GovChime
AWARDPOSmall business

Po NNJ13HE25PLEYDEN ENERGY, INC.

Overview

Award facts

Period of performance
Aug 15, 2013 to Sep 30, 2013
Ended
Modifications
0
Latest action Aug 15, 2013
Contract type
Po
PIID NNJ13HE25P

Description of requirement

IGF::OT::IGF THE POWER SYSTEMS BRANCH AT THE JOHNSON SPACE CENTER (JSC) PERFORMS RESEARCH, DESIGN, DEVELOPMENT, AND TESTING OF BATTERIES AND BATTERY CHARGING DEVICES FOR USE IN HUMAN SPACE FLIGHT APPLICATIONS. MATURATION OF AN ON-DEMAND INTERNAL SHORT CIRCUIT DEVICE FOR TESTING THE SAFETY OF LI-ION CELL DESIGNS IS REQUIRED FOR ASSESSING THE SAFETY RISK OF INTERNAL SHORTS IN LI-ION CELLS. THIS JUSTIFICATION PROVIDES THE RATIONALE FOR CONTRACTING BY OTHER THAN FULL AND OPEN COMPETITION FOR THE SERVICE OF DEMONSTRATING THE SAFETY BENEFIT OF A NON-FLAMMABLE ELECTROLYTE FOR LI-ION CELLS WITH LEYDEN ENERGY, INC. THE SERVICE REQUESTED REQUIRES IMPLANTING GFE DEVICES IN LEYDEN S CELLS DURING ASSEMBLY, COMPLETING THE ASSEMBLY WITH AND WITHOUT THEIR NON-FLAMMABLE ELECTROLYTE, AND ACTIVATING THE SHORTING DEVICE TO DETERMINE THE SAFETY BENEFIT OF THE NEW ELECTROLYTE. ESTIMATED TOTAL COST FOR ALL DELIVERABLES IS $9,750. LEYDEN IS UNIQUELY QUALIFIED TO PROVIDE THIS TESTING SERVICE BECAUSE THEY HAVE DEVELOPED THIS INNOVATIVE AND PROPRIETARY ELECTROLYTE FORMULATION THAT IS NON-FLAMMABLE AND PRODUCES NEGLIGIBLE PERFORMANCE IMPACTS. IF THIS DEMONSTRATION IS SUCCESSFUL, IT WILL BE A GAME CHANGING TECHNOLOGICAL ADVANCE IN THE FIELD OF HIGH ENERGY LI-ION BATTERIES. THE STATUTORY AUTHORITY PERMITTING OTHER THAN FULL AND OPEN COMPETITION IS 10 U.S.C. 2304(C)(1). AS CONTEMPLATED BY THE PROVISIONS OF FAR 6.302-1, WHICH STATES, ONLY ONE RESPONSIBLE SOURCE AND NO OTHER SUPPLIES OR SERVICES WILL SATISFY AGENCY REQUIREMENTS . NASA CAN T SOURCE THIS TO AN ALTERNATE SOURCE BECAUSE THE ELECTROLYTE FORMULATION IS PROPRIETARY TO LEYDEN. LEYDEN IS NOT WILLING TO SELL US THEIR ELECTROLYTE BECAUSE WORKS WITH THEIR CELL DESIGN. WE HAVE TO DO THE DEMONSTRATION TESTS WITH THEIR CELL DESIGN. LEYDEN SPENT OVER $1 MILLION DEVELOPING THIS TECHNOLOGY. THE ADDITIONAL EXPENSES THAT NASA WOULD INCUR FROM GIVING THIS WORK TO ANOTHER SOURCE THAN LEYDEN WOULD EXCEED $100K AND COULD TAKE AN EXTRA 1 YEAR AT LEAST. NO MARKET SURVEY WAS CONDUCTED BECAUSE LEYDEN S TECHNOLOGY IS PROPRIETARY TO THEM. MY SEARCH OF LI-ION CELL MANUFACTURERS FOUND NONE OTHER SELLING A CELL DESIGN WITH NON-FLAMMABLE ELECTROLYTE.

Dates and value

Award date
Signed on Aug 15, 2013
Potential end of performance
Sep 29, 2013

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Aug 15, 2013. View on USAspending · Recipient on SAM.gov

Recipient

LocationFREMONT, CA
UEIRLXNATDNJXG5
Business sizeSmall businessSize at award, per the contracting officer
Parent companyLEYDEN ENERGY, INC.

Business types and certifications

For-profit organizationCorporation (not tax-exempt)Manufacturer of goods

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. JOHNSON SPACE CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. JOHNSON SPACE CENTER

Place of performance

Place of performance
Fremont, Alameda County, California 94538-6543 United States Of America
Congressional district (place of performance)
CA-17As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Not competed under SAPG
Reason not competed
SAP non-competitionSP2
Solicitation procedures
Simplified acquisitionSP1
Set-aside
No set-aside used
Contract pricing
Firm fixed priceJ
Offers received
1

Contract details

Subcontracting plan
Plan not requiredB
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Performance-based service acquisition
Yes - service where PBA is used.Y

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Aug 15, 2013Base obligation at award: $9,750
Latest action
Aug 15, 2013 — Base awardModification 0; obligation change +$9,750
Actions by type
  • Base award1
1 actions recorded, Aug 15, 2013 to Aug 15, 2013; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Synopsized publicly (SAM.gov / FedBizOpps)
No
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No
Latest action: change in base and exercised options
$9,750
Latest action: change in base and all options
$9,750

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability includedC
EPA-designated product
Not requiredE

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
PoB
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
JSC00
Transactions recorded under this award key
1

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
JSC00