GovChime
AWARDPOSmall business

Po NNJ12HD49PTK MACHINING

Overview

Award facts

Period of performance
Aug 20, 2012 to Sep 20, 2012
Ended
Modifications
0
Latest action Aug 20, 2012
Contract type
Po
PIID NNJ12HD49P

Description of requirement

IGF::OT::IGF THIS PROCUREMENT CONSISTED OF THE MACHINING OF HD3 TEST SECTION AND HD3 CLOSEOUT PARTS, AND THE PARTS ARE BEING PURCHASED FOR EP, PROPULSION AND POWER DIVISION. NASA IS PURCHASING THE INTERNAL AND EXTERNAL COMPONENTS OF A LIQUID METHANE VAPORIZATION EXPERIMENT. THESE TWO CUSTOM MACHINED STAINLESS STEEL PARTS ARE DESIGNED TO FIT TOGETHER, AND WHEN BRAZED INTO ONE PART, WILL CREATE A SEALED HIGH-FLOW HEAT EXCHANGER. THE PRECISION OF THESE PARTS IS OF THE UTMOST IMPORTANT TO THIS EFFORT TO MAINTAIN CONSISTENCY THROUGHOUT THE EXPERIMENT. THE COMPLETED PARTS MUST BE MACHINED TO TIGHT TOLERANCES ON FIT AND FINISH, (<=0.005 TOLERANCE TO MODEL, SURFACE FINISH 125 UINCH IN THE RIBS AND<30 UINCH ELSEWHERE), SO THAT THE EXPERIMENT WILL FUNCTION CORRECTLY. THE PURPOSE OF THE EXPERIMENT IS TO VALIDATE A COMPUTER MODEL THAT WILL BE USED TO DESIGN A FULL-SIZE HEAT EXCHANGER IN THE FUTURE. THE PARTS SHOULD BE MADE OF 304 OR 316 STAINLESS STEEL AND SHOULD BE MADE BY THE SAME VENDOR, SO THAT THE CLOSE FIT CAN BE TESTED DURING MANUFACTURE. THE VENDOR WILL FOLLOW THE COMPUTER AIDED DESIGN DRAWINGS SUPPLIED BY THE NASA PROPULSION AND DIVISION. THE ANALYSIS FOR THIS EXPERIMENT WAS PERFORMED USING A COMPUTER CODE DEVELOPED SPECIFICALLY AT JSC FOR THIS PURPOSE. THE CODE WILL BE MODIFIED TO MATCH THE AS-BUILT PART, SO STRINGENT CONTROL OF THE TOLERANCES AND SURFACE FINISH ARE NOT AS IMPORTANT AS DETERMINING THE AS-BUILT DIMENSIONS. THESE PARTS COULD BE MANUFACTURED IN A VARIETY OF MEANS, AND THE PROPULSION. MILLING THE PARTS FROM A SOLID BLOCK IS PREFERRED BUT CASTING THE PART WITH POST-PROCESS SMOOTHING OR USING ADDITIVE MANUFACTURING TO BUILD UP THE PART WITH POST-PROCESS MACHINING ARE ALTERNATIVES. IF MILLING IS NOT CHOSEN AS THE MANUFACTURING METHOD, COUPONS WITH REPRESENTATIVE MATERIAL PROPERTIES NEED TO BE PROVIDED BY THE VENDOR.

Dates and value

Award date
Signed on Aug 20, 2012
Potential end of performance
Sep 19, 2012

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Aug 20, 2012. View on USAspending · Recipient on SAM.gov

Recipient

LocationHAMILTON, OH
UEITMX2WETFH5F7
Business sizeSmall businessSize at award, per the contracting officer
Parent companyTK MACHINING

Business types and certifications

For-profit organizationManufacturer of goods

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. JOHNSON SPACE CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. JOHNSON SPACE CENTER

Place of performance

Place of performance
Hamilton, Butler County, Ohio 45013-8650 United States Of America
Congressional district (place of performance)
OH-08As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Competed under SAPF
Solicitation procedures
Simplified acquisitionSP1
Set-aside
No set-aside used
Contract pricing
Firm fixed priceJ
Offers received
1

Contract details

Subcontracting plan
Plan not requiredB
Service Contract Act labor standards
No
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Performance-based service acquisition
No - service where PBA is not used.N

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Aug 20, 2012Base obligation at award: $4,800
Latest action
Aug 20, 2012 — Base awardModification 0; obligation change +$4,800
Actions by type
  • Base award1
1 actions recorded, Aug 20, 2012 to Aug 20, 2012; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Synopsized publicly (SAM.gov / FedBizOpps)
No
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No
Latest action: change in base and exercised options
$4,800
Latest action: change in base and all options
$4,800

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability includedC
EPA-designated product
Not requiredE
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
PoB
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
JSC00
Transactions recorded under this award key
1

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
JSC00