Definitive contract NNM07AB03CTHE BOEING COMPANY
Overview
Award facts
- Net obligations
- $10.51B
- $10,509,828,993of $10.74B potential value
- Period of performance
- Sep 1, 2007 to Dec 31, 2028
- Ends in about 2 years
- Modifications
- 529
- Latest action Nov 5, 2026
- Contract type
- Definitive contract
- PIID NNM07AB03C
Description of requirement
PROVIDE DEVELOPMENTAL HARDWARE AND TEST ARTICLES, AND MANUFACTURE AND ASSEMBLE ARES I UPPER STAGES. THE UPPER STAGE (US) ELEMENT IS AN INTEGRAL PART OF THE ARES I LAUNCH VEHICLE AND PROVIDES THE SECOND STAGE OF FLIGHT. THE US ELEMENT IS RESPONSIBLE FOR THE ROLL CONTROL DURING THE FIRST STAGE BURN AND SEPARATION; AND WILL PROVIDE THE GUIDANCE AND NAVIGATION, COMMAND AND DATA HANDLING, AND OTHER AVIONICS FUNCTIONS FOR THE ARES I DURING ALL PHASES OF THE ASCENT FLIGHT. THE US ELEMENT IS A NEW DESIGN THAT EMPHASIZES SAFETY, OPERABILITY, AND MINIMUM LIFE CYCLE COST. THE OVERALL DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E), PRODUCTION, AND SUSTAINING ENGINEERING EFFORTS INCLUDE ACTIVITIES PERFORMED BY THREE ORGANIZATIONS; THE NASA DESIGN TEAM (NDT), THE UPPER STAGE PRODUCTION CONTRACTOR (USPC) AND THE INSTRUMENT UNIT PRODUCTION CONTRACTOR (IUPC). FOR CLARITY, THE USPC WILL BE REFERRED TO AS THE CONTRACTOR THROUGHOUT THIS DOCUMENT. NASA IS RESPONSIBLE FOR THE INTEGRATION OF THE PRIMARY ELEMENTS OF THE ARES I LAUNCH VEHICLE INCLUDING: THE FIRST STAGE, US INCLUDING INSTRUMENT UNIT (IU), AND US ENGINE; AND WILL ALSO INTEGRATE THE ARES I LAUNCH VEHICLE AT THE LAUNCH SITE. NASA IS RESPONSIBLE FOR THE DDT&E, INCLUDING TECHNICAL AND PROGRAMMATIC INTEGRATION OF THE US SUBSYSTEMS AND GOVERNMENT-FURNISHED PROPERTY. NASA WILL LEAD THE EFFORT TO DEVELOP THE REQUIREMENTS AND SPECIFICATIONS OF THE US ELEMENT, THE DEVELOPMENT PLAN AND TESTING REQUIREMENTS, AND ALL DESIGN DOCUMENTATION, INITIAL MANUFACTURING AND ASSEMBLY PROCESS PLANNING, LOGISTICS PLANNING, AND OPERATIONS SUPPORT PLANNING. DEVELOPMENT, QUALIFICATION, AND ACCEPTANCE TESTING WILL BE CONDUCTED BY NASA AND THE CONTRACTOR TO SATISFY REQUIREMENTS AND FOR RISK MITIGATION. NASA IS RESPONSIBLE FOR THE OVERALL UPPER STAGE VERIFICATION AND VALIDATION PROCESS AND WILL REQUIRE SUPPORT FROM THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR THE MANUFACTURE AND ASSEMBLY OF THE UPPER STAGE TEST FLIGHT AND OPERATIONAL UPPER STAGE UNITS INCLUDING THE INSTALLATION OF UPPER STAGE INSTRUMENT UNIT, THE GOVERNMENT-FURNISHED US ENGINE, BOOSTER SEPARATION MOTORS, AND OTHER GOVERNMENT-FURNISHED PROPERTY. A DESCRIPTION OF THE NASA MANAGED AND PERFORMED EFFORTS IS CONTAINED IN THE US WORK PACKAGES AND WILL BE MADE AVAILABLE TO THE CONTRACTOR TO ENSURE THEIR UNDERSTANDING OF THE ROLES AND RESPONSIBILITIES OF THE NDT, IUPC, AND CONTRACTOR DURING THE DESIGN, DEVELOPMENT, AND OPERATION OF THE US ELEMENT. THE US CONCEPTUAL DESIGN DESCRIBED IN THE USO-CLV-SE-25704 US DESIGN DEFINITION DOCUMENT (DDD) IS THE BASELINE DESIGN FOR THIS CONTRACT. THE CONTRACTORS EARLY ROLE WILL BE TO PROVIDE PRODUCIBILITY ENGINEERING SUPPORT TO NASA VIA THE ESTABLISHED US OFFICE STRUCTURE AND TO PROVIDE INPUTS INTO THE FINAL DESIGN CONFIGURATION, SPECIFICATIONS, AND STANDARDS. NASA WILL TRANSITION THE MANUFACTURING AND ASSEMBLY, LOGISTICS SUPPORT INFRASTRUCTURE, CONFIGURATION MANAGEMENT, AND THE SUSTAINING ENGINEERING FUNCTIONS TO THE CONTRACTOR AT THE KEY POINTS DURING THE DEVELOPMENT AND IMPLEMENTATION OF THE PROGRAM CURRENTLY PLANNED TO OCCUR NO LATER THAN 90 DAYS AFTER THE COMPLETION OF THE FOLLOWING MAJOR MILESTONES: MANUFACTURING AND ASSEMBLY US PRELIMINARY DESIGN REVIEW (PDR) LOGISTICS SUPPORT INFRASTRUCTURE US PDR CONFIGURATION MANAGEMENT US CRITICAL DESIGN REVIEW CDR) SUSTAINING ENGINEERING US DESIGN CERTIFICATION REVIEW (DCR) AFTER THE COMPLETION OF AN ORDERLY TRANSITION OF ROLES AND RESPONSIBILITIES TO THE CONTRACTOR, NASA WILL ASSUME AN INSIGHT ROLE INTO THE CONTRACTORS PRODUCTION, SUSTAINING ENGINEERING, AND OPERATIONS SUPPORT OF THE ARES I US TEST PROGRAM AND FLIGHT HARDWARE. AFTER DCR, THE CONTRACTOR WILL BE RESPONSIBLE FOR SUSTAINING ENGINEERING PER SOW SECTION 4.7, AS NECESSARY TO MAINTAIN AND SUPPORT THE US CONFIGURATION AND FOR PRODUCTION AND OPERATIONS SUPPORT.
