GovChime
AWARDPOSmall business

Po NNJ12HB16PADVANCED MAGNET LAB, INC.

Overview

Award facts

Period of performance
Apr 25, 2015 to Jul 31, 2012
Ended
Modifications
2
Latest action Apr 22, 2015
Contract type
Po
PIID NNJ12HB16P

Description of requirement

NASA OFFICE OF THE CHIEF TECHNOLOGIST GAME CHANGING TECHNOLOGY DIVISION UNIQUE AND INNOVATIVE SPACE TECHNOLOGY BROAD AGENCY ANNOUNCEMENT THIS WORK SUPPORTS THE ENERGY SYSTEMS DIVISION. THE DIVISION PROVIDES CONCEPTUAL DESIGN, FEASIBILITY STUDIES, ANALYSIS, DEVELOPMENT, QUALIFICATION TESTING, FLIGHT CERTIFICATION, OPERATIONS, AND SUSTAINING ENGINEERING. THE PRIMARY OBJECTIVE OF THIS CONTRACT IS TO PROVIDE THE NECESSARY RESEARCH FOR THE DEVELOPMENT OF A LIGHTWEIGHT SUPERCONDUCTING MAGNET SYSTEM FOR ACTIVE RADIATION SHIELDING OF A SPACESHIP FOR INTERPLANETARY EXPLORATIONS LIKE EXTENDED MISSIONS TO THE MOON, ASTEROID, AND MARS. TO FACILITATE LAUNCH OF SUCH A SYSTEM, A MODULAR COIL CONCEPT IS REQUIRED THAT ALLOWS ASSEMBLY OF THE VARIOUS COMPONENTS IN SPACE. THE CONTRACTOR HAS SIX MAIN TASKS. FIRST, THE CONTRACTOR WILL OPTIMIZE A COIL LAYOUT FOR RADIATION SHIELDING. THE SHIELDING EFFICIENCY DEPENDS STRONGLY ON THE LAYOUT OF THE SPACESHIP AND THE SURROUNDING COIL CONFIGURATION. THE COIL LAYOUT WILL BE OPTIMIZED WITH MONTE CARLO ANALYSIS. THE STUDY WILL CONSIDER AN ARRAY OF DOUBLE-HELIX COILS SURROUNDING THE SPACESHIP WITH ADDITIONAL COIL CONFIGURATIONS IN THE FORWARD AND AFT END OF THE MODULE. SECOND, THE CONTRACTOR WILL DETERMINE A CONCEPT OF SUPERCONDUCTING MAGNET. DURING THIS TASK THE CONCEPT OF THE REQUIRED COIL WILL BE DEVELOPED. THIRD, THE CONTRACTOR WILL DEVELOP A CONCEPT FOR CONDUCTOR PLACEMENT. A KEY DESIGN ISSUE OF THE SUPERCONDUCTING TAPE IS ITS MECHANICAL ROBUSTNESS AND ITS MINIMUM BENDING RADII. FOURTH, THE CONTRACTOR WILL DEVELOP A CONCEPT OF COIL SUPPORT STRUCTURE. THE SUPPORT STRUCTURE OF THE SUPERCONDUCTING COILS HAS TO BE LIGHT AND THE MATERIAL SHOULD MINIMIZE SECONDARY PARTICLE PRODUCTION. FIFTH, THE CONTRACTOR WILL BUILD A CONCEPTUAL DESIGN OF THE CRYOGENIC SYSTEM. THE COILS HAVE TO BE KEPT WITHIN A CERTAIN TEMPERATURE RANGE TO GUARANTEE THE SUPERCONDUCTING STATE OF THE CONDUCTOR. SIXTH, THE CONTRACTOR WILL BUILD A CONCEPTUAL DESIGN AND SPECIFICATIONS OF THE REQUIRED FLUX PUMP CHARGING SYSTEM. IT IS ANTICIPATED THAT THE SUPERCONDUCTING COILS OPERATE IN A PERSISTENT MODE WITH HIGH OPERATIONAL CURRENTS OF SEVERAL THOUSAND AMPS.

Dates and value

Award date
Signed on Nov 4, 2011
Potential end of performance
Jul 30, 2012

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Apr 22, 2015. View on USAspending · Recipient on SAM.gov

Recipient

LocationPALM BAY, FL
UEIXJTRC7MFCDQ5
Business sizeSmall businessSize at award, per the contracting officer

Business types and certifications

For-profit organizationCorporation (not tax-exempt)Manufacturer of goods

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. JOHNSON SPACE CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. JOHNSON SPACE CENTER

Place of performance

Place of performance
Palm Bay, Brevard County, Florida 32905-3427 United States Of America
Congressional district (place of performance)
FL-08As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Not competed under SAPG
Reason not competed
SAP non-competitionSP2
Solicitation procedures
Simplified acquisitionSP1
Set-aside
No set-aside used
Contract pricing
Firm fixed priceJ
Offers received
1

Solicitation and notices

Solicitation ID
NNH11ZUA001K
Notices

Contract details

Subcontracting plan
Plan not requiredB
Service Contract Act labor standards
No
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Performance-based service acquisition
No - service where PBA is not used.N

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Nov 4, 2011Base obligation at award: $89,000
Latest action
Apr 22, 2015 — Other administrative actionModification 3; administrative: no change in scope or value
Latest substantive action
Aug 14, 2012 — Supplemental agreement (within scope)Modification 2; obligation change +$22,500
Actions by type
  • Base award1
  • Supplemental agreement (within scope)1
  • Other administrative action1
3 actions recorded, Nov 4, 2011 to Apr 22, 2015; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Synopsized publicly (SAM.gov / FedBizOpps)
Yes
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability includedC
EPA-designated product
Not requiredE
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
PoB
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
JSC00
Transactions recorded under this award key
3

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
JSC00