Po NNX09CD13PFLOMETRICS, INC.
Overview
Award facts
- Period of performance
- Jan 22, 2009 to Jul 22, 2009
- Ended
- Modifications
- 0
- Latest action Jan 14, 2009
- Contract type
- Po
- PIID NNX09CD13P
Description of requirement
PISTONLESS PUMPS FOR NANOSAT LAUNCH AND SAMPLE RETURN VEHICLES THIS PROPOSAL RESPONDS TO THE REQUEST FOR PUMPS FOR PRESSURE-FED PROPULSION SYSTEMS WITH A PISTONLESS PUMP WHEREIN A PRESSURANT ACT DIRECTLY ON THE PROPELLANT(S) IN A SET OF PUMP CHAMBERS. THE PUMP SYSTEM WILL WORK FOR BOTH IN-SPACE AND SPACECRAFT DESCENT AND ASCENT SYSTEMS, AND IT IS APPLICABLE TO NANOSAT LAUNCH VEHICLE (NLV) TECHNOLOGIES AS WELL. WHEN INTEGRATED INTO A FULL PROPULSION SYSTEM, THIS PUMP WILL INCREASE PAYLOAD MASS FRACTION, RELIABILITY, SAFETY, AND OPERATING FLEXIBILITY. THE SAME PUMP CAN BE USED FOR THE MAIN ENGINE, ATTITUDE CONTROL THRUSTERS, AND FUEL TRANSFER, SINCE THE PUMP PROVIDES VARIABLE PRESSURE AT VARIABLE FLOW WITHOUT USING EXTRA CONSUMABLES. THE PISTONLESS DESIGN AVOIDS SLIDING SEALS, WHICH CAN CAUSE PROBLEMS FOR PISTON PUMPS. NO PRECISION COMPONENTS ARE NEEDED, AND ALL ACTIVE COMPONENTS CAN BE REDUNDANT AND/OR CONTAMINATION-TOLERANT. FOR SPACE TRANSPORTATION OR LAUNCH VEHICLE SYSTEMS WITH LIQUID/SUPERCRITICAL HELIUM AND/OR MULTI-STAGE AUTOGENOUS PRESSURIZATION, "SYSTEM ISP" INCLUDING PRESSURANT AND TANK MASS CAN BE INTERMEDIATE BETWEEN GAS-GENERATOR AND STAGED COMBUSTION TURBOPUMP SYSTEMS, BUT AT MUCH LOWER COST AND COMPLEXITY THAN WITH EITHER OF THOSE TYPES. THE PUMP HAS ALREADY BEEN DESIGNED, BUILT AND TESTED UNDER LAB CONDITIONS, PUMPING KEROSENE, LIQUID NITROGEN AND WATER. THE PERFORMANCE IMPROVEMENTS DUE TO INCLUSION OF THE PUMP IN VARIOUS SYSTEMS HAVE ALREADY BEEN ANALYZED. THE PURPOSE OF THIS SBIR IS TO BRING THE PISTONLESS PUMP TECHNOLOGY UP TO A TRL 5 LEVEL AND INTEGRATE IT INTO A NANOSAT LAUNCH VEHICLE. THE WORK TO BE DONE CONSISTS OF DESIGNING, BUILDING AND TESTING PUMP FEATURES FOR OPERATION UNDER VIBRATION, ACCELERATION AND REDUCED ABSOLUTE PRESSURE ENVIRONMENTS. THE PUMP WILL THEN BE INTEGRATED INTO A PROTOTYPE NLV FIRST STAGE AND A FULL DURATION GROUND TEST WILL BE CONDUCTED. IF THE BUDGET IS SUFFICIENT, WE WILL CONDUCT A FLIGHT TEST TO 50,000 FT. THE FLIGHT TEST PUMP AND DATA WILL BE DELIVERED TO NASA
Dates and value
- Award date
- Signed on Jan 14, 2009
- Potential end of performance
- Jul 21, 2009
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jan 14, 2009. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
- Funded by
- National Aeronautics and Space Administration
- GLENN RESEARCH CENTER
Place of performance
- Place of performance
- Solana Beach, San Diego County, California 92075-1255
- Congressional district (place of performance)
- CA-49As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- AR11R&D-AERO & SPACE TECH-B RES (research and development)
Competition
- Extent competed
- Full and open competition after exclusion of sourcesD
- Solicitation procedures
- Negotiated proposal/quoteNP
- Set-aside
- Small business set aside - totalSBA
- Contract pricing
- Firm fixed priceJ
- Offers received
- 6
Contract details
- Major program
- Pistonless pumps for nanosat launch and sample ret
- Cost Accounting Standards clause
- No - CAS waiver approvedN
- Service Contract Act labor standards
- No
- Government-furnished property
- Transaction does not use GFE/GFPN
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Multi-year contract
- No
- Performance-based service acquisition
- Yes - service where PBA is used.Y
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Jan 14, 2009Base obligation at award: $100,000
- Latest action
- Jan 14, 2009 — Base awardModification 0; obligation change +$100,000
- Actions by type
- Base award1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Simplified procedures for commercial items
- No
Pricing and financing
- Paid by purchase card
- No
- Latest action: change in base and exercised options
- $100,000
- Latest action: change in base and all options
- $100,000
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability incluC
- EPA-designated product
- Not requiredE
- Research program (SBIR/STTR)
- Small business innovation research program phase i actionSR1
- Walsh-Healey Act (materials and supplies)
- No
- Construction wage rates (Davis-Bacon)
- No
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
Structure
- Award or IDV
- Award
- Award type
- PoB
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- NSSC0
- Transactions recorded under this award key
- 1
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- GRC00