GovChime
AWARDPOSmall business

Po NNX09CD83PNUVOTRONICS CORPORATION

Overview

Award facts

Period of performance
Jun 21, 2010 to Jul 22, 2009
Ended
Modifications
1
Latest action Jun 22, 2010
Contract type
Po
PIID NNX09CD83P

Description of requirement

3D MICROFABRICATED LOW LOSS RECONFIGURABLE COMPONENTS TYPICAL COMMUNICATION SATELLITES USE TRADITIONAL WAVEGUIDE FRONT-END ARCHITECTURES DUE TO EXCELLENT ELECTRICAL PERFORMANCE AND HIGH RELIABILITY. HOWEVER, THESE SYSTEMS ARE EXTREMELY MASSIVE AND USE LARGE VOLUME MOSTLY DUE TO THE LOW-INSERTION LOSS WAVEGUIDE. REPLACEMENT OF THE WAVEGUIDE COMPONENTS BY MICROFABRICATED PARTS WITHOUT SUBSTANTIALLY AFFECTING THE ELECTRICAL PERFORMANCE CAN LEAD TO A BREAKTHROUGH IN WIRELESS COMMUNICATIONS. THE OVERALL GOAL OF THE PROPOSED SBIR PROJECT IS TO DEVELOP LOW-COST, RELIABLE, MINIATURIZED RF MEMS SWITCH COMPONENTS SUITABLE FOR A VARIETY OF COMMUNICATION SUBSYSTEMS. TWO APPROACHES WILL BE INVESTIGATED. THE FIRST APPROACH WILL BE LOOKING AT MONOLITHICALLY INTEGRATING RF MEMS SWITCHES WITHIN THE POLYSTRATATM TECHNOLOGY, DEVELOPED AT NUVOTRONICS IN BLACKSBURG, VA AS PART OF THE DARPA 3DMERFS PROGRAM. THIS APPROACH SHOULD ENABLE DISRUPTIVE LOW-LOSS AND HIGH-Q RF COMPONENTS FROM S-BAND UP TO W-BAND. THE SECOND APPROACH WILL RELY ON STATE OF THE ART KNOWN GOOD RF SWITCHES TO BE ASSEMBLED ON THE LOW LOSS POLYSTRATA BACKPLANE. THIS SECOND APPROACH WILL PROVIDE LOWER LOSS, HIGHER DENSITY AND HIGHER POWER HANDLING THAN THE CURRENT RF MEMS COMPONENTS. THE PROPOSED TECHNOLOGY CAN BE APPLIED TO MULTIPLE OPERATING FREQUENCIES AT A MINIMUM COST DUE TO THE BATCH CAPABILITY OF THE POLYSTRATA PROCESS.

Dates and value

Award date
Signed on Jan 21, 2009
Potential end of performance
Jul 21, 2009

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jun 22, 2010. View on USAspending · Recipient on SAM.gov

Recipient

LocationBLACKSBURG, VA
UEIQPFCT4BB4C57
Business sizeSmall businessSize at award, per the contracting officer

Business types and certifications

For-profit organizationFederally funded research and development centerLimited liability companyManufacturer of goods

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. JET PROPULSION LABORATORY

Place of performance

Place of performance
Blacksburg, Montgomery County, Virginia 24060-6604
Congressional district (place of performance)
VA-09As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Full and open competition after exclusion of sourcesD
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
Small business set aside - totalSBA
Contract pricing
Firm fixed priceJ
Offers received
6

Contract details

Subcontracting plan
Plan not requiredB
Major program
3d microfabricated low loss reconfigurable compone
Cost Accounting Standards clause
No - CAS waiver approvedN
Service Contract Act labor standards
No
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Multi-year contract
No
Performance-based service acquisition
Yes - service where PBA is used.Y

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Jan 21, 2009Base obligation at award: $88,370
Latest action
Jun 22, 2010 — CloseoutModification 1; obligation change -$0; administrative: no change in scope or value
Actions by type
  • Base award1
  • Closeout1
2 actions recorded, Jan 21, 2009 to Jun 22, 2010; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No
Latest action: change in base and exercised options
-$0
Latest action: change in base and all options
-$0

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability incluC
EPA-designated product
Not requiredE
Research program (SBIR/STTR)
Small business innovation research program phase i actionSR1
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
PoB
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
NSSC0
Transactions recorded under this award key
2

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
JPL00