GovChime
AWARDDCASmall business

Dca NNX09CB71CACCUDYNE SYSTEMS, INC.

Overview

Award facts

Period of performance
Jun 24, 2011 to Sep 30, 2011
Ended
Modifications
7
Latest action Jun 24, 2011
Contract type
Dca
PIID NNX09CB71C

Description of requirement

WHILE IN THE 1970'S AND 1980'S, COMPOSITES WERE ADOPTED FOR AEROSPACE STRUCTURE FOR INCREASED PERFORMANCE AND WEIGHT SAVINGS, THE 1990'S AND 2000'S WITNESSED THE ATTENTION TOWARDS COST-EFFECTIVE FABRICATION. ALL THERMOSET PROCESSES THAT UTILIZE SUCH MACHINES RELY ON AUTOCLAVES TO CONSOLIDATE THE LAMINATES, AT SIGNIFICANT ACQUISITION AND OPERATIONAL EXPENSE. AUTOCLAVES TO CONSOLIDATE WINGS ARE HUGELY EXPENSIVE. AUTOCLAVES FOR FUSELAGES ARE NEARLY COST-PROHIBITIVE (ONLY ONE EXISTS). AUTOCLAVES FOR THE ARES V DO NOT EXIST. THE MARKETPLACE WOULD WELCOME A PROVEN OUT-OF-AUTOCLAVE FABRICATION TECHNOLOGY. THE TASKS IN THE ASI/UD-CCM STTR PHASE 1 WAS TO ASSESS THE PERFORMANCE OF THE CURRENT TP-ATP HEADS, DO A MODEL BASED PARAMETRIC STUDY TO DETERMINE POSSIBLE HEAD AND PROCESS PARAMETER CHANGES AND DEMONSTRATE AN IMPROVED UNDERSTANDING OF THE HEAD, WITH A GOAL OF AUTOCLAVE LEVEL PROPERTIES. A SET OF MODELS FOR THE IN SITU AUTOMATED TOW/TAPE PLACEMENT (ATP) PROCESSES THAT CAPTURE THE IMPORTANT PROCESS PHENOMENA WERE DEVELOPED BY UD-CCM. ACCUDYNE THEN MEASURED THE LAMINATE ROUGHNESS, FABRICATED SAMPLES USING A VARIETY OF CONDITIONS AND TESTED THE SAMPLES. TESTING OF THE LAMINATES INDICATE: PLACING WITH FLAT TAPE AND USING IMPROVED HEAD CHILLING INCREASES MECHANICAL PROPERTIES. COMPACTING WITH ONLY A LOAD REDUCES PROPERTIES. USING A VACUUM BAG OVEN RECONSOLIDATION IS INEFFECTIVE, AND EVEN REDUCES MECHANICAL PROPERTIES. THE PHASE 2 PROGRAM INNOVATION IS TO DEVELOP AND DEPLOY UNIVERSITY OF DELAWARE PROCESS MODELS TO ACCUDYNE'S THERMOPLASTIC TOW AND TAPE PLACEMENT HEAD TO REMEDY THE MECHANICAL PROPERTY SHORTFALL BETWEEN THE TWO FABRICATION PROCESSES USED TO MANUFACTURE LARGE COMPOSITE AEROSPACE STRUCTURE IMPORTANT TO NASA. AN ADDITIONAL ADVANTAGE THAT WOULD ACCRUE BY ADOPTING TP-ATP WOULD BE THE USE OF NOVEL THERMOPLASTIC MATERIALS WITH THERMAL STABILITY AND TOUGHNESS FAR IN EXCESS OF WHAT THERMOSETTING MATERIALS CAN ACHIEVE.

Dates and value

Award date
Signed on Jun 22, 2009
Potential end of performance
Sep 29, 2011

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jun 24, 2011. View on USAspending · Recipient on SAM.gov

Recipient

LocationNEWARK, DE
UEIQLJLWGE4MHD4
Business sizeSmall businessSize at award, per the contracting officer

Business types and certifications

For-profit organizationCorporation (not tax-exempt)

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. LANGLEY RESEARCH CENTER

Place of performance

Place of performance
Newark, New Castle County, Delaware 19713-1147 United States Of America
Congressional district (place of performance)
DE-00As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Full and open competition after exclusion of sourcesD
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
Small business set aside - totalSBA
Contract pricing
Firm fixed priceJ
Offers received
2

Contract details

Subcontracting plan
Plan not requiredB
Major program
Generating autoclave-level mechanical properties w
Cost Accounting Standards clause
No - CAS waiver approvedN
Certified cost or pricing data
No
Service Contract Act labor standards
No
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Multi-year contract
Yes
Performance-based service acquisition
Yes - service where PBA is used.Y

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Jun 22, 2009Base obligation at award: $300,000
Latest action
Jun 24, 2011 — Funding onlyModification 7; obligation change +$91,271; funding only: changes obligations, not scope
Latest substantive action
Sep 7, 2010 — Supplemental agreement (within scope)Modification 2
Latest funding action
Jun 24, 2011 — Funding onlyModification 7; obligation change +$91,271; funding only: changes obligations, not scope
Actions by type
  • Base award1
  • Funding only5
  • Supplemental agreement (within scope)2
8 actions recorded, Jun 22, 2009 to Jun 24, 2011; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability includedC
EPA-designated product
Not requiredE
Research program (SBIR/STTR)
Small technology transfer research program phase iiST2
Walsh-Healey Act (materials and supplies)
Yes

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
DcaD
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
NSSC0
Transactions recorded under this award key
8

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
LARC0