GovChime
AWARDPOSmall business

Po NNX09CF03PADVANCED DYNAMICS CORPORATION

Overview

Award facts

Period of performance
Jul 6, 2010 to Jul 22, 2009
Ended
Modifications
1
Latest action Jul 6, 2010
Contract type
Po
PIID NNX09CF03P

Description of requirement

PHYSICS-BASED IDENTIFICATION, MODELING AND RISK MANAGEMENT FOR AEROELASTIC FLUTTER AND LIMIT-CYCLE OSCILLATIONS (LCO) THE PROPOSED RESEARCH PROGRAM WILL DEVELOP A PHYSICS-BASED IDENTIFICATION, MODELING AND RISK MANAGEMENT INFRASTRUCTURE FOR AEROELASTIC TRANSONIC FLUTTER AND LIMIT-CYCLE OSCILLATIONS (LCO). THIS CAPABILITY WILL BE BUILT UPON HIGH FIDELITY STATE-OF-THE-ART THEORETICAL/COMPUTATIONAL METHODS AS VALIDATED AND VERIFIED BY AVAILABLE EXPERIMENTAL DATA BASES, AND WILL INCLUDE (1) RAPID FLUTTER BOUNDARY DETERMINATION FOR A WIDE RANGE OF CONFIGURATIONS; (2) AN ASSESSMENT OF THE RELATIVE IMPORTANCE OF VARIOUS AERODYNAMIC AND STRUCTURAL NONLINEARITIES FOR AIRCRAFT AND AEROSPACE CONFIGURATIONS THAT ARE DETERMINED TO BE FLUTTER CRITICAL AND HENCE POTENTIALLY CAPABLE OF LCO; (3) AN ASSESSMENT OF EXPECTED LCO AMPLITUDES BASED UPON HIGH FIDELITY COMPUTATIONAL MODELS; (4) AN ASSESSMENT OF THE POTENTIAL FOR ACTIVE AND/OR PASSIVE ALLEVIATION OF LCO; AND (5) A PROPOSED RISK MANAGEMENT METHODOLOGY THAT INCORPORATES A PREDICTION OF TOLERABLE LCO AMPLITUDES AND THE CAPABILITY FOR REDUCING UNACCEPTABLE LCO RESPONSE. KEY CHALLENGES AND MILESTONES TO BY MET INCLUDE (1) A DEMONSTRATION OF THE USE OF NAVIER-STOKES BASED CFD MODELS AND NONLINEAR STRUCTURAL MODELS, INCLUDING THE USE OF SYSTEM IDENTIFICATION METHODS AS APPROPRIATE AND NEEDED TO PREDICT FLUTTER AND LCO; (2) A DEMONSTRATION OF ACCURATE MODELING OF AERODYNAMIC AND STRUCTURAL NONLINEARITIES SUCH AS LARGE SHOCK WAVE MOTION, SEPARATED FLOW, STRUCTURAL FREEPLAY AND LARGE GEOMETRIC STRUCTURAL DEFLECTIONS AND THEIR IMPACT ON FLUTTER AND LCO; (3) CHARACTERIZATION AND EVALUATION OF NONLINEAR DAMPERS AND NONLINEAR STIFFNESS DEVICES FOR ALLEVIATING LCO; (4) CHARACTERIZATION AND EVALUATION OF ACTIVE CONTROL SYSTEMS FOR ALLEVIATING LCO; AND (5) DESIGN AND DEMONSTRATION IN WIND TUNNEL TEST AND FLIGHT TEST OF AN LCO ALLEVIATION DEVICE.

Dates and value

Award date
Signed on Jan 8, 2009
Potential end of performance
Jul 5, 2010

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jul 6, 2010. View on USAspending · Recipient on SAM.gov

Recipient

LocationLEXINGTON, KY
UEIMKAHQ1G7ZL91
Business sizeSmall businessSize at award, per the contracting officer

Business types and certifications

Minority-ownedFor-profit organizationFederally funded research and development centerCorporation (not tax-exempt)

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. LANGLEY RESEARCH CENTER

Place of performance

Place of performance
Lexington, Fayette County, Kentucky 40511-1267
Congressional district (place of performance)
KY-06As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Full and open competition after exclusion of sourcesD
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
Small business set aside - totalSBA
Contract pricing
Firm fixed priceJ
Offers received
6

Contract details

Subcontracting plan
Plan not requiredB
Major program
Physics-based identification, modeling and risk ma
Cost Accounting Standards clause
No - CAS waiver approvedN
Service Contract Act labor standards
No
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Multi-year contract
No
Performance-based service acquisition
Yes - service where PBA is used.Y

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Jan 8, 2009Base obligation at award: $99,938
Latest action
Jul 6, 2010 — CloseoutModification 1; obligation change -$2; administrative: no change in scope or value
Actions by type
  • Base award1
  • Closeout1
2 actions recorded, Jan 8, 2009 to Jul 6, 2010; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No
Latest action: change in base and exercised options
-$2
Latest action: change in base and all options
-$2

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability incluC
EPA-designated product
Not requiredE
Research program (SBIR/STTR)
Small business innovation research program phase i actionSR1
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
PoB
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
NSSC0
Transactions recorded under this award key
2

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
LARC0