GovChime
AWARDDCASmall business

Dca NNX11CB57CEIKOS INC

Overview

Award facts

Period of performance
Dec 5, 2012 to May 31, 2013
Ended
Modifications
6
Latest action Dec 5, 2012
Contract type
Dca
PIID NNX11CB57C

Description of requirement

DUST MITIGATION IS CRITICAL TO THE SURVIVABILITY OF VEHICLE AND INFRASTRUCTURE COMPONENTS AND SYSTEMS AND TO THE SAFETY OF ASTRONAUTS DURING EVAS AND PLANETARY SURFACE OPERATIONS. BY COUPLING EIKOS INVISICONREG NANOCOMPOSITE CONDUCTORS WITH EXISTING DUST MITIGATION DUST SHIELD TECHNOLOGY DEVELOPED AT NASA-KSC, THE PHASE I PROGRAM DEMONSTRATED AN ENABLING APPROACH TO PRODUCING ELECTRODYNAMIC DUST MITIGATION DEVICES ON A WIDE VARIETY OF SURFACES NOT POSSIBLE WITH TRADITIONAL METAL BASED ELECTRODE MATERIALS. EIKOS REPRODUCED PROVEN NASA SPIRAL ELECTRODES USING INVISICONREG PATTERNED ONTO TRANSPARENT PLASTICS, TYVEKREG FABRIC, AND SILICONE RUBBER SHEETS; EMPLOYING INKJET AND SPRAY DEPOSITION METHODS, TWO CNT INK FORMULATIONS, AND FOUR DIELECTRIC BINDERS TO CREATE WORKING DEVICES. THESE INVISICONREG-BASED DEVICES ARE FAR MORE FLEXIBLE THEN TRADITIONAL DEVICES AND EXHIBIT SUPERIOR DURABILITY TO ABRASION, ELONGATION, AND THERMAL CYCLING. A DUST MITIGATION SYSTEM UTILIZING THIS TECHNOLOGY HAS BROAD VALUE TO MANY NASA MISSION DIRECTORATES AND TERRESTRIAL COMMERCIAL APPLICATIONS. THE PHASE II PROJECT WILL BUILD ON THESE SUCCESSES AND INTEGRATE THE ELECTRODE INTO LARGER SURFACES, AND MORE COMPLEX COMPONENTS. FURTHER, EXTENSIVE DUST MITIGATION, AND BOTH ENVIRONMENTAL AND MECHANICAL TESTING, WILL BE CONDUCTED TO POSITION THIS ELECTRODE TECHNOLOGY FOR INSERTION INTO WINDOWS, FABRICS, AND ELASTOMERIC COMPONENTS IN SPACE AND TERRESTRIAL APPLICATIONS.

Dates and value

Award date
Signed on Jun 1, 2011
Potential end of performance
May 30, 2013

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Dec 5, 2012. View on USAspending · Recipient on SAM.gov

Recipient

LocationFRANKLIN, MA
UEIX2J1C6N7K4A6
Business sizeSmall businessSize at award, per the contracting officer
Parent companyEIKOS INC

Business types and certifications

For-profit organization

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. KENNEDY SPACE CENTER

Place of performance

Place of performance
Franklin, Norfolk County, Massachusetts 02038-3034
Congressional district (place of performance)
MA-04As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Full and open competition after exclusion of sourcesD
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
Small business set aside - totalSBA
Contract pricing
Firm fixed priceJ
Offers received
2

Contract details

Subcontracting plan
Plan not requiredB
Major program
Nanotube electrodes for dust mitigation
Cost Accounting Standards clause
No - CAS waiver approvedN
Certified cost or pricing data
No
Service Contract Act labor standards
No
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Multi-year contract
Yes
Performance-based service acquisition
Yes - service where PBA is used.Y

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Jun 1, 2011Base obligation at award: $75,000
Latest action
Dec 5, 2012 — Funding onlyModification 6; obligation change +$199,631; funding only: changes obligations, not scope
Latest funding action
Dec 5, 2012 — Funding onlyModification 6; obligation change +$199,631; funding only: changes obligations, not scope
Actions by type
  • Base award1
  • Funding only4
  • Other administrative action2
7 actions recorded, Jun 1, 2011 to Dec 5, 2012; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability incluC
EPA-designated product
Not requiredE
Research program (SBIR/STTR)
Small business innovation research program phase ii actionSR2
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
DcaD
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
NSSC0
Transactions recorded under this award key
7

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
KSC00