GovChime
AWARDDCASmall business

Dca NNM10AA22CKT ENGINEERING CORPORATION

Overview

Award facts

Period of performance
Feb 22, 2012 to Feb 22, 2012
Ended
Modifications
4
Latest action Feb 22, 2012
Contract type
Dca
PIID NNM10AA22C

Description of requirement

PHASE III SBIR: RADIALLY SEGMENTED LAUNCH VEHICLE OXYGEN / METHANE TECHNOLOGY MATURATION PROGRAM THE CONTRACTOR'S EFFORT DESCRIBED IN THE PROPOSAL INVOLVES FOUR MAJOR TASKS. THESE TASKS ARE: 1. CATALYTICALLY INITIATED COMBUSTOR DEVELOPMENT. THE CATALYTICALLY INITIATED COMBUSTOR (CIC) CONCEPT WAS CONCEIVED BY KT ENGINEERING UNDER AND INDEPENDENT RESEARCH AND DEVELOPMENT (IR&D) PROGRAM AND REFINED UNDER SBIR PHASE II CONTRACT F29601-02-C-0010 WITH AFRL AND NASA SBIR PHASE III CONTRACT NNM09AA33C. THE PROPOSED TASK I ACTIVITIES, WITHIN THIS NASA SBIR PHASE III PROGRAM, WILL CONTINUE TO RETIRE TECHNICAL RISK ASSOCIATED WITH CONCEPT AND RAISE THE NASA TRL. THE EFFORT WILL REFINE THE CIC DESIGN TO ADDITIONAL SEA LEVEL TESTING USING GASEOUS PROPELLANTS. THIS ADDITIONAL TESTING IS REQUIRED TO DEMONSTRATE CIC OPERATION UNDER HIGH FLOW, HIGH CHAMBER PRESSURE CONDITIONS INCLUDING THE USE OF ABLATIVE CHAMBERS IN CONJUNCTION WITH HIGHER MIXTURE RATIOS TO REDUCE RISK ASSOCIATED WITH THE USE OF THE CIC IN A REACTION CONTROL SYSTEM APPLICATION. 2. HIGHLY RELIABLE, ROCKET ENGINE INJECTOR FABRICATION. KT ENGINEERING INVESTIGATED THE USE OF INVESTMENT CASTING TO PRODUCE A NEAR-NET INJECTOR BODY FOR A LO2/LCH4 ROCKET ENGINE UNDER SBIR PHASE II CONTRACT F29601-02-C-0010 WITH AFRL. THE FOCUS OF THIS EFFORT WAS TO SIGNIFICANTLY LOWER RECURRING COST BY REDUCING MACHINING TIME AND RAW MATERIAL REQUIREMENTS. HOWEVER, THE AFRL EFFORT ALSO IDENTIFIED THE NEED FOR A STRUCTURED ENGINEERING INVESTIGATION TO IDENTIFY THE OPTIMAL METHODS FOR PRODUCING THE DISPOSABLE MOLDS, REMOVING THE CERAMIC CRES USED TO CREATE THE INTERNAL RING MANIFOLDS, AND NON-DESTRUCTIVE EVALUATION OF THE CONTRACT NNM09AA33C THROUGH THE DEVELOPMENT OF DESIGNS, TOOLS, MANUFACTURING PROCESSES, AND THE CASTING OF SIMPLIFIED INJECTOR PROCESS PATHFINDERS. THE RESULTS FROM THE NASA SBIR PHASE III CONTINUE TO INDICATE THAT AN INTEGRAL-FACE, CAST INJECTOR IS FEASIBLE. THE PROPOSED TASK 2 ACTIVITY IS THE NEXT LOGICAL STEP TO REDUCE RISK ASSOCIATED WITH THIS TECHNOLOGY BY DEMONSTRATING ITS UTILITY ON A MORE COMPLEX INJECTOR PROTOTYPE THAT MORE CLOSELY REPRESENTS THE SIZE, SHAPE, AND GEOMETRY OF A FLIGHT WEIGHT INJECTOR. 3. PRESSURIZATION SYSTEM DEMONSTRATION. THE RSVL USES AN INNOVATIVE, DISTRIBUTED PRESSURIZATION SYSTEM TO PROVIDE INERT GAS FOR PURGES, VALVE ACTUATION, AND TANK PRESSURIZATION DURING FLIGHT. THE APPROACH PROMISES TO BE MORE RELIABLE, LESS COSTLY, AND HIGHER PERFORMING THAN A CONVENTIONAL BLOW-DOWN PRESSURIZATION SYSTEM FOR A PRESSURE-FED VEHICLE. UNDER THROUGH RIGOROUS ENGINEERING MODELING AND LIMITED BENCH-TOP TESTING. THE NEXT LOGICAL STEP, TASK 3 OF THIS PROPOSAL, IS TO INCREASE THE RRL AND VALIDATE THE APPROACH THROUGH COMPONENT AND SYSTEM LEVEL DEVELOPMENT AT PRESSURES AND FLOW RATES CONSISTENT WITH THE REQUIREMENTS FOR THE RSLV. 4. ENGINE MODULE TESTING. EXPERIENCE HAS SHOWN THAT PROPULSION SYSTEMS COMPONENTS MUST ULTIMATELY BE INTEGRATED INTO A COMPLETE ENGINE SYSTEM AND RIGOROUSLY TESTED UNDER ALL ANTICIPATED SERVICE ENVIRONMENTS AND CONDITIONS. KT ENGINEERING HAS DEVELOPED AND DEMONSTRATED A NUMBER OF COMPONENT TECHNOLOGIES APPLICABLE TO THE RSLV PROPULSION SYSTEM. THE NEXT CRITICAL STEP IS TO DEMONSTRATE THESE TECHNOLOGIES INTEGRATED INTO AN OPERATIONAL ENGINE MODULE. KT ENGINEERING DEVELOPED THE DESIGN FOR A FLIGHT WEIGHT RSLV ENGINE MODULE UNDER SBIR PHASE III CONTRACT FA9453-08-C-0171 WITH AFRL. A PROTOTYPE ENGINE MODULE WAS PARTIALLY FABRICATED, INTEGRATED, AND TESTED BEFORE THE CONTRACT ENDED. UNDER TASK 4 OF THIS PROPOSAL, KT ENGINEERING WILL COMPLETE THE ENGINE MODULE, INTEGRATE THE UPDATED CATALYTIC IGNITER AND RCS THRUSTER DESIGNS, UPGRADE THE INJECTOR, PRESSURIZATION AND FEED SYSTEMS BASED ON LESSONS LEARNED, AND PERFORM TESTING OF THE ENGINE ON A MODULAR TEST.

