Dca NNK13MA07CTHE BOEING COMPANY
Overview
Award facts
- Period of performance
- Nov 19, 2013 to May 30, 2014
- Ended
- Modifications
- 5
- Latest action Nov 19, 2013
- Contract type
- Dca
- PIID NNK13MA07C
Description of requirement
IGF::OT::IGF CPC WILL BEGIN CERTIFICATION EFFORTS UNDER PHASE 1 BY CONTRACTING WITH MULTIPLE INDUSTRY PROVIDERS FOR THE PURCHASE OF EARLY LIFECYCLE CERTIFICATION DATA PRODUCTS RELATED TO AN END-TO-END CREW TRANSPORTATION SYSTEM (CTS) FOR AN INTERNATIONAL SPACE STATION (ISS) DESIGN REFERENCE MISSION (DRM). CONTRACT DELIVERABLES INCLUDE ALTERNATE STANDARDS, HAZARD REPORTS, VERIFICATION AND VALIDATION PLAN, AND CERTIFICATION PLAN. PHASE 1 CONTRACT SCOPE WILL INCLUDE TECHNICAL INTERCHANGE BETWEEN NASA AND THE CONTRACTOR ON HOW DELIVERABLES MEET NASA CERTIFICATION REQUIREMENTS. PHASE 2 WILL BUILD ON THE RESULTS OF PHASE 1 AND CONTINUES THE CERTIFICATION ACTIVITY WITH FOCUS ON THE MAJOR CERTIFICATION ACCEPTANCE ACTIVITIES RESULTING IN NASA CERTIFICATION. PHASE 2 WILL ALSO INCLUDE AT LEAST ONE CREWED ISS DEMONSTRATION MISSION AND MAY INCLUDE ADDITIONAL CREWED MISSIONS TO ISS. THE AWARD CRITERIA FOR PHASE 2 WILL INCLUDE DEMONSTRATED COMPLETION OF PREVIOUS SPECIFIED PHASE 1 REQUIREMENTS. THE GOVERNMENT EXPECTS THAT ONLY PHASE 1 CONTRACTORS WILL BE CAPABLE OF SUCCESSFULLY COMPETING FOR PHASE 2. PROPOSALS FOR PHASE 2 WILL BE REQUESTED FROM THESE CONTRACTORS. PHASE 2 WILL BE SOLICITED UNDER A SEPARATE RFP TO BE RELEASED DURING THE PERFORMANCE OF THE AWARDED PHASE 1 CONTRACTS AND WILL BUILD ON THE RESULTS FROM PHASE 1. PHASE 2 WILL BE SYNOPSIZED IN ACCORDANCE WITH FAR 5.201 AND 5.203. THE CONTRACTOR SHALL DELIVER TWO VERSIONS OF EACH CLIN DELIVERABLE: INITIAL AND FINAL. EACH DELIVERABLE SHALL BE CONSISTENT WITH THE DESIGN MATURITY OF THE CONTRACTOR S CTS AT THE TIME OF DELIVERY AND INCLUDE NOMENCLATURE TO IDENTIFY THE DESIGN MATURITY ASSOCIATED WITH THE CONTENTS IN THE DELIVERABLE. EACH DELIVERABLE SHALL ADDRESS THE RELEVANT REQUIREMENTS IN THE APPLICABLE DOCUMENTS LISTED IN SECTION C.6. EACH DELIVERABLE SHALL IDENTIFY RELEVANT NON-COMPLIANCE WITH CCT-REQ-1130 AND SSP 50808 REQUIREMENTS. FINAL DELIVERABLES MUST ADDRESS CONSISTENCY REQUIREMENTS AS DESCRIBED IN SECTION H, CONSISTENCY OF FINAL DATA DELIVERABLES .WITH THE EXCEPTION OF CLIN 2, HAZARD REPORTS, CONTRACTOR PREFERRED FORMATS AND DOCUMENTATION MAY BE USED TO MEET THE DATA REQUIREMENTS IF TRACEABILITY FROM THE CONTRACTOR DOCUMENT(S) TO THE DELIVERABLE REQUIREMENTS IS PROVIDED. CONTRACTOR PREFERRED CONFIGURATION MANAGEMENT OF DELIVERABLES CAN BE USED AS LONG AS THE DELIVERABLES ARE MARKED WITH THE CONTRACT NUMBER, VERSION, AND CLIN NUMBER. DELIVERABLES SHALL BE READABLE, PRINTABLE, AND DOWNLOADABLE BY NASA UTILIZING PUBLICLY AVAILABLE OFF-THE-SHELF SOFTWARE.
Dates and value
- Award date
- Signed on Dec 6, 2012
- Potential end of performance
- May 29, 2014
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Nov 19, 2013. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
Self-reported at the time of the action.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- KENNEDY SPACE CENTER
- Funded by
- National Aeronautics and Space Administration
- KENNEDY SPACE CENTER
Place of performance
- Place of performance
- Houston, Harris County, Texas 77058-1160 United States Of America
- Congressional district (place of performance)
- TX-36As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- AR17R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (COMMERCIALIZED) (research and development)
Competition
- Extent competed
- Full and open competitionA
- Solicitation procedures
- Negotiated proposal/quoteNP
- Set-aside
- No set-aside used
- Contract pricing
- Firm fixed priceJ
- Offers received
- 3
Contract details
- Subcontracting plan
- Plan not requiredB
- Cost Accounting Standards clause
- Not applicable exempt from CASX
- Certified cost or pricing data
- No
- Service Contract Act labor standards
- No
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Multi-year contract
- No
- Performance-based service acquisition
- Yes - service where PBA is used.Y
Transaction history
Modification history
- Base award
- Dec 6, 2012Base obligation at award: $3,997,200
- Latest action
- Nov 19, 2013 — Supplemental agreement (within scope)Modification 5; obligation change +$1,893,000
- Latest substantive action
- Nov 19, 2013 — Supplemental agreement (within scope)Modification 5; obligation change +$1,893,000
- Latest funding action
- Sep 25, 2013 — Funding onlyModification 4; obligation change +$3,100,000; funding only: changes obligations, not scope
- Actions by type
- Base award1
- Supplemental agreement (within scope)3
- Funding only2
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Synopsized publicly (SAM.gov / FedBizOpps)
- Yes
- Simplified procedures for commercial items
- No
Pricing and financing
- Paid by purchase card
- No
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
- Walsh-Healey Act (materials and supplies)
- No
- Construction wage rates (Davis-Bacon)
- No
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- DcaD
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- KSC00
- Transactions recorded under this award key
- 6
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- KSC00