALVE BODY THAT IS CAPABLE OF PROVIDING THE HIGH TORQUE REQUIRED FOR BUBBLE TIGHT PERFORMANCE WITH HIGH PRESSURE COLD HELIUM SERVICE. IT IS IMPORTANT TO NOTE THAT THE RESULTS OF THIS PROJECT WILL BE USED TO DETERMINE IF FURTHER DEVELOPMENT OF A 24VDC STEPPER MOTOR (I.E. ACTUATOR) IS WARRANTED. THE DEVELOPMENT OF THE ACTUATOR TO MATE WITH THE MAGNETIC DRIVE SYSTEM DEVELOPED IN THIS CONTRACT WILL BE A FOLLOW-UP PROPOSAL AND DEPENDENT UPON TEST RESULTS. TWO IDENTICAL 3/8 MALE AN INLET AND OUTLET MAGNETICALLY DRIVEN PCTFE SEATED NEEDLE VALVES WILL BE DEVELOPED AND DELIVERED WITHOUT ACTUATORS. AMBIENT AND CRYOGENIC TESTS (SUB-MERGED IN LN2) WILL BE PERFORMED AT BIG HORN VALVE, INC. IN WYOMING. THE PRIMARY OBJECTIVES ARE TO: MEASURE LEAK PERFORMANCE AT AMBIENT AND CRYOGENIC TEMPERATURES AT 3,300 PSIG MINIMUM OPERATING PRESSURE (MAX 5,000 PSIG) WITH A GOAL OF 5,000 ACTUATIONS TORQUE REQUIREMENTS AT AMBIENT AND CRYOGENIC TEMPERATURES AT 3,300 PSIG MINIMUM OPERATING PRESSURE (MAX 5,000 PSIG) WITH A GOAL OF 5,000 ACTUATIONS INSTRUMENTATION REQUIRED INCLUDES A METHOD OF MEASURING HELIUM LEAKAGE, A TORQUE WRENCH (OR EQUIVALENT), THERMOCOUPLES FOR TEMPERATURE (SURFACE AND/OR INTERNAL), PRESSURE TRANSDUCER(S), AND VALVE STATUS (I.E. OPEN / CLOSE) FOR COUNTING TOTAL CYCLES. FLOW RATE, VOLTAGE TRACE, AND/OR CURRENT TRACE ARE DESIRED BUT NOT REQUIRED. THE DESIRED DATA ACQUISITION RATE IS ONE SAMPLE PER SECOND. HOWEVER, IT IS UNDERSTOOD TORQUE MUST BE MEASURED BY HAND AND RECORDED SEPARATELY. AT A MINIMUM, THE FIRST, LAST, AND EVERY 50TH CYCLE MUST RECORD LEAKAGE AND TORQUE REQUIREMENTS. IN ADDITION, A DIAGRAM OF PLANNED SENSOR LOCATIONS AND SCHEMATIC OF THE TEST SETUP IS REQUIRED FOR DOCUMENTATION PURPOSES AND REPEATABILITY. ANY CONTROL SYSTEMS OR PROGRAMMING REQUIREMENTS (I.E. PRESSURE OR TEMPERATURE CONTROL LOOPS, AUTOMATIC VALVE CYCLES, ETC.) SHALL BE DEFINED.

Dates and value

Award date
Signed on May 27, 2011
Potential end of performance
Aug 31, 2011

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded May 27, 2011. View on USAspending · Recipient on SAM.gov

Recipient

LocationSHERIDAN, WY
UEIQG45EM88KC83
Business sizeSmall businessSize at award, per the contracting officer
Parent companyBIG HORN VALVE, INC.

Business types and certifications

For-profit organizationCorporation (not tax-exempt)Manufacturer of goods

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. JOHNSON SPACE CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. JOHNSON SPACE CENTER

Place of performance

Place of performance
Sheridan, Wyoming 82801-6135 United States Of America
Congressional district (place of performance)
WY-00As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Not competed under SAPG
Reason not competed
SAP non-competitionSP2
Solicitation procedures
Simplified acquisitionSP1
Set-aside
No set-aside used
Contract pricing
Firm fixed priceJ
Offers received
1

Contract details

Subcontracting plan
Plan not requiredB
Service Contract Act labor standards
Yes
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Performance-based service acquisition
No - service where PBA is not used.N

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
May 27, 2011Base obligation at award: $25,000
Latest action
May 27, 2011 — Base awardModification 0; obligation change +$25,000
Actions by type
  • Base award1
1 actions recorded, May 27, 2011 to May 27, 2011; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Synopsized publicly (SAM.gov / FedBizOpps)
No
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No
Latest action: change in base and exercised options
$25,000
Latest action: change in base and all options
$25,000

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability includedC
EPA-designated product
Not requiredE
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
PoB
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
JSC00
Transactions recorded under this award key
1

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
JSC00