Purchase order NNL15AF61PFREQUENCY MANAGEMENT INTERNATIONAL, INC
Overview
Award facts
- Period of performance
- May 23, 2016 to Mar 1, 2016
- Ended
- Modifications
- 1
- Latest action May 23, 2016
- Contract type
- Purchase order
- PIID NNL15AF61P
Description of requirement
IGF::OT::IGF SBIR (SMALL BUSINESS INNOVATIVE RESEARCH) PHASE III - EXTREME ENVIRONMENTS TECHNOLOGY - EXTREME ENVIRONMENT CIRCUIT BLOCKS FOR SPACECRAFT POWER&PROPULSION SYSTEM&OTHER HIGH RELIABILITY APPLICATIONS - THE PURPOSE AND OBJECTIVE OF THE WORK TO BE PERFORMED IS TO DESIGN SINGLE-EVENT EFFECT (SEE) AND TOTAL IONIZING DOSE (TID) HARDENED SILICON CARBIDE POWER METAL-OXIDE-SEMICONDUCTOR FIELD EFFECT TRANSISTORS (SIC POWER MOSFETS). NEXT GENERATION AEROSPACE POWER SYSTEMS INCLUDING THE HIGH-TEMPERATURE BOOST POWER PROPULSION UNIT DEMAND HIGH-EFFICIENCY POWER TECHNOLOGIES TO ACHIEVE LOWER COST, HIGHER EFFICIENCY, AND EXPANDED CAPABILITY. SILICON CARBIDE POWER DEVICE TECHNOLOGY OFFERS HIGHER BREAKDOWN VOLTAGES COMBINED WITH LOWER LOSSES AND OPERABILITY WITHIN A BROADER TEMPERATURE RANGE AS COMPARED TO SILICON TECHNOLOGY. THE HIGH TOLERANCE OF COMMERCIAL SIC COMPONENTS TO TOTAL IONIZING DOSE (TID) HAS ENHANCED THE ALLURE OF SIC TECHNOLOGY IN THE AEROSPACE COMMUNITY. TO DATE, HOWEVER, SIC POWER DEVICES HAVE NOT PERFORMED WELL UNDER HEAVY-ION IRRADIATION, SUFFERING DEGRADATION AND CATASTROPHIC SEE. THIS SUSCEPTIBILITY TO SEE SEVERELY LIMITS OR PREVENTS THE USE OF THIS TECHNOLOGY FOR SPACE APPLICATIONS. CHRONOS TECHNOLOGY AND ITS PARTNERS HAVE PREVIOUSLY ENGAGED IN EXTENSIVE WORK IN ADVANCING THE STATE OF THE ART IN SIC SEMICONDUCTOR PRECISION PROCESS DEVELOPMENT AND FABRICATION TECHNIQUES AND ARE THUS WELL SUITED TO UNDERTAKE THE WORK REQUIRED. TCAD SIMULATIONS TO DEFINE WAFER SPLITS AND ENSURE THAT THE NEW DESIGNS OF THE POWER MOSDWTS MEET THE ELECTRICAL AND RADIATION SPECIFICATIONS. THIS WORK SHALL IN PART INCLUDE SIMULATION OF HEAVY-ION STRIKES AND THE ANALYSIS OF IMPACT TO ELECTRIC FIELDS, HEATING , ETC. TRADEOFFS AND ALTERNATIVES OF SIC POWER MOSFET PACKAGING OPTION WITH THE HTB PPU PROJECT TEAM AND IMPLEMENT THE PACKAGE PER THE APPLICATION REQUIREMENTS AND DEVELOP THE CUSTOM PACKAGING AND A GATE DRIVER WITHIN A SAME MICROELECTRONIC PACKAGE HOUSING HTP ( HIGH TEMPERATURE BOOST) POWER PROCESS UNIT (PPU) WILL SELECT THE GATE DRIVER. DESIGN AND DEVELOP THE SAME HOUSING PACKAGING FOR THE MOSFETS AND GATE DRIVER WITH INTEGRATION AND TESTING PLAN. MOSFET DESIGNS SHALL BE LAID OUT USING A CAD TOOL AND MASKS GENERATED FOR THE FABRICATION. DISCUSSIONS WILL BE HELD AS TO ANY PREFERENCE OR DECISIONS ON THE QUANTITY AND CONFIGURATION OF SAID DEVICES IN TERMS OF BARE DI VS. PACKAGE. DELIVER FINAL REPORT TO NASA. PRESENTATION TO THE PROJECT TEAM THROUGH A WEB-X TELECONFERENCE SUMMARIZING THE RESULTS OF THE DESCRIBED TASKS.
Dates and value
- Award date
- Signed on Sep 28, 2015
- Potential end of performance
- Feb 29, 2016
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded May 23, 2016. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- NASA LANGLEY RESEARCH CENTER
- Funded by
- National Aeronautics and Space Administration
- NASA LANGLEY RESEARCH CENTER
Place of performance
- Place of performance
- Huntington Beach, Orange County, California 92649-1245
- Congressional district (place of performance)
- CA-47As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- AR11R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (BASIC RESEARCH) (research and development)
Competition
- Extent competed
- Full and open competition after exclusion of sourcesD
- Solicitation procedures
- Negotiated proposal/quoteNP
- Set-aside
- Small business set aside - totalSBA
- Contract pricing
- Firm fixed priceJ
- Offers received
- 2
Contract details
- Subcontracting plan
- Plan not requiredB
- Commercial procedures
- Commercial itemA
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Performance-based service acquisition
- Yes - service where PBA is used.Y
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Sep 28, 2015Base obligation at award: $250,000
- Latest action
- May 23, 2016 — Other administrative actionModification 1; obligation change -$1; administrative: no change in scope or value
- Actions by type
- Base award1
- Other administrative action1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Local area set-aside
- No
- Synopsized publicly (SAM.gov / FedBizOpps)
- No
- Simplified procedures for commercial items
- No
- A-76 (FAIR Act) action
- No
Pricing and financing
- Paid by purchase card
- No
- Latest action: change in base and exercised options
- -$1
- Latest action: change in base and all options
- -$1
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
- Clinger-Cohen Act planning (IT)
- No
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Country of product or service origin
- United statesUSA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- Purchase orderB
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- 80LARC
- Transactions recorded under this award key
- 2
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- 80LARC