Delivery order NNL12AD04TATK SPACE SYSTEMS LLC
Overview
Award facts
- Net obligations
- $2.54M
- $2,541,136of $2.55M potential value
- Period of performance
- Sep 28, 2012 to Nov 28, 2014
- Ended
- Modifications
- 10
- Latest action Aug 5, 2020
- Contract type
- Delivery order
- PIID NNL12AD04T
Description of requirement
IGF::OT::IGF OTHER FUNCTIONS - STATEMENT OF WORK (SOW) SMAAART TASK TITLE: AHSTF ENHANCED MIXING RESEARCH PROJECT 1.0 INTRODUCTION/BACKGROUND: THE HYPERSONIC AIRBREATHING PROPULSION BRANCH (HAPB) AT NASA LANGLEY RESEARCH CENTER (LARC) RECENTLY INITIATED THE AHSTF ENHANCED MIXING RESEARCH PROJECT WHICH SEEKS TO MEET FUTURE HYPERSONIC RESEARCH REQUIREMENTS. THE PURPOSE OF THIS PROJECT IS TO INVESTIGATE AND DEVELOP FLIGHT SIMULATION CAPABILITY AND IMPROVE THE ABILITY TO ASSESS FLOW QUALITY FOR HYPERSONIC RESEARCH. IMPROVED DIAGNOSTICS AND MEASUREMENT SYSTEMS ARE NEEDED TO ROUTINELY QUANTIFY THE FLOW PROPERTIES DELIVERED TO THE TEST ARTICLES. THIS PROJECT ALSO INCLUDES INVESTIGATING FUEL INJECTION AND MIXING FOR SCRAMJET ENGINES TO ENHANCE OUR UNDERSTANDING OF SCRAMJET FUEL INJECTION AND MIXING DEVICES IN A CONTROLLED TEST ENVIRONMENT TO EVALUATE INNOVATIVE CONCEPTS. SINCE THE SCRAMJET MIXING AND COMBUSTION PROCESSES ARE KNOWN TO HAVE THE GREATEST POTENTIAL FOR IMPROVING SCRAMJET ENGINE PERFORMANCE AND EFFICIENCY, THIS PROJECT SEEKS TO PROVIDE A MAJOR STEP TOWARDS DEVELOPING PRACTICAL PROPULSION SYSTEMS FOR AEROSPACE VEHICLES OPERATING IN THE HYPERSONIC SPEED REGIME. THE AHSTF ENHANCED MIXING RESEARCH PROJECT, SCHEDULED TO BE IMPLEMENTED IN FISCAL YEAR (FY) 13, INVOLVES THE RESEARCH, DEVELOPMENT, AND INSTALLATION OF TWO NEW FACILITY NOZZLES (I.E., MACH 3.5 AND MACH 2.2) TO DEMONSTRATE MACH 2.5 TO 4.0 FLIGHT SIMULATED CONDITIONS. 2.0 SCOPE AND OBJECTIVE(S): THE SCOPE OF THIS TASK ORDER IS TO RESEARCH, PROCURE, AND DEVELOP THE AHSTF WITH MAJOR HARDWARE COMPONENTS NECESSARY TO SUCCESSFULLY COMPLETE THE AHSTF ENHANCED MIXING PROJECT. THE OBJECTIVES OF THIS TASK ORDER ARE TO OBTAIN: 1) PROCURE FACILITY TEST HARDWARE. 2) TEST AND EVALUATE VARIOUS FUEL INJECTION AND MIXING DEVICES IN THE AHSTF. 3.0 DESCRIPTION OF THE WORK/TASKS TO BE PERFORMED: THE CONTACTOR SHALL DESIGN, ANALYZE, AND FABRICATE THE FOLLOWING COMPONENT(S): 1) A MACH 3.5 FACILITY NOZZLE. 2) A MACH 2.2 FACILITY NOZZLE. 3) A RAKE TRAVERSE SYSTEM. 4) THREE (3) IN-STREAM RAKES FOR THE FACILITY NOZZLE EXIT. 5) THREE (3) IN-STREAM RAKES FOR THE MIXING TEST APPARATUS. 6) A GAS COMPOSITION MEASUREMENT SYSTEM. 7) FOUR (4) FACILITY NOZZLE JET STRETCHERS. NOTE: LARC WILL BE RESPONSIBLE FOR THE INSTALLATION AND INTEGRATION OF THIS HARDWARE INTO THE AHSFT. A CAD IMAGE OF THE AHSTF, WITH ITS MIXING TEST APPARATUS INSTALLED IN THE TEST CABIN IS SHOWN IN SOW 8.1. THE RAKE TRAVERSE SYSTEM AND IN-STREAM RAKES WILL BE USED TO SURVEY THE FLOW OVER A RANGE OF AXIAL LOCATIONS ALONG THE TEST CABIN FROM THE NOZZLE EXIT TO THE END OF THE MIXING REGION. GENERAL REQUIREMENTS: A) ALL HARDWARE SHALL INTEGRATE/INSTALL WITHIN THE AHSTF. B) ALL HARDWARE SHALL INCORPORATE DESIGN FEATURES THAT REDUCE MAINTENANCE TIME. DESIGN CHOICES THAT ALLOW DAY SHIFT CONFIGURATION CHANGES ARE PREFERRED AS LONG AS THEY DO NOT COMPROMISE THE FUNCTIONALITY OR DESIGN LIFE. C) ALL FLUID, ELECTRICAL, AND INSTRUMENTATION LINES SHALL INCORPORATE MATCHING CONNECTION TO THE ADJOINING FACILITY INTERFACE. D) ALL HARDWARE SHALL COMPLY WITH LANGLEY PROCEDURAL REQUIREMENT (LPR) 1710.15 ENTITLED WIND TUNNEL MODEL SYSTEMS CRITERIA (GFI 5.1). THE CONTRACTOR SHALL PERFORM THE FOLLOWING TASKS: 3.1 MACH 3.5 AND MACH 2.2 FACILITY NOZZLES THE GOVERNMENT HAS DEVELOPED THE REQUIREMENTS FOR THE FACILITY NOZZLES WITH THE INTENT TO MINIMIZE HARDWARE DESIGN AND FABRICATION COSTS BY LIMITING THE MAXIMUM OPERATING TEMPERATURE TO LEVELS CONSISTENT WITH UN-COOLED HARDWARE. THE DESIGN SHALL TAKE ADVANTAGE OF MATERIALS AND THERMAL MANAGEMENT THAT PROVIDES THE BEST TRADE-OFF BETWEEN COST AND DIMENSIONAL TOLERANCE. 3.1.1 THE CONTRACTOR SHALL DESIGN, ANALYZE, AND DELIVER ENGINEERING DRAWINGS FOR A MACH 3.5 FACILITY NOZZLE AND A MACH 2.2 FACILITY NOZZLE WHICH DELIVER FLOW TO THE TEST CABIN/EXPERIMENT HARDWARE. A. EACH NOZZLE SHALL MATE WITH EX
