Po NNJ12HA48PBIG HORN VALVE, INC.
Overview
Award facts
- Period of performance
- Jan 3, 2013 to Aug 28, 2012
- Ended
- Modifications
- 1
- Latest action Jan 3, 2013
- Contract type
- Po
- PIID NNJ12HA48P
Description of requirement
REDUCED MASS LEAK FREE HIGH PRESSURE GASEOUS HELIUM VALVE BIG HORN VALVE HAS COMPLETED A PHASE III PROJECT TO DEVELOP AN INHERENTLY LEAK FREE HIGH PRESSURE HELIUM VALVE. THIS PHASE III PROJECT MET THE CRITERIA REQUIRED FOR SUCCESSFUL STEP TO THE NEXT PHASE OF DEVELOPMENT. THE ONE AREA OF FAILURE; EXTERNAL LEAKAGE AT CRYOGENIC TEMPERATURES WAS DUE TO THE SHORTCOMINGS OF USING OFF-THE-SHELF HARDWARE, WHICH WE WERE REQUIRED TO DO BECAUSE OF BUDGETARY CONSTRAINTS. THESE LEAKS WERE CAUSED BY TWO STATIC SEALS WHICH COULD NOT BE MADE TO SEAL PROPERLY AT CRYOGENIC TEMPERATURES. DESIGN ALTERNATIVE RECOMMENDATIONS 1 DESIGN A CUSTOM NEEDLE VALVE WITH A SMALLER STEM. 2 EMPLOY PLANETARY GEARS IN THE PRESSURE CHAMBER TO MAGNIFY THE TORQUE FROM THE MAGNETIC COUPLING 3 DESIGN A CUSTOM PRESSURE CHAMBER FOR THE VALVE 4 SELECT A DRIVE MOTOR THAT HAS PROVEN PERFORMANCE IN CRYOGENIC ENVIRONMENTS WORK PLAN AND TECHNICAL APPROACH OBJECTIVE 1 1 DEVELOP A MODIFIED CONCEPT OF THE FNV4TSSX VALVE WITH SMALLER STEM 2 DESIGN A PLANETARY GEAR SET AND MATCHING MAGNETIC COUPLING THAT MEETS THE TORQUE REQUIREMENT OF THE MODIFIED VALVE 3 DESIGN A CUSTOM PRESSURE CHAMBER FOR THE PLANETARY GEARS AND INNER MAGNETIC CARTRIDGE 4 SELECT A STEPPER MOTOR TO DRIVE THE MAGNETIC COUPLING OBJECTIVE 2 BUILD TWO PROTOTYPES THAT INCORPORATE THE RECOMMENDATIONS FOR A REDUCED MASS HIGH PRESSURE HELIUM VALVE 1 GENERATE FABRICATION DRAWINGS AND ORDER PARTS 2 ASSEMBLE AND PERFORM PRELIMINARY TESTS AT THE SHERIDAN, WY TESTING FACILITY 3 MAKE NECESSARY MODIFICATIONS AND PERFORM FINAL TESTS AT JSC PROGRAM IMPACT STORING COLD GASEOUS HELIUM(GHE) INCREASES DENSITY BY A FACTOR OF TWO ALLOWING FOR A SIGNIFICANT REDUCTION IN SYSTEM MASS AND VOLUME ALONG WITH REDUCED HEAT INPUT INTO THE CRYOGENIC PROPELLANTS. DEVELOPMENT OF A COLD HIGH-PRESSURE GHE VALVE FOR USE IN A CRYOGENIC PROPULSION SYSTEM IS AN ESSENTIAL PART OF A NASA EFFORT TO DEVELOP THE NEXT GENERATION OF SPACE VEHICLES AND PROPELLANT DELIVERY SYSTEMS. CURRENTLY THERE ARE NO AVAILABLE COLD HELIUM ISOLATION COMMERCIAL-OFF-THE-SHELF (COTS) VALVES. THIS DEVELOPMENT PROJECT DIRECTLY ADDRESSES A SIGNIFICANT MAJOR MISSING COMPONENT IN SYSTEM ARCHITECTURE. UPON COMPLETION OF A PROVEN PROTOTYPE VALVE, SUBSEQUENT INTEGRATED CRYOGENIC TESTING CAN BE PERFORMED TO GENERATE A COMPLETE BASELINE INTEGRATED COLD SYSTEM SOLUTION FOR ADVANCE MISSION DESIGN ON CRYOGENIC SPACECRAFT, DEPOTS, ETC.
Dates and value
- Award date
- Signed on Nov 18, 2011
- Potential end of performance
- Aug 27, 2012
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jan 3, 2013. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- JOHNSON SPACE CENTER
- Funded by
- National Aeronautics and Space Administration
- JOHNSON SPACE CENTER
Place of performance
- Place of performance
- Sheridan, Wyoming 82801-6135 United States Of America
- Congressional district (place of performance)
- WY-00As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- AR13R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (ADVANCED DEVELOPMENT) (research and development)
Competition
- Extent competed
- Full and open competition after exclusion of sourcesD
- Solicitation procedures
- Negotiated proposal/quoteNP
- Set-aside
- Small business set aside - totalSBA
- Contract pricing
- Firm fixed priceJ
- Offers received
- 1
Contract details
- Subcontracting plan
- Plan not requiredB
- Service Contract Act labor standards
- Yes
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Performance-based service acquisition
- No - service where PBA is not used.N
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Nov 18, 2011Base obligation at award: $75,000
- Latest action
- Jan 3, 2013 — Other administrative actionModification 2; administrative: no change in scope or value
- Actions by type
- Base award1
- Other administrative action1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Synopsized publicly (SAM.gov / FedBizOpps)
- Yes
- Simplified procedures for commercial items
- No
Pricing and financing
- Paid by purchase card
- No
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
- Research program (SBIR/STTR)
- Small business innovation research program phase iii actionSR3
- Walsh-Healey Act (materials and supplies)
- No
- Construction wage rates (Davis-Bacon)
- No
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- PoB
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- JSC00
- Transactions recorded under this award key
- 2
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- JSC00