Delivery order NNL11AB41TATK SPACE SYSTEMS LLC
Overview
Award facts
- Net obligations
- $196.96K
- $196,965of $197.97K potential value
- Period of performance
- Aug 11, 2018 to Jun 29, 2012
- Ended
- Modifications
- 3
- Latest action Aug 11, 2018
- Contract type
- Delivery order
- PIID NNL11AB41T
Description of requirement
SMAAART TASK ORDER: STATEMENT OF WORK (SOW) TASK TITLE: 8-FOOT HIGH TEMPERATURE TUNNEL (8 HTT) LARGE-SCALE SCRAMJET ENGINE TEST TECHNIQUES (LSETT) TEST ENGINEERING SUPPORT 1.0 INTRODUCTION/BACKGROUND: NASAS HYPERSONIC PROJECT, THE AIR FORCE RESEARCH LABORATORY (AFRL), AND THE DEPARTMENT OF DEFENSES (DODS) TEST RESOURCE MANAGEMENT CENTERS ADVANCED PROPULSION TEST TECHNOLOGY FOCUS AREA HAVE ENTERED INTO A COLLABORATIVE TEST EFFORT TO QUANTIFY LARGE SCALE SCRAMJET TO FACILITY INTERACTIONS THAT AFFECT THE TEST ARTICLE PERFORMANCE. FUTURE PROGRAMS FROM ALL THREE AGENCIES FOCUS ON THE DEVELOPMENT OF INCREASINGLY LARGE SCRAMJET ENGINES. THERE ARE TWO EXISTING NATIONAL HYPERSONIC TEST FACILITIES USED TO PERFORM FREEJET TESTING OF SCRAMJET ENGINES. THE FIRST IS THE ARNOLD ENGINEERING DEVELOPMENT CENTERS AERODYNAMIC AND PROPULSION TEST UNIT (APTU) WHICH HAS A 42 DIAMETER HYPERSONIC TEST STREAM. THE SECOND IS THE NASA LANGLEY RESEARCH CENTER 8-FOOT HIGH TEMPERATURE TUNNEL WHICH HAS A 96 DIAMETER TEST STREAM. THE DEVELOPMENT OF LARGER SCRAMJET ENGINES PLACES NEW DEMANDS ON THESE TWO TEST FACILITIES AND RESULTS IN SIGNIFICANT INTERACTION BETWEEN THE TEST ENGINE AND THE TEST FACILITY. IT IS CRITICAL THAT THESE INTERACTIONS AND THE IMPACT THEY HAVE ON THE MEASURED ENGINE PERFORMANCE ARE PREDICTABLE AND WELL UNDERSTOOD. THE INCREASING SIZE OF FUTURE SCRAMJET ENGINES WILL RESULT IN BLOCKING A LARGE PORTION OF THE TEST FACILITY HYPERSONIC FLOW AND WILL ALSO REQUIRE TRUNCATION OF THE ENGINE INLET AND EXIT NOZZLE TO PHYSICALLY FIT INTO THE EXISTING TEST FACILITIES. THE TRUNCATION OF THE INLET AND NOZZLE, AS WELL AS THE LARGE FRACTION OF FLOW BLOCKAGE FOR THESE FUTURE LARGE ENGINES, WILL RESULT IN FACILITY INDUCED IMPACTS ON THE MEASURED ENGINE PERFORMANCE. THE FUTURE DEVELOPMENT AND PRODUCTION OF LARGE SCALE SCRAMJETS DEPEND HEAVILY ON THE ABILITY TO ACCURATELY PREDICT THE IMPACT OF THE TEST FACILITY ON THE MEASURED DATA. THE COLLABORATIVE TESTING EFFORT BETWEEN THE THREE ORGANIZATIONS WILL PRODUCE EXPERIMENTAL DATA ASSESSING THESE IMPACTS AND PROVIDING A BENCHMARK DATA SET RELATIVE TO TEST FACILITY / SCRAMJET INTERACTIONS. 2.0 SCOPE / OBJECTIVE(S): THE SCOPE OF THIS TASK IS TO PROVIDE TEST ENGINEERING SUPPORT FOR THE LSETT TEST IN THE NASA LANGLEY 8 HTT. THE TESTING IS SCHEDULED TO OCCUR DURING THE SECOND HALF OF FY 2011, BUT TEST PREPARATION IS REQUIRED TO BEGIN IN JANUARY 2011 IN ORDER TO MEET THE TEST SCHEDULE. THE OBJECTIVE OF LSETT TESTING IN THE 8 HTT IS TO TEST A CONTRACTOR DESIGNED SCRAMJET ENGINE WITH A FULL INLET AND NOZZLE IN THE 8 HTT AT MACH 5 FLIGHT CONDITIONS. 3.0 DESCRIPTION OF THE WORK/TASKS TO BE PERFORMED: THE CONTRACTOR SHALL PERFORM THE FOLLOWING TASKS: 3.1 TEST PLANNING AND DOCUMENTATION. 3.1.1 THE CONTRACTOR SHALL PARTICIPATE IN WEEKLY TELECONS TO DEFINE THE INTEGRATED RUN SEQUENCE REQUIRED FOR SAFE EXECUTION OF THE LSETT TEST IN THE 8 HTT. THE DEFINITION OF THE INTEGRATED RUN SEQUENCE SHALL BE A COLLABORATIVE EFFORT AND WILL BE MUTUALLY AGREED UPON BY THE CONTRACTOR AND NASA. THE COMPLETED INTEGRATED RUN SEQUENCE SHALL SATISFY ALL NASA LANGLEY TEST SAFETY REQUIREMENTS AND THE CONTRACTOR ENGINE OPERATING LIMITS. FINAL APPROVAL WILL BE GIVEN BY THE NASA TASK MONITOR (TM) VIA EMAIL TO THE CONTRACTORS PROJECT MANAGER (PM). THE CONTRACTOR SHALL UPDATE AND MAINTAIN THE DETAILED INTEGRATED RUN SEQUENCE DOCUMENT (IRSD) FOR WEEKLY REVIEW DURING THE TELECONS. (DELIVERABLE ITEM 4.3). THE INITIAL IRSD DRAFT WILL BE PROVIDED TO THE CONTRACTOR AS SPECIFIED UNDER GOVERNMENT FURNISHED INFORMATION (GFI) SOW 5.1. 3.1.2 THE CONTRACTOR SHALL DEVELOP, AT A MINIMUM, THE FOLLOWING FACILITY SYSTEMS VERIFICATION CHECK LISTS (DELIVERABLE ITEM 4.4): - ENGINE FUEL DELIVERY SYSTEM. - WATER COOLING SYSTEM PERFORMANCE. - SILANE IGNITOR GAS SYSTEM PERFORMANCE. - ANGLE OF ATTACH/MODEL ELEVATOR COORDINATION. - NORMAL STOP SEQUENCE OF EVENTS. - ABNORMAL STOP SEQUENCE