Dates and value
- Award date
- Signed on Sep 28, 2012
- Potential end of performance
- Nov 27, 2014
- Current value
- $2,546,027Base and exercised options
- Potential value (if all options are exercised)
- $2,546,027
- Parent contract vehicle
- NNL10AA04B (IDC, multiple award) — 10 orders recorded under it
Obligations by fiscal year of action
- FY2020: -$4,891 (de-obligation)
- FY2014: $449,235
- FY2013: $1,240,000
- FY2012: $856,792
Total across 4 fiscal years: $2,541,136
Net de-obligation in that fiscal year (obligations withdrawn).
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Aug 5, 2020. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
Self-reported at the time of the action.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- NASA LANGLEY RESEARCH CENTER
- Funded by
- National Aeronautics and Space Administration
- NASA LANGLEY RESEARCH CENTER
- Funded from
- Cross agency support (DIRECT)Program activities080-0122Federal accounts (agency financial reports)
Place of performance
- Place of performance
- Beltsville, Prince Georges County, Maryland 20705-1971
- Congressional district (place of performance)
- MD-04As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- AR11R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (BASIC RESEARCH) (research and development)
Competition
- Extent competed
- Full and open competitionA
- Solicitation procedures
- Subject to multiple award fair opportunityMAFO
- Set-aside
- No set-aside used
- Contract pricing
- Cost plus fixed feeU
- Offers received
- 1
Contract details
- Subcontracting plan
- Plan required - incentive not includedC
- Major program
- Smaaart
- Commercial procedures
- Commercial item procedures not usedD
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Multi-year contract
- Yes
- Performance-based service acquisition
- Yes - service where PBA is used.Y
Transaction history
Modification history
- Base award
- Sep 28, 2012Base obligation at award: $856,792
- Latest action
- Aug 5, 2020 — Other administrative actionModification 10; obligation change -$4,891; administrative: no change in scope or value
- Latest substantive action
- Sep 25, 2014 — Supplemental agreement (within scope)Modification 9; obligation change +$35,366
- Latest funding action
- Dec 3, 2013 — Funding onlyModification 5; obligation change +$313,061; funding only: changes obligations, not scope
- Actions by type
- Base award1
- Supplemental agreement (within scope)5
- Funding only3
- New work added (outside scope)1
- Other administrative action1
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Local area set-aside
- No
- Simplified procedures for commercial items
- No
- A-76 (FAIR Act) action
- No
Pricing and financing
- Paid by purchase card
- No
Socio-economic and policy
- Inherently governmental functions
- Other functionsOT
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
- Clinger-Cohen Act planning (IT)
- No
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Country of product or service origin
- United statesUSA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- Delivery orderC
- Parent vehicle type
- IDCB
- Parent vehicle: multiple or single award
- Multiple awardM
- Parent vehicle agency
- National Aeronautics and Space Administration8000
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- 80LARC
- Transactions recorded under this award key
- 11
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- 80LARC
- Treasury accounts
- 080-2014/2015-0122-000
- Object classes
- 25.5: Research and development contracts
- Disaster or emergency funding (DEFC)
- Q: Not Designated Nonemergency/Emergency/Disaster/Wildfire Suppression