Dates and value
- Award date
- Earliest action recorded: Oct 16, 2007 (the base award is not in the records GovChime holds)
- Current value
- $10,726,778,710Base and exercised options
- Potential value (if all options are exercised)
- $10,735,265,866
Obligations by fiscal year of action
- FY2026: $249,814,991
- FY2025: $499,088,231
- FY2024: $481,874,377
- FY2023: $651,567,957
- FY2022: $836,994,384
- FY2021: $878,490,977
- FY2020: $772,788,793
- FY2019: $803,164,680
Show all 19 yearsEarlier years (FY2008–FY2018)
- FY2018: $897,250,000
- FY2017: $799,608,064
- FY2016: $828,014,284
- FY2015: $647,288,050
- FY2014: $644,183,414
- FY2013: $594,226,985
- FY2012: $539,238,658
- FY2011: $159,900,000
- FY2010: $143,473,799
- FY2009: $36,700,000
- FY2008: $46,161,349
Total across 19 fiscal years: $10,509,828,993
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Nov 5, 2026. View on USAspending · Recipient on SAM.gov
Recipient
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- NASA MARSHALL SPACE FLIGHT CENTER
- Funded by
- National Aeronautics and Space Administration
- NASA MARSHALL SPACE FLIGHT CENTER
Place of performance
- Place of performance
- Huntsville, Madison County, Alabama 35824-3001
- Congressional district (place of performance)
- AL-05As reported at the time of the action
Classification and competition
Classification
Competition
- Extent competed
- Full and open competitionA
- Solicitation procedures
- Negotiated proposal/quoteNP
- Set-aside
- No set-aside used
- Contract pricing
- Cost plus award feeR
- Offers received
- 1
Solicitation and notices
- Solicitation ID
- NNM07181505R(as reported)
Contract details
- Subcontracting plan
- Plan required - incentive not includedC
- Cost Accounting Standards clause
- Yes - CAS clause includedY
- Service Contract Act labor standards
- No
- Commercial procedures
- Commercial products/services procedures not usedD
- Government-furnished property
- Transaction uses GFE/GFPY
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Multi-year contract
- No
- Performance-based service acquisition
- Yes - service where PBA is used.Y
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Latest action
- Nov 5, 2026 — Other administrative actionModification 531; administrative: no change in scope or value
- Latest substantive action
- May 28, 2026 — Supplemental agreement (within scope)Modification 520; obligation change +$1,500,000
- Latest funding action
- Aug 21, 2026 — Funding onlyModification 529; obligation change -$388,944; funding only: changes obligations, not scope
- Actions by type
- Supplemental agreement (within scope)226
- Funding only143
- Other administrative action100
- Change order54
- Change order definitized6
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Local area set-aside
- No
- Synopsized publicly (SAM.gov / FedBizOpps)
- Yes
- Simplified procedures for commercial items
- No
- A-76 (FAIR Act) action
- No
Pricing and financing
- Paid by purchase card
- No
- Latest action: change in base and exercised options
- $4,000,000
- Latest action: change in base and all options
- $4,000,000
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
- Clinger-Cohen Act planning (IT)
- No
- Walsh-Healey Act (materials and supplies)
- Yes
Place and origin
- Country of product or service origin
- United statesUSA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- Definitive contractD
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- 80MSFC
- Transactions recorded under this award key
- 529
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- 80MSFC