GovChime
AWARDPOSmall business

Po NNX11CE32PGRAINFLOW DYNAMICS INC

Overview

Award facts

Period of performance
Jul 27, 2011 to Sep 29, 2011
Ended
Modifications
4
Latest action Jul 27, 2011
Contract type
Po
PIID NNX11CE32P

Description of requirement

UTILIZING CENTRIFUGAL FORCE AS THE PRIMARY BODY-FORCE, COMBINED WITH BOTH SHEARING FLOW AND VIBRATORY MOTION THE PROPOSED CENTRIFUGAL-SIEVE SEPARATORS CAN PROVIDE EFFICIENT GRAVITY-LEVEL-INDEPENDENT SIZE CLASSIFICATION OF GRANULAR FEEDSTOCK LIKE LUNAR REGOLITH. STANDARD SIZE SEPARATION METHODS FOR DRY MATERIALS OFTEN DEPEND ON GRAVITY AS THE PRIMARY BODY FORCE. FOR SEPARATION OF SMALL SIZES, GRAVITY-FORCE IS USUALLY SUPPLEMENTED WITH VIBRATION AND SHEARING FLOW. GRANULAR MATERIALS NATURALLY STRATIFY DURING SHEAR-FLOW WITH LARGER PARTICLES RISING TO THE TOP. DEPENDING ON FREQUENCY AND INTENSITY, VIBRATIONS ALONE CAN INDUCE LARGE PARTICLES TO RISE TO THE TOP IN A GRANULAR BED, INDEPENDENT OF SHEAR FLOW. THE PROPOSED CENTRIFUGAL SIZE-SEPARATORS UTILIZE THE NATURAL SIZE STRATIFICATION OF FLOWING GRANULAR SOLIDS. THEY WILL FUNCTION EQUALLY WELL UNDER REDUCED GRAVITY CONDITIONS AND IN VACUUM. THE NOMINAL DESIGN IS A CONFIGURATION WITH ONLY ONE MOVING PART AND NO BLADES, OR OTHER HIGH-WEAR COMPONENTS. SHEARING FLOW AND VIBRATIONS COMBINED WITH A SIZE-SEPARATING SCREEN AT THE OUTSIDE (OR 'BOTTOM') OF THE FLOW WILL SEPARATE PARTICLES, WITH THE FINES PASSING THROUGH THE OUTER WALL SCREEN, AND THE COARSE MATERIAL PASSING AXIALLY THROUGH THE CONTINUOUS FEED SYSTEM. MULTIPLE SIZE SEPARATION STREAMS ARE POSSIBLE. ALTERNATE DESIGNS WITH SHEAR-ENHANCING BLADES, 'ABOVE' OR INSIDE THE SCREEN, WILL ALSO BE EVALUATED. VARIOUS APPROACHES FOR SCREEN DEBLINDING, AND OTHER ROBUSTNESS ENHANCEMENTS, ARE PART OF THE PROPOSED DESIGNS. WITH APPROPRIATE SELECTION OF PASSING-SCREEN SIZE, AND DEBLINDING ENHANCEMENTS, THE CENTRIFUGAL-SIEVES COULD BE USED FOR REGOLITH PROCESSOR FEEDSTOCK CONDITIONING TO REMOVE MATERIAL>0.5CM DIAMETER, AND WITH ALTERNATE SETTINGS AND SCREEN SIZE, ALSO USED FOR A DEGREE OF BENEFICIATION, TO SELECT PARTICULAR SIZE RANGES THAT HAVE THE HIGHEST PERCENTAGE OF DESIRED MINERAL CONTENT. THE CENTRIFUGAL-SIEVE CONCEPT CAN BE SCALED TO ANY DESIRED MASS FLOW RATE.

Dates and value

Award date
Signed on Feb 18, 2011
Potential end of performance
Sep 28, 2011

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jul 27, 2011. View on USAspending · Recipient on SAM.gov

Recipient

LocationLIVERMORE, CA
UEISKAKGHZYFEM1
Business sizeSmall businessSize at award, per the contracting officer

Business types and certifications

For-profit organizationSubchapter S corporationCorporation (not tax-exempt)

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. GLENN RESEARCH CENTER

Place of performance

Place of performance
Livermore, Alameda County, California 94550-5928
Congressional district (place of performance)
CA-14As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Full and open competition after exclusion of sourcesD
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
Small business set aside - totalSBA
Contract pricing
Firm fixed priceJ
Offers received
4

Solicitation and notices

Solicitation ID
SBIR11PH01(as reported)

Contract details

Subcontracting plan
Plan not requiredB
Major program
Centrifugal sieve for size-segregation/ beneficiat
Service Contract Act labor standards
No
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Performance-based service acquisition
Yes - service where PBA is used.Y

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Feb 18, 2011Base obligation at award: $8,334
Latest action
Jul 27, 2011 — Supplemental agreement (within scope)Modification 4
Latest substantive action
Jul 27, 2011 — Supplemental agreement (within scope)Modification 4
Latest funding action
Jun 7, 2011 — Funding onlyModification 3; obligation change +$51,831; funding only: changes obligations, not scope
Actions by type
  • Base award1
  • Funding only3
  • Supplemental agreement (within scope)1
5 actions recorded, Feb 18, 2011 to Jul 27, 2011; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability incluC
EPA-designated product
Not requiredE
Research program (SBIR/STTR)
Small business innovation research program phase i actionSR1
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
PoB
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
NSSC0
Transactions recorded under this award key
5

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
GRC00