Po NNX09CF40PDALLAS OPTICAL SYSTEMS INC
Overview
Award facts
- Period of performance
- Jan 22, 2009 to Jul 22, 2009
- Ended
- Modifications
- 0
- Latest action Jan 14, 2009
- Contract type
- Po
- PIID NNX09CF40P
Description of requirement
LOW COST VERY LARGE DIAMOND TURNED METAL MIRROR ELECTROLYTIC PLATING OF HIGH PHOSPHORUS NICKEL PHOSPHORUS ALLOY WILL ENCAPSULATE A MACHINED MIRROR SUBSTRATE MASTER MADE OF FINE CELL PLASTIC FOAM SUCH AS POLYSTYRENE THAT HAS BEEN SEALED AND MADE ELECTRICALLY CONDUCTIVE WITH PAINTED-ON COATINGS. AFTER ENCAPSULATION WITH UP TO ONE MILLIMETER OF NIP METAL HOLES WILL BE DRILLED AND THE PLASTIC MASTER WILL BE DISSOLVED WITH A SOLVENT SUCH AS ACETONE AND REMOVED. PRIOR TO ENCAPSULATION PLATING ROUND OR OTHER CROSS SECTION TUBES ARE INSERTED THRU HOLES IN THE PLASTIC FOAM SO THAT THEY ARE INCORPORATED INTO THE ELECTROFORMED MIRROR STRUCTURE WHEN THE MASTER IS ENCAPSULATED WITH MORE NIP. THE TUBES WHICH CONNECT THE FRONT AND BACK SURFACES OF THE MIRROR ARE MADE BY ELECTROFORMING WITH THE SAME NIP ALLOY. THE FINISHED MIRROR SUBSTRATE WILL BE DIAMOND TURNED AND THE VERY LOW CUTTING FORCE DIAMOND TURNING PROCESS WILL ALLOW FABRICATION OF A VERY THIN MIRROR FACE PLATE WITHOUT PRINT THROUGH SINCE THERE IS ONLY A VERY LOW PRESSURE ON THE MIRROR FROM DIAMOND TURNING. MACHINING OF PLASTIC FOAM IS ACCOMPLISHED VERY QUICKLY AND THE FOAM MATERIAL IS VERY LOW COST. IN A PRODUCTION MODE THE EXPENDABLE FOAM PLASTIC MASTERS COULD THEMSELVES BE MOLDED. THE SIZE OF THE MIRRORS IS ONLY LIMITED BY THE CAPACITIES OF THE PLATING BATH AND THE DIAMOND TURNING MACHINE. THE PROCESS IS APPLICABLE TO ANY OPTICAL CONTOUR AND TO THE MANUFACTURE OF OFF-AXIS SEGMENTS.
Dates and value
- Award date
- Signed on Jan 14, 2009
- Potential end of performance
- Jul 21, 2009
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jan 14, 2009. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
- Funded by
- National Aeronautics and Space Administration
- MARSHALL SPACE FLIGHT CENTER
Place of performance
- Place of performance
- Rockwall, Texas 75032-6708
- Congressional district (place of performance)
- TX-04As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- AR11R&D-AERO & SPACE TECH-B RES (research and development)
Competition
- Extent competed
- Full and open competition after exclusion of sourcesD
- Solicitation procedures
- Negotiated proposal/quoteNP
- Set-aside
- Small business set aside - totalSBA
- Contract pricing
- Firm fixed priceJ
- Offers received
- 6
Contract details
- Subcontracting plan
- Plan not requiredB
- Major program
- Low cost very large diamond turned metal mirror
- Cost Accounting Standards clause
- No - CAS waiver approvedN
- Service Contract Act labor standards
- No
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Multi-year contract
- No
- Performance-based service acquisition
- Yes - service where PBA is used.Y
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Jan 14, 2009Base obligation at award: $97,940
- Latest action
- Jan 14, 2009 — Base awardModification 0; obligation change +$97,940
- Actions by type
- Base award1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Simplified procedures for commercial items
- No
Pricing and financing
- Paid by purchase card
- No
- Latest action: change in base and exercised options
- $97,940
- Latest action: change in base and all options
- $97,940
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability incluC
- EPA-designated product
- Not requiredE
- Research program (SBIR/STTR)
- Small business innovation research program phase i actionSR1
- Walsh-Healey Act (materials and supplies)
- No
- Construction wage rates (Davis-Bacon)
- No
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- PoB
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- NSSC0
- Transactions recorded under this award key
- 1
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- MSFC0