GovChime
AWARDPOSmall business

Po NNJ12HA48PBIG HORN VALVE, INC.

Overview

Award facts

Period of performance
Jan 3, 2013 to Aug 28, 2012
Ended
Modifications
1
Latest action Jan 3, 2013
Contract type
Po
PIID NNJ12HA48P

Description of requirement

REDUCED MASS LEAK FREE HIGH PRESSURE GASEOUS HELIUM VALVE BIG HORN VALVE HAS COMPLETED A PHASE III PROJECT TO DEVELOP AN INHERENTLY LEAK FREE HIGH PRESSURE HELIUM VALVE. THIS PHASE III PROJECT MET THE CRITERIA REQUIRED FOR SUCCESSFUL STEP TO THE NEXT PHASE OF DEVELOPMENT. THE ONE AREA OF FAILURE; EXTERNAL LEAKAGE AT CRYOGENIC TEMPERATURES WAS DUE TO THE SHORTCOMINGS OF USING OFF-THE-SHELF HARDWARE, WHICH WE WERE REQUIRED TO DO BECAUSE OF BUDGETARY CONSTRAINTS. THESE LEAKS WERE CAUSED BY TWO STATIC SEALS WHICH COULD NOT BE MADE TO SEAL PROPERLY AT CRYOGENIC TEMPERATURES. DESIGN ALTERNATIVE RECOMMENDATIONS 1 DESIGN A CUSTOM NEEDLE VALVE WITH A SMALLER STEM. 2 EMPLOY PLANETARY GEARS IN THE PRESSURE CHAMBER TO MAGNIFY THE TORQUE FROM THE MAGNETIC COUPLING 3 DESIGN A CUSTOM PRESSURE CHAMBER FOR THE VALVE 4 SELECT A DRIVE MOTOR THAT HAS PROVEN PERFORMANCE IN CRYOGENIC ENVIRONMENTS WORK PLAN AND TECHNICAL APPROACH OBJECTIVE 1 1 DEVELOP A MODIFIED CONCEPT OF THE FNV4TSSX VALVE WITH SMALLER STEM 2 DESIGN A PLANETARY GEAR SET AND MATCHING MAGNETIC COUPLING THAT MEETS THE TORQUE REQUIREMENT OF THE MODIFIED VALVE 3 DESIGN A CUSTOM PRESSURE CHAMBER FOR THE PLANETARY GEARS AND INNER MAGNETIC CARTRIDGE 4 SELECT A STEPPER MOTOR TO DRIVE THE MAGNETIC COUPLING OBJECTIVE 2 BUILD TWO PROTOTYPES THAT INCORPORATE THE RECOMMENDATIONS FOR A REDUCED MASS HIGH PRESSURE HELIUM VALVE 1 GENERATE FABRICATION DRAWINGS AND ORDER PARTS 2 ASSEMBLE AND PERFORM PRELIMINARY TESTS AT THE SHERIDAN, WY TESTING FACILITY 3 MAKE NECESSARY MODIFICATIONS AND PERFORM FINAL TESTS AT JSC PROGRAM IMPACT STORING COLD GASEOUS HELIUM(GHE) INCREASES DENSITY BY A FACTOR OF TWO ALLOWING FOR A SIGNIFICANT REDUCTION IN SYSTEM MASS AND VOLUME ALONG WITH REDUCED HEAT INPUT INTO THE CRYOGENIC PROPELLANTS. DEVELOPMENT OF A COLD HIGH-PRESSURE GHE VALVE FOR USE IN A CRYOGENIC PROPULSION SYSTEM IS AN ESSENTIAL PART OF A NASA EFFORT TO DEVELOP THE NEXT GENERATION OF SPACE VEHICLES AND PROPELLANT DELIVERY SYSTEMS. CURRENTLY THERE ARE NO AVAILABLE COLD HELIUM ISOLATION COMMERCIAL-OFF-THE-SHELF (COTS) VALVES. THIS DEVELOPMENT PROJECT DIRECTLY ADDRESSES A SIGNIFICANT MAJOR MISSING COMPONENT IN SYSTEM ARCHITECTURE. UPON COMPLETION OF A PROVEN PROTOTYPE VALVE, SUBSEQUENT INTEGRATED CRYOGENIC TESTING CAN BE PERFORMED TO GENERATE A COMPLETE BASELINE INTEGRATED COLD SYSTEM SOLUTION FOR ADVANCE MISSION DESIGN ON CRYOGENIC SPACECRAFT, DEPOTS, ETC.

Dates and value

Award date
Signed on Nov 18, 2011
Potential end of performance
Aug 27, 2012

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jan 3, 2013. View on USAspending · Recipient on SAM.gov

Recipient

LocationSHERIDAN, WY
UEIQG45EM88KC83
Business sizeSmall businessSize at award, per the contracting officer
Parent companyBIG HORN VALVE, INC.

Business types and certifications

For-profit organizationCorporation (not tax-exempt)Manufacturer of goods

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. JOHNSON SPACE CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. JOHNSON SPACE CENTER

Place of performance

Place of performance
Sheridan, Wyoming 82801-6135 United States Of America
Congressional district (place of performance)
WY-00As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Full and open competition after exclusion of sourcesD
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
Small business set aside - totalSBA
Contract pricing
Firm fixed priceJ
Offers received
1

Contract details

Subcontracting plan
Plan not requiredB
Service Contract Act labor standards
Yes
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Performance-based service acquisition
No - service where PBA is not used.N

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Nov 18, 2011Base obligation at award: $75,000
Latest action
Jan 3, 2013 — Other administrative actionModification 2; administrative: no change in scope or value
Actions by type
  • Base award1
  • Other administrative action1
2 actions recorded, Nov 18, 2011 to Jan 3, 2013; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Synopsized publicly (SAM.gov / FedBizOpps)
Yes
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability includedC
EPA-designated product
Not requiredE
Research program (SBIR/STTR)
Small business innovation research program phase iii actionSR3
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
PoB
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
JSC00
Transactions recorded under this award key
2

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
JSC00