Purchase order NNL15AC67PCADEL, INC.
Overview
Award facts
- Period of performance
- Mar 8, 2016 to Dec 31, 2015
- Ended
- Modifications
- 2
- Latest action Mar 8, 2016
- Contract type
- Purchase order
- PIID NNL15AC67P
Description of requirement
"IGF::OT::IGF" A MULTI-PIXEL DELTA-SIGMA MODULATED LASER DETECTION CIRCUIT REALIZED IN STANDARD COMPLEMENTARY METAL-OXIDE SEMICONDUCTOR (CMOS) PRIMARY TASK THE CONTRACTOR SHALL DESIGN AND MANUFACTURE A DELTA-SIGMA MODULATION (DSM) BASED LASER DETECTION CIRCUIT BASED ON GOVERNMENT-FURNISHED DOCUMENTATION. THIS IS A MID-STAGE DEVELOPMENT EFFORT. THE CONTRACTOR SHALL FINALIZE THE MULTI-CHANNEL MANUFACTURING DESIGN BASED ON THE RESULTS OF PREVIOUS EFFORTS. THE AWARD IS FIXED-PRICE. LONG-TERM GOAL: TO DEVELOP A MULTI-CHANNEL LASER DETECTION CIRCUIT SUITABLE FOR LOW-INTENSITY OPTICAL SOURCES OPERATING IN EXTREME TEMPERATURE AND RADIATION ENVIRONMENTS. IN THE LONG-TERM, THIS DESIGN WILL BE PORTED TO A MORE SOPHISTICATED PROCESS. TO MEET LONG-TERM PROJECT GOALS, THE PREFERRED PARTNER WILL HAVE DEMONSTRABLE EXPERIENCE IN BOTH THE PRESENT DESIGN PROCESS (ON SEMICONDUCTOR C5 CMOS WITH HI-POLY RESISTORS AND DUAL-POLY CAPACITORS) AND THE PROJECTED FUTURE PROCESS (JAZZ SEMICONDUCTOR SBC18 OR SBC35 SIGE CMOS) STATEMENT OF WORK: THE EFFORT INVOLVES THE DEVELOPMENT OF A CMOS INTEGRATED CIRCUIT CONTAINING MULTIPLE COPIES OF THE PRIMARY NETWORK OF A SINGLE-PIXEL DELTA-SIGMA MODULATED LASER DETECTION CIRCUIT. THE GOAL OF THIS EFFORT IS TO DEMONSTRATE THE CAPABILITY OF MULTIPLE CHANNELS TO MEASURE INDEPENDENT SIGNALS WHILE SHARING COMMON ASPECTS OF THE NETWORK SUCH AS BIASING. THE DESIGN WILL BE BASED UPON GOVERNMENT-PROVIDED INFORMATION WITH MODIFICATIONS AS MUTUALLY AGREED UPON DURING THE COURSE OF DEVELOPMENT. THE PROJECT INVOLVES THE DESIGN, ANALYSIS, AND LAYOUT OF AN INTEGRATED CIRCUIT (IC) USING STANDARD CMOS PROCESS TECHNOLOGY. THE VENDOR SHALL PERFORM DESIGN, LAYOUT, SIMULATION, AND POST-MANUFACTURING TESTING OF PERFORMANCE MEASURES OF THE NETWORKS ON THE IC USING DESIGN TOOLS SUITABLE FOR INTEGRATED CIRCUIT DESIGN AND DEVELOPMENT. SUCH TOOLS AT A MINIMUM SHALL INCLUDE CIRCUIT SIMULATION AT THE DEVICE LEVEL, DESIGN-RULE-CHECK (DRC), LAYOUT-VS-SCHEMATIC (LVS), AND PARASITIC EXTRACTION FROM LAYOUT. THESE ARE BASIC AND NECESSARY CAPABILITIES. ADDITIONAL SUB-NETWORKS MAY BE REQUIRED AS INDIVIDUAL TEST PLATFORMS; TYPE AND NUMBER TO BE DETERMINED AND DEFINED DURING DETAILED ANALYSIS PERFORMED BY THE CONTRACTOR. PROPOSALS FOR THE POTENTIAL SUB-NETWORKS ARE TO BE REVIEWED AND APPROVED BY THE GOVERNMENT. ADDITIONAL TESTING WILL BE PERFORMED AT NASA LANGLEY RESEARCH CENTER. THE CONTRACTOR SHALL PACKAGE THE TEST DIE IN STANDARD PLASTIC OR CERAMIC PACKAGES OF A SIZE TO BE DETERMINED AT THE MID-DESIGN REVIEW. THE CONTRACTOR SHALL PERFORM PRIMARY FUNCTIONAL TESTING OF DIE. AMONG THE BASIC TESTS WILL BE OPERATION AT NOMINAL SUPPLY VOLTAGE, NOMINAL SUPPLY CURRENT AT NOMINAL VOLTAGE, TEST-TO-DESTRUCTION OF SUPPLY VOLTAGE RANGE, OPERATION UNDER NOMINAL SUPPLY VOLTAGE RANGE, NOMINAL OUTPUT RESPONSE VS. INPUT STIMULUS, AND CHANNEL-TO-CHANNEL INTERACTION. OTHER TESTS MAY BE SUGGESTED DURING THE DEVELOPMENT PROCESS. THE CONTRACTOR SHALL DESIGN AND FABRICATE THE IC USING THE ON SEMICONDUCTOR C5 MANUFACTURING PROCESS. IT IS SUGGESTED BUT NOT REQUIRED THAT SUCH PROCESSING BE ORGANIZED THROUGH MOSIS TO MAINTAIN COMPATIBILITY WITH THE GOVERNMENT S EFFORTS ON THIS PROJECT. MILESTONES: 1.DESIGN, FABRICATE, AND TEST THE PROTOTYPE ICS BUILT UPON THE ON SEMICONDUCTOR C5 0.5M PROCESS.DESIGN WILL BE READY FOR SUBMISSION TO FOUNDRY ON OR BEFORE THE DATES REQUIRED BY THE FOUNDRY BUTNO LATER THAN DEC 31, 20151. 