Dates and value

Award date
Signed on May 19, 2010
Potential end of performance
Feb 21, 2012

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Feb 22, 2012. View on USAspending · Recipient on SAM.gov

Recipient

LocationMADISON, AL
UEID48LRKKN8NQ9
Business sizeSmall businessSize at award, per the contracting officer

Business types and certifications

For-profit organizationCorporation (not tax-exempt)

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. MARSHALL SPACE FLIGHT CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. MARSHALL SPACE FLIGHT CENTER

Place of performance

Place of performance
Madison, Alabama 35758-7552
Congressional district (place of performance)
AL-05As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Full and open competition after exclusion of sourcesD
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
Small business set aside - totalSBA
Contract pricing
Firm fixed priceJ
Offers received
1

Solicitation and notices

Solicitation ID
NNM10341800R-1(as reported)

Contract details

Subcontracting plan
Plan not requiredB
Cost Accounting Standards clause
Not applicable exempt from CASX
Certified cost or pricing data
Yes
Service Contract Act labor standards
No
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Multi-year contract
No
Performance-based service acquisition
No - service where PBA is not used.N

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
May 19, 2010Base obligation at award: $1,000,000
Latest action
Feb 22, 2012 — CloseoutModification 4; administrative: no change in scope or value
Latest substantive action
Jul 1, 2010 — Change orderModification 1
Actions by type
  • Base award1
  • Other administrative action2
  • Change order1
  • Closeout1
5 actions recorded, May 19, 2010 to Feb 22, 2012; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Synopsized publicly (SAM.gov / FedBizOpps)
No
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability incluC
EPA-designated product
Not requiredE
Research program (SBIR/STTR)
Small business innovation research program phase iii actionSR3
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
DcaD
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
MSFC0
Transactions recorded under this award key
5

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
MSFC0