Po NNJ12HE36PENERGY SCIENCE LABORATORIES INC.
Overview
Award facts
- Period of performance
- Aug 8, 2012 to Nov 2, 2012
- Ended
- Modifications
- 0
- Latest action Aug 8, 2012
- Contract type
- Po
- PIID NNJ12HE36P
Description of requirement
IGF::OT::IGF NASA JSC S THERMAL TECHNOLOGY DEVELOPMENT PROJECT INTENDS TO CONTINUE INVESTIGATING THE USE OF ICE/WATER AS THE PHASE CHANGE MATERIAL (PCM) FOR CONSTELLATION SPACE VEHICLE HEAT EXCHANGERS. THE AFOREMENTIONED TECHNOLOGY DEVELOPMENT PROJECT IS RESPONSIBLE FOR ADVANCING TECHNOLOGIES TO A TECHNOLOGY READINESS LEVEL OF SIX PRIOR TO THE CONSTELLATION ELEMENT S PRELIMINARY DESIGN REVIEW. TRADITIONALLY, PARAFFINS ARE USED AS THE PHASE CHANGE MATERIAL FOR THESE TYPES OF SPACE APPLICATIONS. THE TECHNOLOGY DEVELOPMENT PROJECT HAS PREVIOUSLY PURCHASED AND TESTED SIX PARAFFIN (N-PENTADECANE) HEAT EXCHANGERS MANUFACTURED BY ENERGY SCIENCES LABORATORIES, INC. (ESLI). EACH OF THE SIX HEAT EXCHANGERS HAS A LATENT ENERGY THERMAL STORAGE CAPACITY OF 450 KJ AND WAS SIZED TO BE REPRESENTATIVE OF THE HEAT EXCHANGERS REQUIRED FOR ORION. BECAUSE WATER HAS A LATENT HEAT OF FUSION APPROXIMATELY 70% HIGHER THAN THAT OF TRADITIONAL PARAFFIN PHASE CHANGE MATERIALS, THE USE OF WATER CAN POTENTIALLY RESULT IN SIGNIFICANT HEAT EXCHANGER MASS AND VOLUME SAVINGS. TWO SOLE SOURCE PROCUREMENTS HAVE TAKEN PLACE SINCE 2008, PROCURING ONE RIP S (REPLICATIVE ICE PCM S, UTILIZING WATER INSTEAD OF WAX) AND TWO SMALLER ADVANCED RIP S. AFTER THEIR TESTING AN ADDITIONAL FIVE ADVANCED RIP S WERE PURCHASED IN ORDER TO DIAGNOSE PREVIOUS TEST EXPERIENCES AND TO ASSESS ADVANCED ICE PCM HEAT EXCHANGER TECHNOLOGIES. ADDITIONALLY, IN SUPPORT OF TESTING BOTH RIP AND ADVANCED RIP TEST ARTICLES THE PROJECT DESIGNED, DEVELOPED, AND FABRICATED A UNIQUE TEST STAND TO ASSESS AND QUANTIFY THE PERFORMANCE OF ALL TEST ARTICLES. BECAUSE THE PROJECT WANTED TO MAINTAIN AS CLOSE TO AN APPLES-TO-APPLES COMPARISON WITH THE SIX BASELINE PARAFFIN HEAT EXCHANGERS (MANUFACTURED BY ESLI), IT WAS IMPERATIVE THAT BOTH RIP AND ADVANCED RIP BE PROVIDED BY ESLI. THIS DESIGN INCLUDED MAINTAINING THE SAME MATERIALS OF CONSTRUCTION, MANUFACTURING METHODS (WHICH ARE PROPRIETARY TO ESLI), LAYOUT OF THE INTERNAL FIN STRUCTURE, AND INTERNAL CORE BLOCK LAYOUT AS THE EXISTING PARAFFIN HEAT EXCHANGERS. FURTHERMORE, IT WAS PRUDENT TO PROCURE THROUGH ESLI BECAUSE NASA HAS ALREADY PAID FOR THE ENGINEERING ASSOCIATED WITH THE ORIGINAL PARAFFIN UNITS. THE USE OF WATER AS THE PHASE CHANGE MATERIAL CLEARLY PROVIDES MASS AND VOLUME BENEFITS, BUT ITS USE IS NOT WITHOUT CHALLENGES. UNLIKE MOST MATERIALS, WATER EXPANDS AS IT FREEZES AND HAS A TENDENCY TO RUPTURE ITS CONTAINER DURING THE PHASE CHANGE PROCESS (E.G. CAN OF SODA IN A FREEZER). TECHNICAL LITERATURE SOURCES HINT AT THIS POTENTIAL DRAWBACK TO THE USE OF WATER, BUT NO SOLID SOURCES HAVE BEEN FOUND THAT ADEQUATELY DOCUMENT THE EXACT FAILURE MECHANISMS ASSOCIATED WITH EXPANSION STRESS FAILURES. HYPOTHESIZED SOLUTIONS ARE DOCUMENTED