GovChime
AWARDDEFINITIVE CONTRACTOther than small business

Definitive contract NNL07AA54CBOEING LAUNCH SERVICES, INC.

Overview

Award facts

Period of performance
Jun 18, 2018 to May 8, 2012
Ended
Modifications
13
Latest action Jun 18, 2018
Contract type
Definitive contract
PIID NNL07AA54C

Description of requirement

TITLE OF EFFORT: ACOUSTIC PREDICTION METHODOLOGY AND TEST VALIDATION FOR AN EFFICIENT LOW-NOISE HYBRID WING BODY SUBSONIC TRANSPORT. (REFERENCE: NASA AMRD NRA NNH06ZEA001N AMENDMENT 4, APPENDIX A.2, TOPIC A.2.4 HYBRID WING/BODY TECHNOLOGIES). THE NEW TECHNOLOGIES FOR THIS EFFORT ARE DIRECTED PRIMARILY TOWARDS MEETING THE REDUCED NOISE GOAL. WHILE THE SAX-40 BASED GEOMETRY BEING PROPOSED OFFERS SUBSTANTIALLY IMPROVED FUEL BURN, THE FUEL BURN GOAL IS SOMEWHAT SECONDARY IN THAT THE FOCUS OF THE CHANGES TO THE GEOMETRY ARE TO MEET THE NOISE GOAL. THUS, THE PLAN IS TO DETERMINE THE FUEL BURN ADVANTAGES OF THE CONFIGURATION INCLUDING IMPACTS OF POTENTIAL CHANGES TO REDUCE NOISE. SINCE LTO NOX EMISSIONS ARE FROM THE ENGINE, EMISSIONS TECHNOLOGY DEVELOPMENT NEEDS TO BE DONE AS AN ENGINE DISCIPLINE. THEREFORE, THIS EFFORT IS TO ENABLE DEVELOPMENT OF PREDICTION METHODS WITH WIND TUNNEL TEST VALIDATIONS USING A FUEL-EFFICIENT HYBRID WING BODY CONFIGURATION BASED ON THE NON-PROPRIETARY CMI SAX-40 GEOMETRY. THE NASA LONG-TERM GOAL IS TO DEVELOP HIGH-FIDELITY PHYSICS-BASED PREDICTION METHODS. MOST OF THE VERY LOW FLYOVER NOISE POTENTIAL OF THE HYBRID WING BODY DERIVES FROM NOISE SHIELDING FOR WHICH VALIDATED FUNDAMENTAL PREDICTION METHODS ARE STILL IN AN EARLY STATE OF DEVELOPMENT. THUS, A NON-PROPRIETARY 3D DEFINITION REPRESENTATIVE OF A FLYABLE EFFICIENT TRANSPORT SUITABLE FOR WIND TUNNEL TESTING NEEDS TO BE CREATED IN PHASE 1. A MAJOR PORTION OF THE FOLLOWING PHASE 2 PROPOSED EFFORT IS TO DESIGN AND BUILD A WIND TUNNEL MODEL WITH TEST CONFIGURATION REQUIREMENTS GUIDED BY DEVELOPMENT OF THE PREDICTIVE METHODS. ADVANCING PREDICTION METHODOLOGIES FOR NOISE SHIELDING WILL INITIALLY START WITH EMPIRICISM TO IDENTIFY THE NEEDS. AS INVESTIGATIONS CONTINUE INTO YEARS 2 AND 3, INCREASING FIDELITY REFINEMENTS WILL BE INCORPORATED. THE WIND TUNNEL MODEL WILL BE DESIGNED AND WIND TUNNEL TESTED FOR LOW-SPEED AERODYNAMIC AND NOISE DATA IN PHASE 2 (YEAR 2 AND YEAR 3 RESPECTIVELY).

Dates and value

Award date
Earliest action recorded: Feb 21, 2008 (the base award is not in the records GovChime holds)
Potential end of performance
May 7, 2012
Current value
$4,571,585Base and exercised options
Potential value (if all options are exercised)
$4,571,585

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jun 18, 2018. View on USAspending · Recipient on SAM.gov

Recipient

LocationHUNTINGTON BEACH, CA
UEIZD6LMLA5XB23
CAGE code1X7P5
Business sizeOther than small businessSize at award, per the contracting officer
Parent companyTHE BOEING COMPANY

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. NASA LANGLEY RESEARCH CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. NASA LANGLEY RESEARCH CENTER
Funded from
Aeronautics (DIRECT)Program activities080-0126Federal accounts (agency financial reports)

Place of performance

Place of performance
Huntington Beach, Orange County, California 92647-2048
Congressional district (place of performance)
CA-47As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Full and open competitionA
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
No set-aside used
Contract pricing
Cost plus fixed feeU
Offers received
74

Contract details

Subcontracting plan
Plan required - incentive not includedC
Cost Accounting Standards clause
Not applicable exempt from CASX
Service Contract Act labor standards
No
Commercial procedures
Commercial item procedures not usedD
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Multi-year contract
No
Performance-based service acquisition
Yes - service where PBA is used.Y

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Latest action
Jun 18, 2018 — Other administrative actionModification 13; obligation change +$11,776; administrative: no change in scope or value
Latest substantive action
Jun 15, 2011 — Supplemental agreement (within scope)Modification 11
Actions by type
  • Supplemental agreement (within scope)10
  • Other administrative action3
13 actions recorded, Feb 21, 2008 to Jun 18, 2018; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Synopsized publicly (SAM.gov / FedBizOpps)
Yes
Simplified procedures for commercial items
No
A-76 (FAIR Act) action
No

Pricing and financing

Paid by purchase card
No

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability includedC
EPA-designated product
Not requiredE
Clinger-Cohen Act planning (IT)
No

Place and origin

Country of product or service origin
United statesUSA
Place of manufacture
Mfg in U.S.D

Structure

Award or IDV
Award
Award type
Definitive contractD
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
80LARC
Transactions recorded under this award key
13

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
80LARC
Treasury accounts
  • 080-2018/2019-0126-000
Object classes
  • 25.5: Research and development contracts