Po NNJ12HB16PADVANCED MAGNET LAB, INC.
Overview
Award facts
- Period of performance
- Apr 25, 2015 to Jul 31, 2012
- Ended
- Modifications
- 2
- Latest action Apr 22, 2015
- Contract type
- Po
- PIID NNJ12HB16P
Description of requirement
NASA OFFICE OF THE CHIEF TECHNOLOGIST GAME CHANGING TECHNOLOGY DIVISION UNIQUE AND INNOVATIVE SPACE TECHNOLOGY BROAD AGENCY ANNOUNCEMENT THIS WORK SUPPORTS THE ENERGY SYSTEMS DIVISION. THE DIVISION PROVIDES CONCEPTUAL DESIGN, FEASIBILITY STUDIES, ANALYSIS, DEVELOPMENT, QUALIFICATION TESTING, FLIGHT CERTIFICATION, OPERATIONS, AND SUSTAINING ENGINEERING. THE PRIMARY OBJECTIVE OF THIS CONTRACT IS TO PROVIDE THE NECESSARY RESEARCH FOR THE DEVELOPMENT OF A LIGHTWEIGHT SUPERCONDUCTING MAGNET SYSTEM FOR ACTIVE RADIATION SHIELDING OF A SPACESHIP FOR INTERPLANETARY EXPLORATIONS LIKE EXTENDED MISSIONS TO THE MOON, ASTEROID, AND MARS. TO FACILITATE LAUNCH OF SUCH A SYSTEM, A MODULAR COIL CONCEPT IS REQUIRED THAT ALLOWS ASSEMBLY OF THE VARIOUS COMPONENTS IN SPACE. THE CONTRACTOR HAS SIX MAIN TASKS. FIRST, THE CONTRACTOR WILL OPTIMIZE A COIL LAYOUT FOR RADIATION SHIELDING. THE SHIELDING EFFICIENCY DEPENDS STRONGLY ON THE LAYOUT OF THE SPACESHIP AND THE SURROUNDING COIL CONFIGURATION. THE COIL LAYOUT WILL BE OPTIMIZED WITH MONTE CARLO ANALYSIS. THE STUDY WILL CONSIDER AN ARRAY OF DOUBLE-HELIX COILS SURROUNDING THE SPACESHIP WITH ADDITIONAL COIL CONFIGURATIONS IN THE FORWARD AND AFT END OF THE MODULE. SECOND, THE CONTRACTOR WILL DETERMINE A CONCEPT OF SUPERCONDUCTING MAGNET. DURING THIS TASK THE CONCEPT OF THE REQUIRED COIL WILL BE DEVELOPED. THIRD, THE CONTRACTOR WILL DEVELOP A CONCEPT FOR CONDUCTOR PLACEMENT. A KEY DESIGN ISSUE OF THE SUPERCONDUCTING TAPE IS ITS MECHANICAL ROBUSTNESS AND ITS MINIMUM BENDING RADII. FOURTH, THE CONTRACTOR WILL DEVELOP A CONCEPT OF COIL SUPPORT STRUCTURE. THE SUPPORT STRUCTURE OF THE SUPERCONDUCTING COILS HAS TO BE LIGHT AND THE MATERIAL SHOULD MINIMIZE SECONDARY PARTICLE PRODUCTION. FIFTH, THE CONTRACTOR WILL BUILD A CONCEPTUAL DESIGN OF THE CRYOGENIC SYSTEM. THE COILS HAVE TO BE KEPT WITHIN A CERTAIN TEMPERATURE RANGE TO GUARANTEE THE SUPERCONDUCTING STATE OF THE CONDUCTOR. SIXTH, THE CONTRACTOR WILL BUILD A CONCEPTUAL DESIGN AND SPECIFICATIONS OF THE REQUIRED FLUX PUMP CHARGING SYSTEM. IT IS ANTICIPATED THAT THE SUPERCONDUCTING COILS OPERATE IN A PERSISTENT MODE WITH HIGH OPERATIONAL CURRENTS OF SEVERAL THOUSAND AMPS.
Dates and value
- Award date
- Signed on Nov 4, 2011
- Potential end of performance
- Jul 30, 2012
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Apr 22, 2015. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- JOHNSON SPACE CENTER
- Funded by
- National Aeronautics and Space Administration
- JOHNSON SPACE CENTER
Place of performance
- Place of performance
- Palm Bay, Brevard County, Florida 32905-3427 United States Of America
- Congressional district (place of performance)
- FL-08As reported at the time of the action
Classification and competition
Classification
Competition
- Extent competed
- Not competed under SAPG
- Reason not competed
- SAP non-competitionSP2
- Solicitation procedures
- Simplified acquisitionSP1
- Set-aside
- No set-aside used
- Contract pricing
- Firm fixed priceJ
- Offers received
- 1
Solicitation and notices
- Solicitation ID
- NNH11ZUA001K
- Notices
- Presolicitation posted Mar 1, 2011
Contract details
- Subcontracting plan
- Plan not requiredB
- Service Contract Act labor standards
- No
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Performance-based service acquisition
- No - service where PBA is not used.N
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Nov 4, 2011Base obligation at award: $89,000
- Latest action
- Apr 22, 2015 — Other administrative actionModification 3; administrative: no change in scope or value
- Latest substantive action
- Aug 14, 2012 — Supplemental agreement (within scope)Modification 2; obligation change +$22,500
- Actions by type
- Base award1
- Supplemental agreement (within scope)1
- Other administrative action1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Synopsized publicly (SAM.gov / FedBizOpps)
- Yes
- Simplified procedures for commercial items
- No
Pricing and financing
- Paid by purchase card
- No
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
- Walsh-Healey Act (materials and supplies)
- No
- Construction wage rates (Davis-Bacon)
- No
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- PoB
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- JSC00
- Transactions recorded under this award key
- 3
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- JSC00