IN THE LITERATURE, BUT FAILURES ARE NOT. AS WITH ANY TECHNOLOGY DEVELOPMENT PROGRAM, THE SUPPOSED FAILURES ARE JUST AS IMPORTANT AS THE SUCCESSES. EXPERIENCING AND DOCUMENTING THESE FAILURES ARE CRITICAL STEPS IN ANY SUCCESSFUL TECHNOLOGY DEVELOPMENT PROJECT. THE HEAT EXCHANGERS PREVIOUSLY PURCHASED WERE SUBJECTED TO A RIGOROUS THERMAL PERFORMANCE TEST PROGRAM AT JSC. NOT SURPRISINGLY, ALL TEST ARTICLES ACHIEVED THEIR INTENDED PURPOSE. RIP ACHIEVED THE SAME LATENT ENERGY STORAGE WHILE REDUCING THE HEAT EXCHANGER MASS AND VOLUME. EVEN WITH THE INCLUDED VOID SPACE FOR EXPANSION, RIP FAILED DURING THE THERMAL CYCLING TESTS PERFORMED BY THE PROJECT. THE SMALLER HEAT EXCHANGERS, ON THE OTHER HAND, DEMONSTRATED IMPROVED VOID CONTROL AS COMPARED TO RIP, HOWEVER MANY OF THESE TEST ARTICLES INCURRED DAMAGE DUE TO FREEZING.
Dates and value
- Award date
- Signed on Aug 8, 2012
- Potential end of performance
- Nov 1, 2012
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Aug 8, 2012. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- JOHNSON SPACE CENTER
- Funded by
- National Aeronautics and Space Administration
- JOHNSON SPACE CENTER
Place of performance
- Place of performance
- San Diego, California 92121-2232 United States Of America
- Congressional district (place of performance)
- CA-51As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- AC91R&D- DEFENSE SYSTEM: MISCELLANEOUS HARD GOODS (BASIC RESEARCH) (research and development)
Competition
- Extent competed
- Competed under SAPF
- Solicitation procedures
- Simplified acquisitionSP1
- Set-aside
- No set-aside used
- Contract pricing
- Firm fixed priceJ
- Offers received
- 1
Solicitation and notices
- Solicitation ID
- NNJ12442938R
- Notices
- Award Notice posted Aug 21, 2012
- Presolicitation posted Jul 27, 2012
- Presolicitation posted Jul 20, 2012
Contract details
- Subcontracting plan
- Plan not requiredB
- Service Contract Act labor standards
- No
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Performance-based service acquisition
- No - service where PBA is not used.N
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Aug 8, 2012Base obligation at award: $74,000
- Latest action
- Aug 8, 2012 — Base awardModification 0; obligation change +$74,000
- Actions by type
- Base award1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Synopsized publicly (SAM.gov / FedBizOpps)
- No
- Simplified procedures for commercial items
- No
Pricing and financing
- Paid by purchase card
- No
- Latest action: change in base and exercised options
- $74,000
- Latest action: change in base and all options
- $74,000
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
- Walsh-Healey Act (materials and supplies)
- No
- Construction wage rates (Davis-Bacon)
- No
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- PoB
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- JSC00
- Transactions recorded under this award key
- 1
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- JSC00