GovChime
AWARDPOSmall business

Po NNX11CD58PMUSYN INC

Overview

Award facts

Period of performance
Jun 3, 2011 to Aug 17, 2011
Ended
Modifications
3
Latest action Jun 3, 2011
Contract type
Po
PIID NNX11CD58P

Description of requirement

ADAPTIVE CONTROL OFFERS AN OPPORTUNITY TO FULFILL PRESENT AND FUTURE AIRCRAFT SAFETY OBJECTIVES THOUGH AUTOMATED VEHICLE RECOVERY WHILE MAINTAINING PERFORMANCE AND STABILITY REQUIREMENTS IN THE PRESENCE OF UNKNOWN OR VARYING OPERATING ENVIRONMENT. FUTURE AIRCRAFT ARE A NATURAL APPLICATION OF ADAPTIVE CONTROL. THESE AIRCRAFT WILL BE MORE FUEL EFFICIENT, HAVE LONGER OPERATING RANGES THOUGH MORE FLEXIBLE AIRCRAFT STRUCTURES. THIS INCREASED FLEXIBILITY WILL RESULT IN STRUCTURAL MODES BEING IN THE SAME FREQUENCY RANGE AS THE RIGID BODY MODES. THE TRADITIONAL NON-ADAPTIVE CONTROL DESIGN APPROACH TO ADDRESS THE AEROSERVOELASTIC (ASE) INTERACTION OF DECOUPLING THE RIGID BODY AND STRUCTURAL DYNAMICS WILL NOT WORK. FURTHERMORE, THE APPLICATION OF ADAPTIVE CONTROL TO THESE FLEXIBLE AIRCRAFT MAY RESULT IN UNDESIRED ASE EXCITATION LEADING TO STRUCTURAL DAMAGE OR FAILURE. HENCE AN INTEGRATED FLIGHT CONTROL SYSTEM IS NEEDED FOR GUST LOAD ALLEVIATION, FLUTTER SUPPRESSION AND RIGID BODY CONTROL OF THE AIRCRAFT WHICH WORKS IN CONCERT WITH THE ADAPTIVE CONTROL SYSTEM FOR IMPROVED RESILIENCE AND SAFETY. MUSYN PROPOSES AN INTEGRATED APPROACH BASED ON LINEAR, PARAMETER-VARYING (LPV) CONTROL TO THE DESIGN OF THE FLIGHT CONTROL, LOAD ALLEVIATION AND FLUTTER SUPPRESSION ALGORITHMS. THE PHASE I AND PHASE II RESEARCH WILL FOCUS ON APPLYING AND EXTENDING LPV TECHNIQUES TO MODEL, DESIGN, ANALYZE AND SIMULATE CONTROL ALGORITHMS FOR FLEXIBLE AIRCRAFT. THE OBJECTIVE IS TO COMBINE THE INTEGRATED LPV FLIGHT CONTROL SYSTEM WITH ADAPTIVE CONTROL TO PRESERVE RIGID BODY PERFORMANCE DURING UPSETS WHILE RETAINING THE LOAD ALLEVIATION AND FLUTTER SUPPRESSION CHARACTERISTICS OF THE NOMINALLY AUGMENTED AIRCRAFT. PHASE I WILL DEVELOP A PROTOTYPE LPV FRAMEWORK FOR MODELING, ANALYSIS, CONTROL AND SIMULATION AND PHASE II WILL DEVELOP A COMPREHENSIVE LPV SOFTWARE TOOL SUITE.

Dates and value

Award date
Signed on Feb 17, 2011
Potential end of performance
Nov 29, 2011

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jun 3, 2011. View on USAspending · Recipient on SAM.gov

Recipient

LocationSAINT PAUL, MN
UEISMZPVK1J3PS1
Business sizeSmall businessSize at award, per the contracting officer
Parent companyMUSYN INC

Business types and certifications

For-profit organizationSubchapter S corporationCorporation (not tax-exempt)

Self-reported at the time of the action.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. ARMSTRONG FLIGHT RESEARCH CENTER

Place of performance

Place of performance
Minneapolis, Hennepin County, Minnesota 55414-5377
Congressional district (place of performance)
MN-05As reported at the time of the action

Classification and competition

Classification

Product or service (PSC)
AR11R&D-AERO & SPACE TECH-B RES (research and development)

Competition

Extent competed
Full and open competition after exclusion of sourcesD
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
Small business set aside - totalSBA
Contract pricing
Firm fixed priceJ
Offers received
4

Solicitation and notices

Solicitation ID
SBIR11PH01(as reported)

Contract details

Subcontracting plan
Plan not requiredB
Major program
Adaptive linear parameter varying control for aero
Service Contract Act labor standards
No
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Performance-based service acquisition
Yes - service where PBA is used.Y

Transaction history

Modification history

Base award
Feb 17, 2011Base obligation at award: $8,334
Latest action
Jun 3, 2011 — Funding onlyModification 3; obligation change +$54,825; funding only: changes obligations, not scope
Latest funding action
Jun 3, 2011 — Funding onlyModification 3; obligation change +$54,825; funding only: changes obligations, not scope
Actions by type
  • Base award1
  • Funding only3
4 actions recorded, Feb 17, 2011 to Jun 3, 2011; each action counted once.

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability incluC
EPA-designated product
Not requiredE
Research program (SBIR/STTR)
Small business innovation research program phase i actionSR1
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
PoB
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
NSSC0
Transactions recorded under this award key
4

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
DFRC0