2.COMPILATION OF TEST RESULTS SHALL INCLUDE CRITIQUE OF AS-TESTED DESIGN AND SUGGESTIONS FOR FUTUREDESIGN IMPROVEMENTS. DELIVERABLES: 1.PROJECTED CONTRACTOR SCHEDULE OF EVENTS AND DEVELOPMENT ACTIVITIES 2.PROGRESS REPORTS PRELIMINARY TO EACH NASA SITE PARTICIPATION. ANTICIPATED TIME FRAMES INCLUDE TBD (KICKOFF), TBD (MID-TERM DESIGN REVIEW), TBD (FINAL DESIGN REVIEW), TBD (TEST REVIEW MEETING) 3.DESIGN FILES FOR ALL NETWORK DESIGNS INCLUDING BUT NOT LIMITED TO: A.DESIGN ANALYSES, B.SIMULATION CIRCUITS AND MODEL LISTINGS, C.LAYOUT DESIGN
Dates and value
- Award date
- Signed on May 5, 2015
- Potential end of performance
- Dec 30, 2015
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Mar 8, 2016. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- LANGLEY RESEARCH CENTER
- Funded by
- National Aeronautics and Space Administration
- LANGLEY RESEARCH CENTER
Place of performance
- Place of performance
- Tucson, Pima County, Arizona 85746-9527
- Congressional district (place of performance)
- AZ-07As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- AZ11R&D- OTHER RESEARCH AND DEVELOPMENT (BASIC RESEARCH) (research and development)
Competition
- Extent competed
- Competed under SAPF
- Solicitation procedures
- Simplified acquisitionSP1
- Set-aside
- No set-aside used
- Contract pricing
- Firm fixed priceJ
- Offers received
- 1
Solicitation and notices
- Solicitation ID
- NNL15546336Q
- Notices
- Award Notice posted May 5, 2015
- Combined Synopsis/Solicitation posted Apr 1, 2015
- Combined Synopsis/Solicitation posted Apr 1, 2015
- Combined Synopsis/Solicitation posted Apr 1, 2015
Contract details
- Subcontracting plan
- Plan not requiredB
- Commercial procedures
- Commercial itemA
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Performance-based service acquisition
- Yes - service where PBA is used.Y
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- May 5, 2015Base obligation at award: $65,000
- Latest action
- Mar 8, 2016 — Other administrative actionModification 2; obligation change -$6,500; administrative: no change in scope or value
- Latest substantive action
- Aug 13, 2015 — Supplemental agreement (within scope)Modification 1; obligation change +$15,000
- Actions by type
- Base award1
- Supplemental agreement (within scope)1
- Other administrative action1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Local area set-aside
- No
- Synopsized publicly (SAM.gov / FedBizOpps)
- Yes
- Simplified procedures for commercial items
- No
- A-76 (FAIR Act) action
- No
Pricing and financing
- Paid by purchase card
- No
- Latest action: change in base and exercised options
- -$6,500
- Latest action: change in base and all options
- -$6,500
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
- Clinger-Cohen Act planning (IT)
- No
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Country of product or service origin
- United statesUSA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- Purchase orderB
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- LARC0
- Transactions recorded under this award key
- 3
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- LARC0