Definitive contract NNL07AA54CBOEING LAUNCH SERVICES, INC.
Overview
Award facts
- Period of performance
- Jun 18, 2018 to May 8, 2012
- Ended
- Modifications
- 13
- Latest action Jun 18, 2018
- Contract type
- Definitive contract
- PIID NNL07AA54C
Description of requirement
TITLE OF EFFORT: ACOUSTIC PREDICTION METHODOLOGY AND TEST VALIDATION FOR AN EFFICIENT LOW-NOISE HYBRID WING BODY SUBSONIC TRANSPORT. (REFERENCE: NASA AMRD NRA NNH06ZEA001N AMENDMENT 4, APPENDIX A.2, TOPIC A.2.4 HYBRID WING/BODY TECHNOLOGIES). THE NEW TECHNOLOGIES FOR THIS EFFORT ARE DIRECTED PRIMARILY TOWARDS MEETING THE REDUCED NOISE GOAL. WHILE THE SAX-40 BASED GEOMETRY BEING PROPOSED OFFERS SUBSTANTIALLY IMPROVED FUEL BURN, THE FUEL BURN GOAL IS SOMEWHAT SECONDARY IN THAT THE FOCUS OF THE CHANGES TO THE GEOMETRY ARE TO MEET THE NOISE GOAL. THUS, THE PLAN IS TO DETERMINE THE FUEL BURN ADVANTAGES OF THE CONFIGURATION INCLUDING IMPACTS OF POTENTIAL CHANGES TO REDUCE NOISE. SINCE LTO NOX EMISSIONS ARE FROM THE ENGINE, EMISSIONS TECHNOLOGY DEVELOPMENT NEEDS TO BE DONE AS AN ENGINE DISCIPLINE. THEREFORE, THIS EFFORT IS TO ENABLE DEVELOPMENT OF PREDICTION METHODS WITH WIND TUNNEL TEST VALIDATIONS USING A FUEL-EFFICIENT HYBRID WING BODY CONFIGURATION BASED ON THE NON-PROPRIETARY CMI SAX-40 GEOMETRY. THE NASA LONG-TERM GOAL IS TO DEVELOP HIGH-FIDELITY PHYSICS-BASED PREDICTION METHODS. MOST OF THE VERY LOW FLYOVER NOISE POTENTIAL OF THE HYBRID WING BODY DERIVES FROM NOISE SHIELDING FOR WHICH VALIDATED FUNDAMENTAL PREDICTION METHODS ARE STILL IN AN EARLY STATE OF DEVELOPMENT. THUS, A NON-PROPRIETARY 3D DEFINITION REPRESENTATIVE OF A FLYABLE EFFICIENT TRANSPORT SUITABLE FOR WIND TUNNEL TESTING NEEDS TO BE CREATED IN PHASE 1. A MAJOR PORTION OF THE FOLLOWING PHASE 2 PROPOSED EFFORT IS TO DESIGN AND BUILD A WIND TUNNEL MODEL WITH TEST CONFIGURATION REQUIREMENTS GUIDED BY DEVELOPMENT OF THE PREDICTIVE METHODS. ADVANCING PREDICTION METHODOLOGIES FOR NOISE SHIELDING WILL INITIALLY START WITH EMPIRICISM TO IDENTIFY THE NEEDS. AS INVESTIGATIONS CONTINUE INTO YEARS 2 AND 3, INCREASING FIDELITY REFINEMENTS WILL BE INCORPORATED. THE WIND TUNNEL MODEL WILL BE DESIGNED AND WIND TUNNEL TESTED FOR LOW-SPEED AERODYNAMIC AND NOISE DATA IN PHASE 2 (YEAR 2 AND YEAR 3 RESPECTIVELY).
Dates and value
- Award date
- Earliest action recorded: Feb 21, 2008 (the base award is not in the records GovChime holds)
- Potential end of performance
- May 7, 2012
- Current value
- $4,571,585Base and exercised options
- Potential value (if all options are exercised)
- $4,571,585
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jun 18, 2018. View on USAspending · Recipient on SAM.gov
Recipient
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- NASA LANGLEY RESEARCH CENTER
- Funded by
- National Aeronautics and Space Administration
- NASA LANGLEY RESEARCH CENTER
- Funded from
- Aeronautics (DIRECT)Program activities080-0126Federal accounts (agency financial reports)
Place of performance
- Place of performance
- Huntington Beach, Orange County, California 92647-2048
- Congressional district (place of performance)
- CA-47As reported at the time of the action
Classification and competition
Classification
Competition
- Extent competed
- Full and open competitionA
- Solicitation procedures
- Negotiated proposal/quoteNP
- Set-aside
- No set-aside used
- Contract pricing
- Cost plus fixed feeU
- Offers received
- 74
Contract details
- Subcontracting plan
- Plan required - incentive not includedC
- Cost Accounting Standards clause
- Not applicable exempt from CASX
- Service Contract Act labor standards
- No
- Commercial procedures
- Commercial item procedures not usedD
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Multi-year contract
- No
- Performance-based service acquisition
- Yes - service where PBA is used.Y
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Latest action
- Jun 18, 2018 — Other administrative actionModification 13; obligation change +$11,776; administrative: no change in scope or value
- Latest substantive action
- Jun 15, 2011 — Supplemental agreement (within scope)Modification 11
- Actions by type
- Supplemental agreement (within scope)10
- Other administrative action3
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Synopsized publicly (SAM.gov / FedBizOpps)
- Yes
- Simplified procedures for commercial items
- No
- A-76 (FAIR Act) action
- No
Pricing and financing
- Paid by purchase card
- No
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
- Clinger-Cohen Act planning (IT)
- No
Place and origin
- Country of product or service origin
- United statesUSA
- Place of manufacture
- Mfg in U.S.D
Structure
- Award or IDV
- Award
- Award type
- Definitive contractD
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- 80LARC
- Transactions recorded under this award key
- 13
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- 80LARC
- Treasury accounts
- 080-2018/2019-0126-000
- Object classes
- 25.5: Research and development contracts