Dates and value
- Award date
- Signed on Mar 7, 2011
- Potential end of performance
- Jun 28, 2012
- Current value
- $197,974Base and exercised options
- Potential value (if all options are exercised)
- $197,974
- Parent contract vehicle
- NNL10AA04B (IDC, multiple award) — 10 orders recorded under it
Obligations by fiscal year of action
- FY2018: -$1,009 (de-obligation)
- FY2012: $49,128
- FY2011: $148,846
Total across 3 fiscal years: $196,965
Net de-obligation in that fiscal year (obligations withdrawn).
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Aug 11, 2018. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
Self-reported at the time of the action.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- NASA LANGLEY RESEARCH CENTER
- Funded by
- National Aeronautics and Space Administration
- NASA LANGLEY RESEARCH CENTER
- Funded from
- Aeronautics (DIRECT)Program activities080-0126Federal accounts (agency financial reports)
Place of performance
- Place of performance
- Beltsville, Prince Georges County, Maryland 20705-1971
- Congressional district (place of performance)
- MD-04As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- AR11R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (BASIC RESEARCH) (research and development)
Competition
- Extent competed
- Full and open competitionA
- Solicitation procedures
- Subject to multiple award fair opportunityMAFO
- Set-aside
- No set-aside used
- Contract pricing
- Cost plus fixed feeU
- Offers received
- 1
Contract details
- Subcontracting plan
- Plan required - incentive not includedC
- Major program
- Smaaart
- Commercial procedures
- Commercial item procedures not usedD
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Multi-year contract
- Yes
- Performance-based service acquisition
- Yes - service where PBA is used.Y
Transaction history
Modification history
- Base award
- Mar 7, 2011Base obligation at award: $148,846
- Latest action
- Aug 11, 2018 — Other administrative actionModification 3; obligation change -$1,009; administrative: no change in scope or value
- Latest substantive action
- May 31, 2012 — Supplemental agreement (within scope)Modification 2; obligation change +$49,128
- Actions by type
- Base award1
- Other administrative action2
- Supplemental agreement (within scope)1
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Local area set-aside
- No
- Simplified procedures for commercial items
- No
- A-76 (FAIR Act) action
- No
Pricing and financing
- Paid by purchase card
- No
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
- Clinger-Cohen Act planning (IT)
- No
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Country of product or service origin
- United statesUSA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- Delivery orderC
- Parent vehicle type
- IDCB
- Parent vehicle: multiple or single award
- Multiple awardM
- Parent vehicle agency
- National Aeronautics and Space Administration8000
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- 80LARC
- Transactions recorded under this award key
- 4
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- 80LARC
- Treasury accounts
- 080-2012/2013-0126-000
- Object classes
- 25.1: Advisory and assistance services